| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | L1 | Accepted-AOC L1 Bidder is Financially and Technically Qualified | |
| 2 | L2₹4.9 L+₹13,000 (2.73%)Rejected-AOC BHANIYAWALA 248140 DISTRICT DEHRADUN | DEHRADUN | UTTARAKHAND | 248140 | L2 | Rejected-AOC L1 Bidder is Financially and Technically Qualified | |
| 3 | L3₹5.4 L+₹62,400 (13.1%)Rejected-AOC LANE NO 03 PRAGATI VIHAR RISHIKESH | L3 | Rejected-AOC L1 Bidder is Financially and Technically Qualified | |
| 4 | L4₹6 L+₹1.2 L (25.8%)Rejected-AOC | L4 | Rejected-AOC L1 Bidder is Financially and Technically Qualified |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
19 Jan 2023, 5:00 pmClosed
Superintending Engineer
400 kV Operation and Maintenance Circle, 400 kV Substation Srinagar (Garhwal)
Providing and Fixing of Single and Three Phase AC Supply Distribution in entire switchyard of 132 kV Substation Srinagar (Garhwal)
2022_PTCUX_52275_1
T-14_SE_OandM_Sri_2022-23
Open Tender
Electrical Works
Item Rate
90 days
Srinagar (Garhwal)
Please refer Tender documents.
6 documents required · 6 mandatory
₹295
Yes
EE, 400 kV O and M Division
₹15,000
Yes
8 Aug 2023
3 Dec 2022
20 Jan 2023
4 Dec 2022
19 Jan 2023
4 Dec 2022
Amount
To facilitate Maintenance work (cutting, welding, oil filtration), Testing work and to improve lighting of switchyard area at 132KV substation, Srinagar (G) the following works are required to be done:
Providing and laying of 3-phase 4 core (25 sqmm) cable from ACDB (which is lying inside control room Building) to switchyard area (length approximately 180Mtrs) through trenches and in open area must be concealed with PVC hard pipe in ground 1.5 foot below the plinth level where ever required.
Providing and fixing of iron clade distribution box (440V AC) to provide complete shelter from dust, rain and other weather conditions including all required MCB's, TB & TB metal strips and other wirings. Proper earthing of distribution box must be done. The Distribution Box must be installed in the switchyard area at a height of approx. 5 feet from the ground level.
Installation of all required MCB's as per required direction of site incharge for lightning of switchyard area of 132KV/66KV/33KV and one spare MCB of required rating with power socket for maintenance work.
Provide and install 16A MCB for each lights of switchyard (almost 20nos). MCB's shall be installed inside iron clade box with proper insulation at each light pole located in the switchyard at a height of approx. 5 feet from the ground level. Connection shall be made available from the 40A 1 phase 230V AC MCB from MCCB box through single phase 2.5 sqmm 2 core cable (approximately 400 Mtrs). Proper earthing of each box shall be done.
All above material, labour and T&P shall be provided by contractor for proper completion of work under PTCUL norms and by the instruction of site-incharge .
LIV TECHNOLOGY
KOTHARI ENTERPRISES
MAYANK ELECTRICAL WORK
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .