Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 CrAccepted-AOC | ₹3.3 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.3 Cr+₹1.4 L (0.43%)Rejected-Finance KERALA KL | IDUKKI | KERALA | 685533 | ₹3.3 Cr+₹1.4 L (0.43%) | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical GROUND FLOOR KARAPARAMBA BRICK TOWN BUILDING KOZHIKODE 673010 | KOZHIKODE | KOZHIKODE | KERALA | 673010 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | Febin G Kottukappalli L2 | Geogy George K L3 | Fahad Marakkar P P L1 |
|---|---|---|---|---|---|---|
| 1.00Demolishing/Dismantling | ||||||
| 1.00 | 2.4.10.C:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works<br>Above 900 mm | 130 | metre | 1,540 ₹2,00,200 | 1,540 ₹2,00,200 | 1,400 ₹1,82,000 Lowest |
| 1.00 | OD305655/2025-2026:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000
metres, stacking serviceable and unserviceable materials separately Granular course- by
mechanical means (modified item 2.5.2.A)
Bituminous course - By Mechanical Means | 100.65 | cum | 450 ₹45,292.5 | 455 ₹45,795.75 | 400 ₹40,260 Lowest |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 504.55 | cum | 870 ₹4,38,956.76 | 900 ₹4,54,093.2 | 790 ₹3,98,592.92 Lowest |
| 2.00BRIDGE | ||||||
| 2.00 | OD305691/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m
bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and
maintaining the same leak proof till the completion of the work and clearing the site by
dismantling the bund after completion of the work.etc.complete. | 191.6 | metre | 1,270 ₹2,43,332 | 1,270 ₹2,43,332 | 1,150 ₹2,20,340 Lowest |
| 2.00 | OD382360/2025-2026:DOWEL BARS- Supplying and providing MS dowel bars of size 25mm dia of 2.0m long (1 metre in rock and 1 metre in concrete) including drilling holes of 30mm dia and filling the ga[p with cement grout (0.50kg/each) etc complete, | 240 | each | 1,050 ₹2,52,000 | 1,050 ₹2,52,000 | 950 ₹2,28,000 Lowest |
| 2.00 | OD305692/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including
conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc
complete | 1,520 | hour | 510 ₹7,75,200 | 510 ₹7,75,200 | 500 ₹7,60,000 Lowest |
| 2.00 | 3.13.5.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Marshy soil - Mechanical Means | 102.23 | cum | 530 ₹54,179.78 | 530 ₹54,179.78 | 500 ₹51,113 Lowest |
| 2.00 | 3.13.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock ( blasting prohibited ) - Mechanical Means | 351.69 | cum | 1,060 ₹3,72,788.22 | 1,060 ₹3,72,788.22 | 1,000 ₹3,51,687 Lowest |
Tender Value
₹3.3 Cr
EMD Value
₹1 L
Closing Date
24 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER DIST PANCHAYATH PALAKKAD
GENERAL-NAVAKERALASADAS-2024-25- NENMMARA LAC-ALAMPALLAM B R I D G E
2025_LSGD_819412_6
11/ET/EE/2025-26 DT-31.10.2025
Open Tender
Civil Works - Others
Item Rate
360 days
DISTRICT PANCHAYATH PALAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,270
Yes
₹1 L
Yes
29 Jan 2026
6 Nov 2025
26 Nov 2025
6 Nov 2025
24 Nov 2025
6 Nov 2025
Amount
Demolishing/Dismantling
2.4.10.C:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works<br>Above 900 mm
OD305655/2025-2026:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Granular course- by mechanical means (modified item 2.5.2.A) Bituminous course - By Mechanical Means
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
BRIDGE
OD305691/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
OD382360/2025-2026:DOWEL BARS- Supplying and providing MS dowel bars of size 25mm dia of 2.0m long (1 metre in rock and 1 metre in concrete) including drilling holes of 30mm dia and filling the ga[p with cement grout (0.50kg/each) etc complete,
OD305692/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
3.13.5.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Marshy soil - Mechanical Means
3.13.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock ( blasting prohibited ) - Mechanical Means
12.8.D.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 - Using Concrete Mixer
12.8.F.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M30 - Using Concrete Mixer
13.5.G.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Using concrete Mixer - Height upto 5m
14.1.C.1:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure as per drawing and Technical Specification
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Approach Road
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
OD305714/2025-2026:Construction of granular sub-base/ base/ with usable material reclaimed from dismantled pavement by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub base - Mix in Place Method
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
13.5.B:Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M20 - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD305734/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD382466/2025-2026:DRY RUBBLE MASONRY using dry rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site (Derived from 8.7.2 MoRD)
WING WALL
3.13.5.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. <br> Marshy soil - Mechanical Means<br>
3.13.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work <br> Hard Rock ( blasting prohibited ) - Mechanical Means<br>
12.8.D.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M25 - Using Concrete Mixer <br>
12.8.F.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M30 - Using Concrete Mixer <br>
13.5.G.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Using concrete Mixer - Height upto 5m
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
OD382454/2025-2026:DOWEL BARS- Supplying and providing MS dowel bars of size 25mm dia of 2.0m long (1 metre in rock and 1 metre in concrete) including drilling holes of 30mm dia and filling the ga[p with cement grout (0.50kg/each) etc complete,
Febin G Kottukappalli (BID ID -2442457)
Geogy George K (BID ID -2442463)
Bidder Name
Geogy George K
Febin G Kottukappalli
Fahad Marakkar P P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1373992.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.12 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 0.06 MB
Tendernotice_5.pdf
PDF • 0.06 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 7.40 MB
BOQ_1373992.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .