Loading…
Loading…
Tender ID
Tender Value
₹4.3 L
EMD Value
₹4,300
Closing Date
10 Mar 2026, 6:00 pmClosed
Executive Engineer, P. H. Works Division, GWSSB, Mehsana
Providing, Supplying and Lowering Laying and jointing 110 mm dia P.V.C Rising Main from Tube well to Valavadi and Amaranagar Village Under Rejuvination Programme-2025 Ta:-Kadi Di:-Mehsana
279421
07
Open
Pipe / Fittings
Works
Mehsana
8 documents required · 6 mandatory · 2 optional
₹600
Executive Engineer, P. H. Works Division, GWSSB Mehsana
₹4,300
22 Feb 2026
22 Feb 2026
22 Feb 2026
10 Mar 2026
22 Feb 2026
Estimated Cost: Rs.
Executive Engineer
Gujarat Water Supply & Sewerage Board
P.H. Works Division, MEHSANA
Volume-III, PRICE BID Kadi RWSS
(1) Name of Work:- “Providing, Supplying & Lowering Laying & jointing 110 mm
dia P.V.C Rising Main from Tube well to Valavadi & Amaranagar Village
Under Rejuvination Programme-2025 Ta:-Kadi Di:-Mehsana”
(2) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(3) The rates and prices shall be submitted in the electronic formats given by
n-procure which is called Schedule-B. Rates and prices received in any
other formats will be rejected and the Bids will be disqualified.
(4) It will be entirely at the discretion of the Employer to accept or reject
the bidder’s proposal, without giving any reasons whatsoever and the
bidder shall not be permitted to withdraw his bid on this account.
to be free supplied from the by client.
(6) In Schedule-B the Bidder shall quote prices for the items on lump sum /
unit rate as called for against the BOQ item.
quoted in Schedule-B only will be considered for price evaluation & shall
form a part of the Contract Agreement.
comparison and evaluation.
(9) The Bidder shall quote his prices for Operation & Maintenance in
Schedule-C. Bidder shall give year wise break up of cost for 5 years O&M
in Schedule-C/1 to Schedule-C/5 separately for Schedule-C. The total
shall be inline to the price quoted in Schedule-C. The total shall be
carried forward to Schedule-B for comparison and evaluation.
(10) Wherever for a particular item the quantities have been specified
payment shall be on unit rate basis and unit variation in quantity will
be paid with pro rata basis.
(11) Each item is to be individually priced online and the amounts shall be
the Schedules of prices shall be left blank except where the item
description requires the item to be priced on "as applicable” basis. The
item shall not be priced if it is “not applicable” to the bidder’s design, in
which case the bidder shall add the words “NOT APPLICABLE”. The
wording in the item description is for subject matter guidance only;
clause references are indicative only and all other relevant clauses shall
also be referred to. The prices shall allow for all the works covered under
the bid and all liabilities and contractual obligations whether separately
specified or not. Items against which no prices are quoted shall not be
separately paid for and the bidder shall be deemed to have covered the
Volume-III, PRICE BID Kadi RWSS
cost of execution of such items (according to the requirements of the bid
document) in the prices quoted for other items.
executed for satisfactory working/safety of the system as specified, will
not be separately paid for by the Employer when executed and shall be
deemed to be already covered by other items and rates listed in the price
sheets No extra payment shall be given for any item which is required to
complete and perform the project.
fixed, during the pendency of the Contract. In case of any discrepancy
of the successful bidder shall be corrected accordingly. Only Price
Schedule–B after carried over and arithmetic corrections if any will be
considered for financial evaluation of the bid.
(14) Schedule ‘D gives the basis of interim payment for construction of civil
(15) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever
nature required for construction including temporary bunds, diverting
water, pumping, de-watering etc. for the proper execution of works. The
rates shall also be deemed to include any works and setting out that may
be required to be carried out for laying out of all the works involved.
(16) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents
and these documents are to be taken as mutually explanatory of one
(18) The bidder shall interpret the data furnished and carry out any
additional survey work, or investigation work required at his own cost.
(19) The prices quoted shall also include the cost of materials utilized for
(20) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable
access to work sites at his own cost. These accesses will be used by the
other contractors working for GWSSB.
only and the prices shall include all the equipments / materials /
accessories and services required as per the specifications. The bidder
(22) The amount to be quoted for O & M / year shall be as per Volume-II,
General Conditions of Contract, Clause No. 1, and Security Deposit.
(23) 1% of the value of work will be deducted from the Running bill against
labour cess which is non refundable.
(24) Third Party Inspection / CSC agency will be deployed by GWSSB and
charges of the same will be borne by GWSSB.
Volume-III, PRICE BID Kadi RWSS
(25) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(26) The rates quoted shall be exclusive of GST, but inclusive of all other
taxes, duties which shall not be paid extra. While GST will be paid for
admissible part of actual work done at the approved tender rates and
tender conditions of price variations. GST shall be paid as per prevailing
rates at the time of payment. The TDS shall be deducted at source as per
provision of IT rules and GWSSB Policy.
(27) The rates should be quoted exclusive of GST but inclusive of all other
taxes as per Volume-1 (B), General Conditions of Contract, Clause No.
(28) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance
of the contract. except price variation allowed for supply of
MS/DI/PVC/GI pipe as per Volume-II Clause No. 59, General Conditions of
(29) Payment shall be made for the components for which lump sump prices
are quoted, as per the schedule of payment. Total cost will be worked
out on the basis of work done of individual items and rates quoted
against those particular items only.
(30) Royalties: The contractor shall be liable to pay the royalty of the
quarried materials/ minerals used in the construction of works at the
rates specified in the Narmada Water Resources, Water Supply & Kalpsar
Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 (
Gujarati Version Copy enclosed) and shall be recovered from the running
bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the
work. The contractor shall furnish the statement showing the quantity of
quarried materials / minerals from whom purchased ( with full address of
the seller) and copies of the bills for purchase to the Executive Engineer
of the in charge of the work. The contractor shall also furnish such
additional information as regards royalty payment to the competent
(31) Agency shall have to take Insurance policy and intimate to GWSSB along
with the evidence within time limit. In case of non compliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped
from the responsibility.
(33) The contractor shall apply fair means of stock maintenance and shall
adopt accounting standard as may be prescribed under GST Act as
applicable in the state of Gujarat. For arriving at the difference in
procurement prices due to introduction of GST it will be open for the
Board to ask for original invoices, lorry receipt, weigh bridge slips,
Volume-III, PRICE BID Kadi RWSS
payment details and such other documents as may be required for the
(34) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly
certified by the competent tax authority. The final decision regarding the
quantum of claim amount to be recovered or reimbursed shall be of the
competent authority of the GWSSB and shall be binding on the
Signature of contractor Executive Engineer
Public Health Works Division
Volume-III, PRICE BID Kadi RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
(1) SUB: “Providing, Supplying & Lowering Laying & jointing 110 mm dia P.V.C
Rising Main from Tube well to Valavadi & Amaranagar Village Under
Rejuvination Programme-2025 Ta:-Kadi Di:-Mehsana” The bidder shall quote
his firm and fixed price for the entire work under this Contract, defined in
more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
execution of the above Contract, we the undersigned offer to design, Engineer,
procure, construct, complete, commission, operate and maintain the whole of
the said works for 2 years from the date of commissioning including defects
liability period as given in Conditions of Contract and in conformity with the
Annexure, Bidding Documents, including Addenda Nos.__________ (insert
numbers) for Lump sum fixed price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out
the inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and
approved by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take
any action including termination of Contract and impose at his absolute
discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within 15 months, inclusive of monsoons, from the
date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID Kadi RWSS
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms
and of value specified in the Clause 1 of Volume-II, “General Conditions of
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages
likely to be suffered by you in the event of the work not being completed by us
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID Kadi RWSS
(1) Name of Work :- “Providing, Supplying & Lowering Laying & jointing 110 mm dia
P.V.C Rising Main from Tube well to Valavadi & Amaranagar Village Under
Rejuvination Programme-2025 Ta:-Kadi Di:-Mehsana”
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are
Rate at which the material
Place of Delivery
Sr. will be charged to the
Particular Qty. (Transportation
given separately)
1. The contractor submitting the Tender shall see that the rate in Schedule- A are
filled in by the Engineer in Charge at the time of issue tender.
2. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement
in position shall be provided at his own cost.
3. All the materials required for the items other than labour in Schedule- A but
available with the dept. will be issued on request to the contractor. ( for use in
this contract only) at prevailing market rates or departmental issue rates
whichever is higher.
4. All the surplus materials supplied by the deptt. As mentioned in schedule-A
should be handed over to the Department by the contractor at the Govt. stores
5. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
6. Necessary cement will be purchased by the agency at their own cost from open
market as per specification.
7. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to
the submission of the Tender.
8. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Date: Signature of contractor
Volume-III, PRICE BID Kadi RWSS
Sub Unit Rate Total Amount
Sub Unit Rate Total Amount
SEQ Description Quantity
Providing and supplying in
standard length ISI mark rigid
unplasticised PVC pipes suitable for
potable water with ringfit joint
including cost of rings, as per IS
specification no. 4985/1988
including all local and central taxes,
1 transportation, freight charges,
octroi, inspection charges, loading,
unloading, conveyance to the
departmental stores and including
cost of jointing meterial etc.
complete. With Test pressure
Providing and supplying ISI mark G.
I. pipes with Couplings of following
class and diameter including all
taxes, insurance, transportation,
freight charges, octroi, inspection
charges, loading, unloading,
conveyance to departmental
stores, stacking etc. complete. (IS -
(a) 100 mm dia.
Providing and supplying ISI mark CI
D/F Sluice valves , butterfly valves
& Reflux valves of following class
and diameter including all taxes,
3 insurance, transportation, freight
charges, octroi, inspection charges,
loading, unloading, conveyance to
departmental stores, stacking etc.
Sluice Valve with ISI mark
PN-1 With hand wheel /cap
3.0 operated (PD type short body) 2.00 No. 3563.00
(a) 100 mm dia.
Providing And Supplying C.I. Air
Valves Of approved make & quality
4 of following class and diameter
including all taxes, insurance,
transportation, freight charges,
Volume-III, PRICE BID Kadi RWSS
octroi, inspection charges, loading,
unloading, conveyance to stacking
Air Valve with ISI mark
Air valves single (S1) type
Excavation for pipe line trenches
incl. all safety provision using site
rails and stacking excavated stuff
5 up to a lead of 90 mts. Cleaning the
site etc. complete for lifts and
strata as specified.In this including
dewatering in wet condition.
(A) Upto 1.50 mt depth
In all sorts of soil and soft murrum
Lowering, laying and fixing and
jointing PVC/UPVC/CPVC pipes
and specials of following class and
diameter including cost of
6 conveyance from stores to site of
works including cost of labour,
material, except cement solvent,
giving satisfactory hydraulic testing
as per IS code complete.
Lowering, laying and jointing G. I.
pipes with G. I. specials of following
diameters in proper position, grade
and alignment as directed by
Engineer-in-charge including
conveyance from stores to site of
work, labour, giving hydraulic
testing, etc. comple
(a) Medium Duty
(b) 100 mm dia.
Lowering, laying and jointing in
position following C. I. / D/F Reflux
valves, Butterfly valves, Sluice
valves and Air valves including cost
8 of all labour, jointing material,
including nut bolts and giving
satisfactory hydraulic testing, etc.
complete (Rate for all class of
Lowering, laying and jointing in
9 position following diameter
single/double acting air valve on
Volume-III, PRICE BID Kadi RWSS
raised and providing and fixing
same dia.of medium duty of
G.I.pipe 3.00 mtr high with
required coupling or flange at both
ends of pipe.The raised G.I.pipes
protected with RCC in CC 1:2:4
column of 0.30 mtr. Dia. size and
2.60 mtr.height with base footing
of 0.60 x 0.60 m x 0.60 mtr. At
bottom with required additional
excavation incl.bolts nuts , rubber
packing ,formwork for CC
(A) C.I. Air Valve
Refilling the pipeline trenches incl.
ramming, watering, consolidating
desposal of surplus stuff as
directed within a radius of 3 km.
Construction of valves chambers in
brick or bela stone masonary,
locally available in C. M.
1:6.Foundation concrete 150 mm
thick in C. C. 1:4:8of trap metal size
25 mm to 40 mm thick, inside
11 cement plaster in C. M. 1:3 and
cement pointing outside in C. M.
Frame and cover (excl. cost of CI-
MH Frame and cover) with 23 mm
thick brick masonary wall in
Size of chamber 0.60 m x 0.60 m
11.0 and 1.0 mt. Deep With precast slab 2.00 Nos 5380.00
in two parts 15 mm
"Providing CC M-100 for encasing
pipes using trap metal size 12mm
to 50mm incl. form work curing
consolidation etc. comp.
(using trap metal 20 mm nominal
Total Amount RS:-
Total Amount RS:-
Volume-III, PRICE BID Kadi RWSS
SUMMARY (SCHEDULE-B)
(1) Name of Work:- “Providing, Supplying & Lowering Laying & jointing 110 mm dia
P.V.C Rising Main from Tube well to Valavadi & Amaranagar Village Under
Rejuvination Programme-2025 Ta:-Kadi Di:-Mehsana”
Sr. No. Name of Work Amount Rs.
I / We am / are willing to carry out the work at______________________________% above / Below
percent (should be written in figure and words) of the estimated rates mentioned above amount of my /
our tender works out as under.
Estimated amount put to tender : Estimated amount put to Tender
Deduct________% above Add________% above
Signature of contractor Executive Engineer
Public Health Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1.rar
RAR
Circular 2.rar
RAR
Circular 3.rar
RAR
gst latest.pdf
DMO_2799_11-Mar-2024_662.pdf
DMO_2876_01-May-2025_273.pdf
NEW 1 VOL I Technical Bid.pdf
NEW 2 VOL II GCC.pdf
NEW 3 VOL III Price bid (1).pdf
NEW VOL IV SPECIFICATION.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .