Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -43.10% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹32,608.92 (11.3%)Admitted-Fee/PreQual/Technical/Finance | -36.69% | ₹3.2 L+₹32,608.92 (11.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.3 L+₹43,749.87 (15.1%)Admitted-Fee/PreQual/Technical/Finance | -34.50% | ₹3.3 L+₹43,749.87 (15.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.7 L+₹76,816.64 (26.5%)Admitted-Fee/PreQual/Technical/Finance | -28.00% | ₹3.7 L+₹76,816.64 (26.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.7 L+₹81,903.83 (28.3%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹3.7 L+₹81,903.83 (28.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
EMD Value
₹5,080
Closing Date
21 Sept 2026, 5:00 pmClosed
S.E.R.W.DIVISION,PADAMPUR
RURAL WORKS DIVISION, PADMAPUR,DIST.BARAGADA
Maintenance and repair of Sub-Treasury office building at Paikmal in the district of Baragada for the year 2026-27
2026_CERWI_141093_1
Online 05 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Padampur
2 documents required · 2 mandatory
₹4,000
₹5,080
Yes
22 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
12 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Finishing walls with weather coat ( two coats ) over a coat of cement primer to outer wall surface including cost and conveyance of all materials to site, and all labour charges complete as per direction of the Engineer-in-charge. | 730.8 | sqm | 177.65 | ₹1,29,826.62 |
| 2 | Providing & Fixing & Fixing M.S. Window Grills Including cost and conveyance of all materials to site, and all labour charges complete as per direction of the Engineer-in-charge. | 1,232.8 | kg | 75 | ₹92,460 |
| 3 | Painting two coats over wood and iron work with approved Enamel paint over a coat of primming, including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. | 16.63 | sqm | 264.64 | ₹4,400.96 |
| 4 | Wall Priming one coat with any approved primer on New Plastered surface of with any approved primer including cost of primer including all materials etc. Complete in all respect as directed by the EIC. | 441.11 | sqm | 78.96 | ₹34,830.05 |
| 5 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge | 57.2 | sqm | 76.38 | ₹4,368.94 |
| 6 | Providing fitting and fixing of Flush door made out of 32 mm thick block board including cost of all fittings and including cost, conveyance, royalty and taxes of all materials,hire charges of drilling machine and cost of all labour T&P required for the work complete in all respect as per direciton of the Engineer-in-charge. | 9.2 | sqm | 8,499.21 | ₹78,192.73 |
| 7 | Supplying, fitting, fixing up window (sliding type) made up aluminium section 151-154, 151-155,aswindow frame Section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as pannel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes of labour, T&P etc. complete asper direction of E.I.C | 7.28 | sqm | 7,127.73 | ₹51,889.87 |
| 8 | Providing fitting fixing of false ceiling with Aluminium anodised T section No.3215 with 2'0" center to center, L section No.1705 on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2'0"x2'0" with 12mm thick Prelaminated Particle Board suspended from ceiling including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge | 68.16 | sqm | 1,654.2 | ₹1,12,750.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.48 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_609740.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .