Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | -4.55% | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 Cr+₹9.3 L (1.84%)Admitted-Finance | -2.79% | ₹5.2 Cr+₹9.3 L (1.84%) | L2 | Admitted-Finance |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
15 Apr 2025, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
RJ-23-02/69-Imp.Work/2025-26
2025_CEPWD_454675_1
ACE PWD ZONE KOTA NITNO-25/2024-25
Open Tender
Civil Works
Percentage
240 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
5000 EE PWD DIV. SULTANPUR
₹10.6 L
Yes
ACE PWD ZONE KOTA
25 Apr 2025
26 Mar 2025
17 Apr 2025
26 Mar 2025
15 Apr 2025
26 Mar 2025
4 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | |||||
| 1.01 | lMd fuekZ.k dk;Z iksykbZdyk ls xzke xksnY;kgsMh rd | 2.6 | E | - | - |
| 1.02 | lMd fuekZ.k dk;Z iksykbZiqjk ls nsoiqjk jksM | 2.16 | E | - | - |
| 1.03 | dqy | 4.76 | Hectare | - | - |
| 2Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | |||||
| 2.01 | lMd fuekZ.k dk;Z iksykbZdyk ls xzke xksnY;kgsMh rd | 7,728 | E | - | - |
| 2.02 | lMd fuekZ.k dk;Z iksykbZiqjk ls nsoiqjk jksM | 5,712 | E | - | - |
| 2.03 | dqy | 13,440 | Cum | - | - |
| 3Construction of embankment with approved Materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 tonne to meet requirement of Tale 300-2 as per MoRTH specification : Clause No. 305 | |||||
| 3.01 | lMd fuekZ.k dk;Z iksykbZdyk ls xzke xksnY;kgsMh rd | 19,218.54 | E | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 0.29 MB
Tenderdocument_2.pdf
Tender Documents • 3.25 MB
BOQ.xls
BOQ • 0.44 MB
Tenderdocument_3.pdf
Tender Documents • 0.14 MB
Tenderdocument.rar
Tender Documents • 10.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .