| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹16,150 (0.10%)Admitted-Finance | ₹1.6 Cr+₹16,150 (0.10%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹58,137.01 (0.37%)Admitted-Finance | ₹1.6 Cr+₹58,137.01 (0.37%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABUDUSALAM KK L1 | AMEER ALI N. L2 | MUNEER P P L3 |
|---|---|---|---|---|---|---|
| 1.00Retaining wall Construction for the Stream in Kottakkal municipality | ||||||
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 361.6 | cum | 215.37 ₹77,878.01 Lowest | 215.37 ₹77,878.01 Lowest | 215.37 ₹77,878.01 Lowest |
| 1.02 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 440.7 | cum | 298.8 ₹1,31,681.16 Lowest | 298.8 ₹1,31,681.16 Lowest | 298.8 ₹1,31,681.16 Lowest |
| 1.03 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 48 | cum | 902.53 ₹43,322.34 Lowest | 902.53 ₹43,322.34 Lowest | 902.53 ₹43,322.34 Lowest |
| 1.04 | 7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 1,347.53 | cum | 8,944.12 ₹1,20,52,425.3 Lowest | 8,944.12 ₹1,20,52,425.3 Lowest | 8,944.12 ₹1,20,52,425.3 Lowest |
| 1.05 | 5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1,130 | metre | 205.21 ₹2,31,887.3 Lowest | 205.21 ₹2,31,887.3 Lowest | 205.21 ₹2,31,887.3 Lowest |
| 1.06 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,230 | kilogram | 98.92 ₹3,19,511.6 Lowest | 103.92 ₹3,35,661.6 | 115 ₹3,71,450 |
| 1.07 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 34.9 | cum | 9,142.09 ₹3,19,058.94 Lowest | 9,142.09 ₹3,19,058.94 Lowest | 9,142.09 ₹3,19,058.94 Lowest |
| 1.08 | 60.1.1 : RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 69 | metre | 1,534.54 ₹1,05,883.26 Lowest | 1,534.54 ₹1,05,883.26 Lowest | 1,534.54 ₹1,05,883.26 Lowest |
| 1.09 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 90 | hour | 381.97 ₹34,377.3 Lowest | 381.97 ₹34,377.3 Lowest | 381.97 ₹34,377.3 Lowest |
Tender Value
₹1.6 Cr
Closing Date
19 Mar 2025, 5:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Rennovation works
2025_FITL_748977_1
FIT/CP-93/2024-25
Open Tender
Civil Works - Others
Item Rate
365 days
KOTTAKKAL MUNICIPALITY
Refer Tender Document
8 documents required · 8 mandatory
₹5,900
Exempted
Forest Industries Travancore Limited Thaikkattukar
22 Mar 2025
11 Mar 2025
20 Mar 2025
11 Mar 2025
19 Mar 2025
11 Mar 2025
11 Mar 2025 - 14 Mar 2025
14 Mar 2025
Amount
Retaining wall Construction for the Stream in Kottakkal municipality
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
60.1.1 : RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
od218858/2024_2025 : DRY RUBBLE MASONRY _ Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement 6 coarse sand 12 graded stone aggregate stone aggregate 20 mm nominal size ) including cost of through stone and bond stone
od218864/2024_2025 : Engaging man coolie for clearing the existing drain by removing silt
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
AMEER ALI N. (BID ID -2162436)
MUNEER P P (BID ID -2162446)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1211614.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .