Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -37.10% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 LAdmitted-Finance | -32.85% | ₹1.3 L | L2 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
20 Feb 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer
As BOQ
2026_RDPR_303145_16
e-NIT No- 148REW Samba of 2026 Dated-13-02-2026
Open Tender
Civil Works
30 days
Ghagwal
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹3,920
24 Feb 2026
14 Feb 2026
21 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with size 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.
Supplying and filling of stone
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
providing and laying of PVC pipe 75mm for weep holes
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Carriage of mooram upto a lead of 100mtr by h/l
Carriage of sand upto a lead of 7Km by MT 100 mtr by H/L
Carriage of agg upto a lead of 7Km by MT 100 mtr by H/L
add cost of sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.37 MB
BOQ_983887.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid