| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.2 LAccepted-Finance | ₹62.2 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹64.3 L+₹2.1 L (3.35%)Accepted-Finance KARKERI KUCHAMAN CITY NAGAUR TEHSIL KUCHAMAN RAJASTHAN 341508 UDYAM RJ 25 0036546 | NAGAUR | RAJASTHAN | 341508 | ₹64.3 L+₹2.1 L (3.35%) | L2 | Accepted-Finance Responsive |
Tender Value
₹70.9 L
EMD Value
₹1.4 L
Closing Date
12 Jan 2026, 6:00 pmClosed
Jai singh XEn Lohawat
A-42 Riico Residential Colony, Phalodi 342301
Construction of various Watershed development structures under PMKSY 2.0 in Block Dechu
2026_WDSC_524624_1
PMKSY-2.0/Loh/02/03
Open Tender
Civil Works
Percentage
near dechu block
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
8658-00-102-16-01
₹1.4 L
Yes
A-42 Riico Residential Colony, Phalodi 342301
14 Aug 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
6 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: SUPERINTENDING ENGINEER AND PROJECT MANAGER WATERSHED CELL CUM DATA CENTER, PHALODI
Name of Work: Construction of Tanka (30kL) with Catchment, RTWHS(30kl) and Nadi in Block Dechu, Phalodi
Sr. No. Construction of Tanka (30kL) with Catchment in Block Dechu, Phalodi Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT With Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1.01 जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य नरम मिट्टी (in Soft Soil) GKN BSR Item 196 A BI01010001010000000000000515BI0100001112 0.799 Cum Excess(+) Full Conversion INR
1.02 जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) GKN BSR Item 196 B Cum Excess(+) Full Conversion INR INR Sixteen Thousand Six Hundred & Forty One and Paise Ten Only
1.03 Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum WRD BSR Chapter 5 Part A Item no 1 C BI01010001010000000000000515BI0100001114 Cum Excess(+) Full Conversion INR INR One Lakh Sixteen Thousand Four Hundred & Sixty Two and Paise Eighty Only
1.04 lhesUV dkaØhV uhao ;k Q'kZ esa 40 fe- eh- ukeh; eki dh iRFkj fxÍh @ bZV fxÍh] lhesUV & jsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA iRFkj dh fxêh ds lkFk पत्थर की गिट्टी (crusher broken) के साथ 40 एमएम क्रेशर ब्रोकन पत्थर की गिटटी के स्थान पर हाथ से टूटी हुई रोडी के उपयोग करने पर वही मात्रा देय होगी परन्तु गिटटी की दर में 30 प्रतिशत की कटौती की जावेगी। GKN BSR Item no 10(v) BI01010001010000000000000515BI0100001115 Cum Excess(+) Full Conversion INR INR Five Lakh Fifty Nine Thousand Six Hundred & Fifty One and Paise Fifty Eight Only
1.05 सेन्टरिंग'शटरिंग (तख्ता एवम ढुलाबंदी) का आर.सी.सी. छत, स्लेब, छज्जे, लिन्टल आदि डालने के लिए लगाना 4.5 मीटर ऊचाई तक के लिए तथा हटाना आदि विशेष विवरण के अनुसार। Steel Shuttering GKN BSR Item 93© BI01010001010000000000000515BI0100001116 Sqm 346.08 Excess(+) Full Conversion INR INR Ten Lakh Twenty Five Thousand &Seventy Eight and Paise Fifty Eight Only
1.06 सीमेंट कंक्रीट 1:2:4/1:1.5:3 मिश्रण की प्रवलित सीमेंट कंक्रीट में डालना तथा आपूर्ति करना, छत की स्लैब, छज्जे, बीम, लिंटल आदि में दबाना, तराई करना तथा सतह को 1:3 सीमेंट मसाले से समतल करना आदि समेत पाडबन्दी सहित परन्तु स्टील तथा शटरिंग की कीमत अलग से। अनुपात 1:1.5:3 GKN BSR Item 13 (B) BI01010001010000000000000515BI0100001117 Cum 5553.39 Excess(+) Full Conversion INR INR Fifteen Lakh Forty Eight Thousand One Hundred & Eighteen and Paise Fifty Three Only
1.07 आर.सी.सी. काम के लिए लोहे को काटना, मोड़ना तथा स्थान पर लगाना तथा बांधने का कार्य मय आपूर्ति के । GKN BSR Item 61 BI01010001010000000000000515BI0100001120 Kg. 92.8 Excess(+) Full Conversion INR INR Nine Lakh Eighty Three Thousand Eight Hundred & Sixty One and Paise Eighty Nine Only
1.08 सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । GKN BSR Item 16 BI01010001010000000000000515BI0100001121 Cum Excess(+) Full Conversion INR INR Seventeen Thousand Nine Hundred & Fifty Three and Paise Sixty Six Only
1.09 सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 12 मि.मी. मोटाई GKN BSR Item 76(स) BI01010001010000000000000515BI0100001122 Sqm Excess(+) Full Conversion INR INR One Lakh Forty Seven Thousand Nine Hundred & Forty Six and Paise Ninety Eight Only
1.1 सीमेंट प्लास्टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। 12 मिमी GKN BSR Item 77(स) Sqm Excess(+) Full Conversion INR INR Twenty Eight Thousand Five Hundred & Fifty and Paise Ninety Two Only
1.11 रंग सफेदी का कार्य 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर। नये कार्य पर। GKN BSR Item 81(अ) Sqm Excess(+) Full Conversion INR INR Twenty Nine Thousand Three Hundred & Fifty Six and Paise Thirty Eight Only
1.12 कोनिया लोहा (एंगल आईरन) के 40X40X3 मिमी की बाहरी चोखट में 22 गेज की सादा जी.आई. चद्दर के 2 पल्ले वाले दरवाजे 25X25X3 मिमी के कोनिया लोहे के चौखट (फ्रेम) में आपूर्ति करना तथा लगाना मय अर्गल स्लाईडिंग वोल्ट, चिटकनी तथा पकड़ पट्टियां आदि फिटिंग सहित जी.आई.सादा चद्दर विश्लेषण 1X2 वर्गमीटर दरवाजे के लिए । जी.आई.सादा चद्दर विश्लेषण 1X2 वर्गमीटर दरवाजे के लिए । GKN BSR Item 85(अ) Sqm Excess(+) Full Conversion INR
1.13 ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। GKN BSR Item 63 Kg Excess(+) Full Conversion INR INR Fourteen Thousand Nine Hundred & Sixty Eight and Paise Twenty Only
1.14 110 मिमी व्यास के पी.वी.सी. पाईप का डालना मय अन्य आवश्यक सामग्री साहित 110mm dia GKN BSR Item 181 Mtr. Excess(+) Full Conversion INR INR Sixty One Thousand Six Hundred & Eighty Only
1.15 P&F rigid PVC pipe fittings (IS: 4985 mark) of approved quality /make including joining the pipe with solvent cement rubber ring and lubricant: For pipe line fittingsPlain Tee 3.17.3 (ii) Nos Excess(+) Full Conversion INR INR Two Thousand Six Hundred & Eighteen Only
1.16 P&F rigid PVC pipe fittings (IS: 4985 mark) of approved quality /make including joining the pipe with solvent cement rubber ring and lubricant: For pipe line fittingsBend 87.5 3.17.9 (ii) Nos Excess(+) Full Conversion INR INR Thirteen Thousand Five Hundred & Twenty Four Only
1.17 P&F rigid PVC pipe fittings (IS: 4985 mark) of approved quality /make including joining the pipe with solvent cement rubber ring and lubricant: For pipe line fittingsPipe clip 3.17.15 Nos Excess(+) Full Conversion INR INR Six Thousand Five Hundred & Fifty Two Only
1.18 Construction of chamber in all type of soil with 300 mm thick masonry in CM 1:6 m,10 cm thick C.C. 1:5:10 in foundation, 20mm thick insider plaster in Cm 1:6, finished with floating neat cement, 50mm thick M-15 grade C.C. flooring , earthwork etc. complete as per design including disposal of surplus earth within a lead of 50 mtr. Inner size 450 x 450mm depth upto 0.5 M Cement cover with frame (Deduct for using brick work 230 mm thick in place of 300 mm thick stone masonry) PWD BSR Chepter S-3 Item No 3.21.2 Nos Excess(+) Full Conversion INR INR Fifty One Thousand &Seventy Two Only
1.19 Installation of Indian mark II hand pump set, complete on existing plate form. PWD BSR Chepter S-4 Item No 4.13 Nos Excess(+) Full Conversion INR INR Twenty Four Thousand Two Hundred & Thirty Two Only
1.2 50 eh- eh- eksVkbZ esa lhesaV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZaV dh 12 - eh- ukHkh; fxV`Vh ds lkFk feykdj Mkyuk] dwVuk] nckuk rFkk rjkbZ vkfn lesr A iRFkj dh fxV`Vh GKN BSR Item 14(v) Sqm Excess(+) Full Conversion INR INR Four Lakh Fifty Three Thousand Seven Hundred & Seventy and Paise Fifty Seven Only
1.21 Dag belling work up to 5-7.5 cm depth GKN 2025-26 ItemNo. 6 b 0.999 m Excess(+) Full Conversion INR INR Two Hundred & Ninety Two and Paise Seventy Five Only
1.22 जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। GKN 2025-26 ItemNo. 192 0.000 Sqm Excess(+) Full Conversion INR INR Five Hundred & Eighteen and Paise Forty Only
1.23 Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect मशीनरी कार्य नरम मिट्टी (in Soft Soil) WRD 2023 , Chapter-V, ItemNo. 1 a 0.000 Cum Excess(+) Full Conversion INR INR Twenty Three Thousand One Hundred & Fifty Eight and Paise Twenty Four Only
1.24 Add extra for disposal of excavated material above initial lift of 1.5m (deduct 10% rate), WRD 2022 Chapter V Item No. 11, Page No. 14 WRD 2023 , Chapter-V, ItemNo. 11 0.000 Cum Excess(+) Full Conversion INR INR Four Hundred & Twenty Three and Paise Ninety Eight Only
1.25 सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थ र की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। GKN 2025-26 ITEM NO 170(A) 0.000 Cum 3658.48 Excess(+) Full Conversion INR INR One Lakh Ninety Eight Thousand Three Hundred & Ninety Two and Paise Five Only
1.26 एनीकट हेतु पत्थटर की चिनाई सीमेंट-बजरी मसाले में। 1 : 6 में GKN 2025-26 ITEM NO 166(A) 0.800 Cum Excess(+) Full Conversion INR INR Thirteen Lakh Thirty Three Thousand Nine Hundred & Ninety and Paise Twenty Eight Only
1.27 सीमेंट कंक्रीट 1:2:4 मिश्रण की प्रवलित सीमेंट कंक्रीट में डालना तथा आपूर्ति करना, छत की स्लैआब, छज्जेज, बीम, लिंटल आदि में दबाना, तराई करना तथा सतह को 1:3 सीमेंट मसाले से समतल करना आदि समेत पाडबन्दी सहित परन्तुद स्टी ल तथा शटरिंग की कीमत अलग से। GKN 2025-26 ITEM NO 13 (A) 0.999 Cum Excess(+) Full Conversion INR INR Seventy Eight Thousand Six Hundred & Fifty One and Paise Seventy Seven Only
1.28 सीमेन्टत प्लयस्ट र दीवार पर 1:4 अनुपात में सीमेन्टम - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित , 25 मि.मी. मोटाई GKN 2025-26 ITEM NO 76 (A) 0.000 Sqm Excess(+) Full Conversion INR INR One Lakh Seven Hundred & Sixty Four and Paise Eighty Only
1.29 15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थेर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ । GKN 2025-26 ITEM NO 167 0.000 Cum Excess(+) Full Conversion INR INR Thirty Two Thousand Three Hundred & Ten and Paise Twenty Two Only
1.3 मिट्टी को 8 से 10 टन रोलर से 90 प्रतिशत प्रोक्टकर डेनसिटी तक दबाना। GKN 2025-26 Item No. 144 Cum Excess(+) Full Conversion INR INR Sixty Five Thousand Five Hundred & Seven and Paise Seventy Five Only
1.31 Watering of earth including cost of carriage of water when source of water is, up to 1 Km WRD 2023, Chapter V, Item no. 28 (A) Cum Excess(+) Full Conversion INR INR Thirty Three Thousand Two Hundred & Forty One and Paise Ninety Five Only
1.32 ताक हेतु मशीन से सिरे काटे हुये सेंड स्टोन की 25-40 एमएम मोटाई में आपूर्ति, सीमेन्ट मसाला 1:3 में लगाना सहित पूर्ण कार्य कातला पत्थर GKN 2025-26 Item No. 39 (a) sqm Excess(+) Full Conversion INR INR Two Hundred & Forty Seven and Paise Forty Nine Only
1.33 इनामिल पेन्टब का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। नये कार्य पर। GKN 2025-26 Item No. 82 (a) sqm Excess(+) Full Conversion INR INR Sixty Nine and Paise Ten Only
Total in Figures INR Seventy Lakh Eighty Eight Thousand Seven Hundred & Sixty Eight and Paise Thirty Two Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.00 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 0.69 MB
BOQ_936135.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .