Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
30 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Dy.Minicipal Commissioner - West Zone
M.P Shree,MLAShree,MuncipalCounsilorShee,CharimenShree,Mayer Shree And Swarnimbudget,CapitalBudget,Revney Budget And Other Budget in Providing And Fixing making board of direction &demarcation,Repair work of board And other RequriedAt Nava Vadaj Ward at West Zone.(ARC)
295534
9/25-26 (T.N.17)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹25,000
8 Apr 2026
8 Apr 2026
8 Apr 2026
30 Apr 2026
8 Apr 2026
1. Name of Work : M.P
Shree,MLAShree,MuncipalCounsilorShee,CharimenShree,M
ayer Shree And Swarnimbudget,CapitalBudget,Revney
Budget And Other Budget in Providing And Fixing making
board of direction &demarcation,Repair work of board And
other RequriedAt Nava Vadaj Ward at West Zone.(ARC)
2. Tender Estimated Cost : Rs:-25,00,000.00
: 1% of the Tender Cost in the form of Rs. 25000.00 (D.D. / Pay
3. Earnest Money
- Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draft of Rs.
5 S.D. : 5 % of tender amount
6. Time-Limit : 12 months
7. Validity Period : 120 Days
8. (i) Last Date of Submission of :
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by Registered Post A.D,
or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to : a) Name of work, Tender Notice No. & Tender No.
be made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in :
The Price bid shall be submitted online only.
Schedule of Quantities and
Rates It shall not be submitted Physically.
9. Date of Opening : Dt..01-05-2026 15:00 PM
10 Place of Submission & : Submission of EMD. Tender fee and other Documents during office
Opening of Tender hours: On Dt.01-05-2026 &12:00pm West Zone, 2nd Floor, A.M.
Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs) but not more then 10% of bill
12 Defect Liability : As per ‘E-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-
mail shall be considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation as above by
Time permitted to start parts
13 contractor the contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs). Three
times failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
ybœtJtœBgwrlrmvjftuvtuohuNlbtkÍtuljytuVem/v.J.yu./«tusufxrJCtdîththtuz/rcÕzekd/jtRx/c{es
Ft<tytuîthtcnthvtzJtbtkytJujtxuLzhsulwkmcbeNl<t.01-07-2017 vAefhJtlwk&tg
Au,<uJt<btbxuLzhtubtk<&t nJuvAeCthvtzJtbtkytJlthWvhtuf<rJCtd/Ft<tltk<btbxuLzhtubtk
14 ltKtk Ft<w vhuvºt lk-31 <t:-07-07-
(bxehegj+juchmÃjtgmt&u)
GSTltkltuxeVefuNlbwscGSTsgtkjtdwvz<tuntugðgtkmœhnwkftbltkBidderyuGSTltuxeVefuNl
bwscleyuÃjefucejexeægtlbtkhtFeluhuxlwkcezekdfhJtlwkhnuNu.
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 1-
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-WEST ZONE
Tendar ABSTRACT SHEET
Name OF Work:- M.P Shree,MLAShree,MuncipalCounsilorShee,CharimenShree,Mayer Shree And
Swarnimbudget,CapitalBudget,Revney Budget And Other Budget in Providing And Fixing making board of
direction &demarcation,Repair work of board And other Requried At Nava Vadaj Ward at West
Sr. No. Qty Description Rate Unit Amount
Providing and fixing MS grill gate
elevation element of decorative pattern
with MS channel flat medium grade Ms pipe square or round
1 6798.71 bars with heanded bolts nuts or by screw incl applying on coat 75.00 KG
zinc primer and two coats of oil paint comp.
Letterin g and lettering charges and printing
2 100.00 Muni.corporation symbol with help or skilled artist including 2000.00 No
Prismatic grad reflective sheeting with
super high performance durable micro
prismatic material confirming to type XI
as per ASTM-D 4956-09 & cutting pesting letter according
to IRC Standard in Singal language with micro prismatic
confirming to type XI
Excavation of pit of manually necessary labour of size .6*.6*.6
m for as per above MS Structure foundation of pole for any
size. The grade of concrete should be M-20 the item rate
4 100.00 include carting, filling, with available earth and should be 1000.00 No
proper be level up to ngl,as directed by Engineer in charge.
Painting and lettering the board on both
side of MS sheet with a thickness of
mm gauge and letters by oil paint
confirming with 2 coats of red oxide and
5 100.00 oil paint Item includes necessary staging 3500.00 SMT
carting and transportation or as directed
by engineer in charge(app.rate)
Repairing or Removing of Existing
Boards and Re-fixing the same with the
help of required machinery. The Item
Rate Includes Repairing, Welding,
Painting etc… Comp Work As Directed
6 50.00 By Engineer In Charge. The Rate 3128.00 JOB
Includes necessary Staging with all tools
and tackles with Required Manpower at
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 2-
Manufacturing and supplying barricades as per drgs consisting
of (1) Outer frame
25 x 25 x 1.6 mm M.S. rectangular section (1.3 mtr wide and
1.1 mtr height)
(2) Internal @ no extra panels consists of
20 x 20 x 1.6 mm M.S. Hollow rectangular section with M.S.
plates 2 mm thick ( size 1.3 mtr x 1.1 mr) (3) 2 no 0.3 meter dia
7 19.00 1.6 mm thick round M.S. plate for AMC logo. (4) 4 no trolly 4100.00 No
wheels (5)Require M.S. flate of 20 x 5 mm for fixing M.S.
Rectangular sheet and 5 mm Square bar for M.S. round sheet.
(6) fixing the necessary radium sheet with radium letters as per
instruction and AMC logo on both side the M.S. sheet
Supplying, labour for break down repairing work for activities
like excavation, disliting, removing debris from trench back
8 filling etc. comp. as directed by Eng.in charge.(Based on
Building SOR 2015-16)
a 9.00 Mazdoor at day /Night 328.00 No
b 5.00 Makadam/ supervision at day / Night 348.00 No
Hiring of tractor with trolley considering 8 Hrs. as working day
9 10.00 hours incl.Driver (GWSSB SOR 2021-22) 2110.50 Day
Contractor'sSign Addl.C.E.
MobileNo:- (westzone)
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 3-
AHMEDABADMUNICIPALCORPORATIONENGIN
EERINGDEPARTMENT
STANDAREDDETAILEDTECHNICALSPECIFICATIONOFITEMS
NameofWork:-M.P Shree,MLAShree,MuncipalCounsilorShee,CharimenShree,Mayer Shree
And Swarnimbudget,CapitalBudget,Revney Budget And Other Budget in Providing And
Fixing making board of direction &demarcation,Repair work of board And other RequriedAt
Nava Vadaj Ward at West Zone.(ARC)
WORKSSHALLDONEASPERREQUIREMENT,DIRECTIONOFENGG.INCHARGEWITHRELATEDTOSITEANDCONFIR
MATIONTOMORTHHANDBOOKANDRELEVANTISCODE.MATERIALSTESTINGREPORTSSHALLBEPRODUCEASPE
RRELEVANTInCODE
ITEM No.1 Providing & Fixing M.S.grill,gate,elevation element of Decorative pattern
withM.S.Channel,flat,mediumgradem.s.pipe,squareorroundbarswithroundheande
d bolts,nuts,or by screw.incl.applying one coat zinc primer and two
coatofoilpaintetc.comp.
TherateshallbeforaunitofoneKg.
ITEMNo.2Painting&letteringchargesandPrintingMuni.corporationSymbolwithhelpofskilledartistincl
udingcolourcost(M.R)AsPerDirectiongivenbyEngg.Inchrage
TherateshallbeforaunitofNo.
ITEM No.3 Painting &Letteringthe board on both sides of m.s. sheet with a thickness of 16mmguage
and letters by oil paint confirming with 2 coats of red oxide and oil paint,
Itemincludesnecessarystaging,cartingandtransporationorasdirectedbyengineerincharge
TherateshallbeforaunitofSmt.Basis
ITEM No.4 Excavation of pit of manually necessary labour of size 0.6*0.6*.6 mfor above
mentionstructurefoundationofpoleforanysize.ThegradeofconcreteshouldbeM-
20theitemrateincl.includecartingfilling withavailable earth
andshouldbrproperbeleveluptongl,asdirectedbyEngineerincharge
1.0Materials:WatershallconformtoM-1.CementshallconformtoM-3.Sandshallconform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal sizeshallconformtoM-12.
2.1 The concrete mix is notrequired to be designed bypreliminary tests. The proportion
oftheconcrete mix shallbe 1:2:4(1 cement: 2coarse sand: 4graded stoneaggregate 10mm
nominal size) by volume. Concrete work shall have exposed concrete surface or
asspecifiedintheitem.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S
Correspondapproximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary
concrete byvolumerespectively.
2.3 Theingredientsrequiredforordinaryconcretecontainingonebegofcementof50Kg.byweight(0
.0342Cu.M)fordifferentproportionsofmixshallbeasunder:
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 4-
Gradeof Totalquantityofdryaggr Proportionoffineaggreg Qty of
egatebyvolumeper50Kg atetocoarseaggregate waterper50K
concrete s,ofcementto be taken gs.ofcement
as the sumof individual maximum
offineandcoarseaggrega
M-100(1:3:6) 300Liters Generally1:2forfineaggre
gatebyvolumebut
subject to and upperlimit
of 1:1/2 and lowerlimit
2.4 The water cement ratios shall not more than those specified in the above table.
Thecement content of the mix specified in the Table shall be increased if
thequantityofwaterinamixhastobeincreasedtoovercomethedifficultiesofplacementandcom
pactionsothatthewatercementratiospecifiedintheTable isnotexceeded.
2.5 Workabilityoftheconcreteshallbecontrolledbymaintainingawatercementratiothatis bound
to give a concrete mix which is just sufficiently wet to be placed and
compactedwithoutdifficultywith the meansavailable.
2.6 themaximumsize of coarseaggregateshallbeaslargeaspossiblewithin the
limitsspecifiedbutinnocasegreaterthansurroundallreinforcementthoroughlyandtofillthecor
ners oftheform.
2.7 Forreinforced
concretework,coarseaggregateshavinganominalsizeof20mmaregenerallyconsidered
2.8 Forheavilyreinforcedconcretemembersasinthecaseofribsofmainbeamsthenominal
maximumsizeofcoarseaggregate should usually berestricted to 5 mm
lessthantheminimumcleardistancebetweenthemainbars,or5mmlessthantheminimumcove
rtothereinforcementwhicheverissmaller.
2.9 Where the reinforcement iswidely spaced as in solid slabs, limitations of size of
theaggregate may not be important and the nominal maximum size may sometimes be
asgreaterthan the minimumcover.
2.10 Admixture may used in concrete onlywith approval ofEngineer-in-chargebased
upontheevidencethatwiththepassageoftime,neitherthecompressivestrengthofconcrete is
reduced norareotherrequisitequalitiesofconcreteandsteel impaired
bytheuseofsuchadmixtures.
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 5-
3.0 Workmanship:
3.1 Proportioning:Proportioningshallbedoneby volume, except cementwhich shall
bemeasured in terms of bags of 50 Kg. weight. The volume of one such bag being taken
as0.0342Cu.Meter.Boxes of suitablesizesshallbeusedfor measuring sand
aggregate.Thesizeoftheboxes(internal)shallbe 35cms x 25 cms.and40cms
deep.Whitemeasuring the aggregate and sand, the box shall be filled without shaking
orhammering.Theproportioningofsandshallbeonthebasisofitsdryvolumeandincaseofdamps
and,allowancesforbulkageshallbe made.
3.2.1 Forallwork,concreteshallbemixedin
amechanicalmixerwhichalongwithotheraccessoriesshallbekeptinfirstclassworkingcondition
andsomaintainedthroughoutthe construction. Measured quantity of aggregate, sand,
cement required for each batchshall be poured into the drum of the mechanical mixer
while it is continuously running.After about half a minute of dry mixing, measured
quantity of water required for eachbatch of concrete mix shallbeaddedgraduallyand
mixing continued foranotheroneand half a minute. Mixing shall be continued till materials
are uniformly distributed anduniform color of the entire mass is obtained and each
individual particle of the
coarseaggregateshowscompletecoatingofmortarcontainingitsproportionateamountofcem
ent. In no case shall the mixing be done for less than 2 minutes after all
ingredientshavebeenputintothemixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for
certainother reasons, it shall be done on the smooth watertight platform large enough to
allowefficient turning over the ingredients of concrete before and after adding water.
Mixingplatformshallbeso arranged thatno foreign materialgets mixed with concrete
nordoes the mixing water flow out. Cement in required number of bags shall be placed in
auniform layer on top of the measured quantity of fine and coarse aggregate, which
shallalsobespread in alayer of uniformthickness on
themixingplatform.Drycoarseandfineaggregateandcementshallthenbemixedthoroughlybyt
urningovertogetamixturetouniformcolor.Specifiedquantityofwatershallthenbeaddedgradu
allythrougharose-canandthemassturnedovertillamixofrequiredconsistencyisobtained. In
hand mixing quantity of cement shall be increased by 10 percent above thatspecified.
3.2.3 Mixerswhichhavebeenoutofuseformorethan30minutesshallbethoroughlycleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-
chargethefirstbatchofconcretefromthemixtureshallcontainonlytwothirdsofnormal
quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned
beforechangingfromonetypeofcementtoanother.
3.3 Consistency:
3.3.1 Thedegreeofconsistencywhichshalldependuponthenatureoftheworkandmethodsofvibratio
nofconcrete,shallbedeterminedbyregularslumptestsinaccordancewith
I.S. 1199-1959. The slump of 10mm to 25mm. shall be adopted when vibrators are
usedand 80mmwhen vibratorsarenotused.
3.4 Inspection:
3.4.1 Contractorshall give theEngineer-in-charge duenoticebeforeplacinganyconcreteintheforms
to permit him to inspect andaccept the false work andforms as to
theirstrength,alignment,andgeneralfitnessbutsuchinspectionshallnotrelievethecontractoro
fhisresponsibilityforthesafetyofmen,machinery,materialsandforresultsobtained.Immediat
elybeforeconcreting,allformsshallbethoroughlycleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-
charge.Onecarpenterwithhelpershallinvariablybekeptpresentthroughouttheperiod
ofconcreting.Movementoflabourandotherpersonsshallbetotallyprohibitedforreinforcemen
tlaidinposition.foraccesstodifferentparts,suitablemobileplatforms
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 6-
shall be provided so that steel reinforcement in position is not disturbed. For
ensuringpropercover,mortarblocksofsuitablesizeshallbeprovidedsothatsteelreinforcement
inpositionisnotdisturbed.Forensuringpropercover,mortarblocksofsuitablesizeshall be cast
and tied to the reinforcement. Timber kapachi or metal pieces shall not beusedforthis
3.5 Transportingandlaying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall
beso transported and placed that no contemination, segregation or loss of its
constituentmaterialtakesplace.
All form wok shall be cleaned and made free from standing water, dust, show or ice
immediatelybeforeplacingofconcrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-
chargehas been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints.
Freshconcreteshallnotbe placed against concrete which has been in position
formorethan30 minutes unless a proper construction joint is formed. Concrete shall
compacted in itsfinal position within 30 minutes of its discharge from the mixer. Except
where otherwiseagreed to by the Engineer-in-charge concrete shall be deposited n
horizontal layers to acompacted depth of not more than 0.45 meter when internal
vibrators are used and notexceeding 0.30 meterinallothercases.
3.5.3 Unless otherwiseagreed to bytheEngineer-in-charge, concrete shallnot be
droppedintoplacefroma height exceeding
meters.Whentrunkingorchutesareusedtheyshallbe kept close and used in such a wayas to
avoid segregation. When concreting hasto be resumed on a surface which has hardened, it
shall be roughened, swept clean,thoroughly wetted and covered with a 13 mm thick layer
of mortar composed of
cementandsandinthesameratioasintheconcretemixitself.This13mmlayerofmortarshallbefr
eshlymixedandplacedimmediatelybeforeplacingofnewconcrete.Whereconcretehasnotfully
hardened,alllaitanceshallberemovedbyscrubbingthewetsurfacewithwireorbristlebrushes,c
arebeingtakentoavoiddislodgmentofanyparticles of coarse aggregate. The surface shall
then be thoroughly wetted, all free
waterremovedandthencoatedwithneatcementgrout.Thefirstlayerofconcretetobeplaced on
this surface shall not exceed 150 mm in thickness and shall be well
rammedagainstoldworkparticularattentionbeinggiventocornersandclosespots.
3.5.4 Allconcreteshallbecompactedtoproduceadensehomogeneousmasswiththeassistanceofvibr
ators,unless,otherwisepermittedbytheEngineer-in-
chargeforexceptionalcases,suchasconcretingunderwater,wherevibratorscannotbeused.Suf
ficient vibrators in serviceable conditionshall be kept at site so
thatspareequipmentisalwaysavailableintheeventofbreakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the
coarseaggregateandbeginstocreamuptoformanevensurface.Compactionshallbecompleted
beforetheinitialsetting starts i.e.within 30 minutes of addition ofwater
todrymixture.Duringcompaction,itshallbeobservedthatneedlevibratorsarenotappliedonrei
nforcementwhichislikelytodestroythebondbetweenconcreteandreinforcement.
3.6 Curing:Immediatelyaftercompaction,concreteshallbeprotectedfromweatherincluding rain,
running water, shocks, vibration, traffic, rapid temperature changes, frostand drying out
process. It shall be covered with wet sacking, hassain or other
similarabsorbantmaterialapproved,soonaftertheinitialsetandshallbekeptcontinuouslywetf
oraperiodofnotlessthan14daysfromthedateofplacement.Masonarywork
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 7-
overfoundationconcretemaybestartedafter48hoursofitslayingbutcuringofconcreteshallbec
ontinuedforaminimumperiodof14days.
3.7 SamplingandTestingofconcrete:
3.7.1 Samplesfromfreshconcreteshallbetakenasper I.S.1199-1959 andcubesshallbemade, cured
and tested at 7 days or 28 days as per requirements in accordance with I.S.516-1959. A
random sampling procedure shall be adopted to ensure that each concretebatch shall
have a reasonable chance of being tested i.e. the sampling should be
spreadovertheentireperiodofconcretingandcoverallmixingunits.Theminimumfrequencyofs
amplingofconcreteofeachgradeshallbeinaccordancewith following:
Quantityofconcreteint No. of Quantityofconcreteinthewor No.ofsamples
hework samples ks
1-5Cmt. 1 16-30Cmt.
51andabove4+oneadditionalforeachadditional50M.orpartthereof.
NOTE : At least one sample shall be taken from each shift.Tentestspecimens shall be
madefromeachsample, five fortestingat7 daysand
theremainingfiveat28days.Thesamplesofconcreteshallbetakenoneachdayoftheconcretinga
sperabovefrequency. The number of specimens may be suitably increased as deemed
necessary bythe Engineer-in-charge when procedure of tests given above reveals a poor
quality ofconcreteandinotherspecialcases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than
thespecified cube strength of 150 Kg/Cm2at 28days.20%of the cubes castfor each
daymayhave value less than thespecified strength provided the lowestvalue is
notlessthan85%ofthespecifiedstrength.Iftheconcretemadeinaccordancewiththeproportion
sgivenforaparticulargrade,doesnotyieldthespecifiedstrength;suchconcrete
shallbeclassified as belongingto the appropriatelower grade. Concrete
madeinaccordancewith the proportions given for a particular grade shall not, however,
beplacedinahighergradeonthegroundthattheteststrengtharehigherthantheminimumspecif
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention
tostrike the form work. While fixing the time for removal of form work, due
considerationshallbe given to local conditions, character for the structure, the weather
and othercondition that influence the setting of concrete and of the materials used in the
Innormalcircumstances(generallywheretemperaturesareabove200C)andwhereordinaryco
ncrete is used, forms maybe struck after expiryofperiodsspecified in
itemNo9.1(A)forrespectiveitemofformwork.
3.8.2 All form work shall be removed without causing any shock or vibration as would
damagethe concrete. Before the soffit and struts are removed, the concrete surface shall
beexposed,wherenecessaryinordertoascertainthattheconcretehassufficientlyhardened.Ce
nteringshallbegraduallyanduniformlyloweredinsuchmannerastopermittheconcretetotakes
tressesdueto its ownweightuniformlyandgradually.Where internal metal ties are
permitted, the or their removable parts shall be extractedwithout causing any damage to
the concrete and remaining holes filled with mortar. Nopermanently embedded metal
part shallhave less than 25 mm cover to the
finishedconcretesurface.Whereitisintendedtore-usetheformwork,itshallbecleanedand
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx - 8-
made good to the satisfaction of the Engineer-in-charge. After removal of form work
andshuttering, the Executive Engineer shall inspect the work and satisfy by
randomchecksthatconcreteproducedisofgoodquality.
3.8.3 Immediatelyaftertheremovalofforms,allexposedboltsetc.,passingthroughthecement
concrete member and used for shuttering or anyotherpurposeshallbecutinside the cement
concrete member to a depth ofat least 25 mmbelowthesurfaceofthe concrete and the
resulting holes be filled by cement mortar. All fine caused by
formjoints,allcavitiesproducedbytheremovalofformtiesandallotherholesanddepressionsho
neycombspots,brokenedgesorcornersandotherdefectsshallbethoroughly cleaned,
saturated with water and carefully pointed and rendered true
withmortarofcementandfineaggregate mixed in theproportionsused
inthegradeofconcretethatisbeingfinishedandofasdryconsistencyasispossibletouse.Consider
able pressure shall be applied in filling and pointing to ensure thorough filling
inallvoids.Surfaceswhicharepointedshallbekeptmostforaperiodof25hours.
Ifrockpockets/honeycombs intheopinionoftheEngineer-in-chargeareofsuchanextent or
character as to effectthestrengthofthestructuremateriallyor to
endangerthelifeofthesteelreinforcement,hemaydeclaretheconcretedefectiveand
requiretheremovalandreplacementoftheportionofthestructureaffected.
4.0 Modeofmeasurementandpayment:
4.1 Theconsolidatedcubicalcontentsofconcreteworkasspecifiedinitemshallbemeasured. The
concrete laid in excess of section shown on drawings or as directed
shallnotbemeasured.Nodeductionshallbemadefor–
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters,
purlinetrusses,corbels andstepsetc.upto500Sq.Cm.insection.
(b) Openingupto0.1Sq.M.
4.2 Therateincludescostofallmaterials,labour,toolsandplantrequiredformixing,placing in
position, vibrating and compacting, finishing, as directed, curing and all otherincidental
expenses for producing concrete of specified strength. The rate excludes
thecostofformwork.
4.3 Therateshallbeforaunitofonecubicmeter.
5.0 ITEMNo.5:-PaintingandletteringtheboardonbothsideofMSsheetwithathicknessof16 mm gauge
and letters by oil paint confirming with 2 coats of red oxide and oil paint
Itemincludesnecessarystagingcartingandtransportationorasdirectedbyengineerincharge(app.r
TherateshallbeforaunitofSmt.Basis
6.0 ITEMNo.6:-RepairingorRemovingofExistingBoardsandRe-
fixingthesamewiththehelpofrequiredmachinery.TheItemRateIncludesRepairing,Welding,Paint
ingetc…CompWork AsDirectedByEngineer In Charge. The Rate IncludesnecessaryStaging with
all toolsandtackleswithRequiredManpoweratanyHeight.
TherateshallbeforaunitofJob.Basis
ITEM No.7:Manufacturing and supplying barricades as per drgs consisting of(1) Outerframe
25 x 25 x 1.6 mm M.S.rectangular section (1.3 mtr wide and 1.1 mtrheight)
(2)Internal@ noextrapanelsconsists of20x 20x1.6mmM.S.Hollowrectangular
section withM.S. plates 2 mm thick ( size 1.3 mtr
x1.1mr)(3)2no0.3meterdia1.6mmthickroundM.S.plateforAMClogo.(4)4
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -9-
notrollywheels(5)RequireM.S.flateof20x5mmforfixingM.S.Rectangular sheet
and 5 mm Square bar for M.S. round sheet. (6) fixingthenecessary radium
sheet with radium letters as per instruction and AMC
logoonbothsidetheM.S.sheet
TheaboveitemshouldbemeasuredinNosandshouldbesuppliedasdirectedbyengineerincharge.
Contractor'sSign Addl.C.E.(westzone)
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -10-
MAHANAGARSEVASADAN,AMDAVADE
NGINEERINGDEPARTMENT
PERCENTAGERATETENDERANDCONTRACTFORWORKS
ADDITIONALINSTRUCTIONSTOPERSONSTENDERING
1. CompetencyofTendererNocontractwillbeawardedexcepttoresponsiblebidd
ercapableforperformingtheclass of
workcompleted.Beforetheawardofthecontract,anybidder may
berequiredtoshowthathehas the necessary facilities,
experience,abilityandfinancialresourcestoperformtheworkinsatisfactorym
ennerw ithinthetimestipulated.Contractormayberequired tofurnishthe
department with the statement as totheirexperience
andtheirfinancialstatus.
2. . Tendererwillbedeemedto have inspected the site and to have
satisfiedhimselfastothenatureofallworks, all existing roads water -way and
othermeansofcommunicationandaccesstoand from the site ofworkand
thebuildingthatmayberequiredfortemporarypurposeinconnectionwiththeconstructi
on,completion andmaintenance fothe works and must make hisownenquiries as
to work yard, sites, depot and dumps and astothe cquistionofsuchadditional sites
and areas asmaybe necessary for temporary
purposeforconstructing,completingandmaintainingtheworks.
Thetenderermustunderstandclearlytheratesquotedareforcompletedworksandinclud
eallcostduetolabour,scaffoldingplant,supervision,servicework, power, royalties
and octroietc. and includeallextrastocoverthecostofnightworki fan when required.
No claim foradditionalpaymentbeyondthepricesorrates quoted will be
entertained andthetenderwillnot be entitled subsequently to make may claim
onthegroundofmisrepresentationoronthegroundthathe was supplied with
informationgivenbyanyperson(
whetherthememberistheemployeeofEngineeringDepartmentofCorporationornot).An
yfailture onhispart to obtain allnecessaryinformationforthepurposeofmakinghis
tender and fi l ling theseveralprices and rates therein shall not relieve him
orliabilitiesarisingouto,orconsequentuponthesubmissionofthetender.
4. . TenderForms:-
Everyblankintheformoftenderandintheschedulemustbefilledupbythetendererandhemu
streturnthedocumentssentherewith.
5. . Erasures :-Persons tendering are informed that
noerasuresofalternationsbythemin the text of the documents sent herewith will be
allowed and any sucherasuresoralternationswill bedisregarded. I fthereis any error
in writing noover- writing should bedone,thewrongwordsorafigureshould be struck
outandthecorrectonewrittenaboveorneari tin unambiguous way,
Eachcorrectionshouldbeinitialed.
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -11-
CONTRACTORSTOPLEASEREADTHISCAREFULLY
1. . The ratefor i temsin Schedule ' B' must be given in words and f igures.
Amountofeachitemmustalsobeenteredin columnsand grand total
oftheamountmustbestruckoutbythetenderer.
2. . I fthetender is taken in favourofthecompany, apowerofattorneyin
favourofthepersonwhomayhave signed the tender for the company
mustaccompanythetender.
3. . Solvency Certificate ofaBankoraRevenueOfficer ofanamount upto20%
ofthetenderedcostplusthe amount ofworksonhandstill to be executed
willhavetoberoducedbytheContractor.
4. . Challanforearnestmoneymustaccompanythetender. Tenderer maypayearnest
money in the form of CROSSED Demand Draft of alocal Bank drawn
infavouroftheMunicipalCommissionerofMunicipal
Corporation,Ahmedabad.Earnestmoneyincashorbychequeshallnotbeaccepted.
TheContractorshallhavetofurnishIncomeTaxClearanceCertificatebeforetenderisacce
ptedandintimateassessmentnumberandwardunderwhichisassessed.
6. . Copies ofcertificateas regards previous experience i fanymust accompany
7. . DeclarationshowingallworksonhandwiththeContractor and the value
ofworksthatremaintobeexecutedineachcasemustaccompanytender.
8. . AllpagesofSchedule' A',' B'andspecificationsshouldbeinitialedbytheContractor.
9. . Allcorrections,erasuresand over writing should be initialed by theContractor.
10. DiscrepanciesandAdjustmentofErrors:Anyerrorinquantityoramountinschedule'
B'showingitemsofworkstobecarriedoutshallbeadjustedinaccordancewiththefollowing
(a) ) In theevent ofadiscrepancybetween description in words and figures
quotedbyatendererinthe ' rates' column, the description
inwordsshallprevail.
(b) ) In the event ofanerror occuringin the ' amount' column oftheschedule' B'
showing i temsof work, as a result of wrongmultiplicationoftheunit-
rateandquantity,theunits-rate shall beregardedas firm and multiplication
shall beamendedonthebasis oftherates.
(c) ) All errors in totalingin amount column and in carry forward
totalsshallbecorrected.
(d) ) Anyroundingoffofamountsagainst'items'or'totals'shallbeignored.
10. . (i) I tanypleasebenotedthattenderwill beconsideredasinvalid especially,
i ftherequirements asperinstruction. No. 1to10
abovearenotcomp liedwithbeforesubmitt ingthetender.Alsopleasereadcarefullyt
heface-sheetandGeneralRulesand
DirectionsfortheguidanceofContractorsofthisform.
( ii )Rightisreservedtorejectany oralltender ( s) without assigning
anyreason(s)thereof.
Thetenderwillbeliabletoberejectedouttightifthetendererhasfiledintenderdo
cumentsbyballpeninsteadinink.
11. Inadditiontotheabove,thnetenderwillalsobeliabletoberejctedoutrightif:
(i) ) The tenderer proposesanyalternationinthe works specifiedorinthet
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -12-
imeallowedforcarryingthe work oranycondition
orcorrectionmadeinanycodeormodeofschedule'B'orspecifications.
(ii) i) Anyofthepage/pagesofthetenderis/areremovedorreplaced.
(ii) i )All corrections, additions or pasted slips are not initialed
(iv) ) Anyerasureismadebyhiminthetender.and
(v) ) The tenderer or in the case of a fi rm, each partner or
thepersionholding the power of attorney there ofdoesnot sign
orthesignaturesis
/arenotattestedbyawitnessonpage 9the tender in the
spaceprovidedforthepurpose.
12. AcertificateofregistrationasapprovedContractor should be attached
12A. InrespectofthetendersfromtheCo-operativeSociety,a
solvency, certificate ofanamountequalto20% oftheamount of
theworkputtotenderwillhavetobeproducedalongwiththetenderora
certificateregardingtheborrowingcapacityofthesociety issued
bytheLegalAssistant,DirectorateCottageindustrieswillhavetobe
producedalongwiththetender.
13. . (1) Theseveraldocumentsformingthecontractarethe
essentialparts ofthecontract arequirementoccurring in one is asbindingas
though occurring in all they are intended to bemutually explanatory and
comp lementary and to described and provide for acompletework.
(2) ) In the event of any discrepancy, the several documents
formingthecontract or in any one document the following order
orprecedenceshouldapply:
(a) ) Dimensionandquantities:-
Drawingsapprovedforconstruction.(ii)
Schedule'B'ofthetenderform.
(iii) Specification.
Ondrawing,figured,dimensions, unless obviously, incorrect
willbefollowedinpreferencetoscaleddimension.
(i) ) Schedule '
B'ofthetenderform.(ii)Drawings.
(iii) Specifications.
Incaseofdefectivedescriptionorambiguity, the Engineer- in- Charge
shouldissuefurtherinstructionsdirectingin what manner the work is to
becarriedout, i tbeingunderstood that the best modern practiceisto befollowed.
TheContractorshouldforthwithcomplywithsuchinstructions.
14. TheContractorshould take noadvantageofanyapparenterror
oromissionindrawingsorspecificationsandtheEngineer- in- Charge shall make
suchcorrectionsandinterpretationsas necessary to fulfill the intent
oftheplantsandspecification.
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -13-
NameofWork: MuncipalCounsiliorShree,MLAShree,M.P Shree And other Budget
in Making of M.S. Board for Direction at Main Road for Different Societies &Chali's and
supplying Barricading Board in Nava Vadaj Ward at West Zone.(ARC).
DECLARATIONFORM
1. . I/ WeherebydeclarethatI/ Wehavevisitedtheandfullysequiredmyself/ourselves
withthelocalregardingmaterials, labourand other
factorspertainingtotheworkbeforesubmittingthistender.
2. . I/ WeherebydeclarethatI/ Wehavecarefullystudiedthe conditions ofcontract,
specification andother
tenderdocumentsofthisworkandagreetoexecutethesameaccordingly.
Date SignatureoftheContractor
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -14-
MAHANAGARSEVASADAN,AMDAVADDEPARTMENT
Name ofWork-: MuncipalCounsiliorShree,MLAShree,M.P Shree And other Budget in
Making of M.S. Board for Direction at Main Road for Different Societies &Chali's
and supplying Barricading Board in Nava Vadaj Ward at West Zone.(ARC)
GENERAL SPECIFICATION
(1) ) Theworkshallbecompletedwithin12Months
(2) ) The contractor shall beremainresponsible for Workmen’ scompensationi
fanywhensuch caseoccurs.Thecontractor shall arrange formed
iampasantnightandfencing and pagiand shall be responsible for any damage of l
i feand limb or property i f any happen, during the execution of work. In case
ofdisputefor unseen oroverlooked i temsthe decision of the city Engineer
shallbefinal. The contractor shall have to give site clean ofallrubbish
oncompletionofworkand have over the building with final finishing ofthework as
directed. Alltherejectedmaterials shall beremovedfrom site within 24 hours
bycontractoratthisrskandcost.
(3) ) For mixing mortar either for masonry orforplaster orfor any
otherpurposecontractor shall have to prepare through ofbiggersize and mix
themortarin the required proportion. In oncasehe shall be allowed to mix
themortareitheronfloororanyfinishedsurfaces.
Thecontractorshallhavetomakehisownarrangementforwaterrequiredfortheworkandshall
paythewaterchargesasperwatermeter.
(5) ) I fanyextra i tem crops up during the progress ofworkthe same shall
becarriedoutbythecontractor and heshallbe paid at the rate fixed by C. E. as
pertherateanalysisbasedoncurrentmarketrates.
(6) ) I finthe interest oftheCorporation i tis necessary to change either anysiteor
the design ofthepropose work the contractor shall carry out the
sameathisquotedrateswithout charges any extra and the contractor will have
tocarryout theworksand he will be paid at the rate quoted by him and no
claimforextraforsubsequentchangesmaybeentertained.
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -15-
(7) ) Retetionmoney at the rate of2 % shall be deducted from every
runningbillofthecontractorandwhichwill bepaidatthet imeoffinalbill, for works
costingMorethanRs.10-00lakhs.
(8) )The tender for the work shall remain open for aperiod( 120 )days from
thedateofopeningofthetenders for this work and that the tenderer shall not
beallowedtowithdrawonmodifytheofferonhisown during the period. I fanytenderer
withdraw or makes any modifications ( s) or addition ( s) in thetermsand
conditions of his tender not acceptable to the MunicipalCorporationtheMunicipal
Corporation shall without prejudice to any right
orremedybeatlibertytoforfeitinfullthesaidearnestmoneyabsolutely.
(9) ) As per CircularNo. MCR 2176 ( 96) 2418 ( ii ) GHH dated 31 - 03- 77issued
by Government of Gujarat contractors are requested to producetheirquarry
materials for construction work through legal sources. i .e.onlyformthequarry
lease holders, permit holder ormiddleman who satisfies
thecontractorastothelegalityofthesourceofpurchasebyhimonthesematerials.
(10) ) I ftheworki snot carried out within the specified t imelimit in clause no. 1the
penalty of0. 1 % per day of remaining work after Stipulated time l
imitandmaximum 10 % of remaining work for the entire period of delay
shallberecoveredfromtheimmediatebillspayabletothecontractor.
(11) ) Contractor hasto make his own arrangement for procurement of
steelandcement.
(12) ) Conditionaltenderwillnotbeaccepted.
Alltendersaretobesubmittedinduplicatewithoutwhichthetendersar
eliabletoberejected.
(15) ) Conditionofform B1Standard Specification ofmaterial&code
ofpracticewillbeapplicable.FormB1&B2canbeisavailableonwebsite.
Contractor’sSignatureAdd.CityEngineer(WestZone)
D:\JIGAR\TenderNotice(2021-2022)\TenderNoticeNo.16(E-Tender)\Ranip\ARCBoardTender2022-23.docx -16-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 17.pdf
Download all tender documents and submit your bid