Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.6 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹5.6 L | L-1 | Accepted-AOC L-1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | M/S KUMAR CONSTRUCTION and CO. L1 |
|---|---|---|---|---|
| 1.00 | 133A&B deck plate channel repairing/changing Frame and roller dismantling cost. | 13.28 | MT | 2,609 ₹34,644.91 Lowest |
| 2.00 | Deck plate dismantling cost (90% of new) 6.358MT and dismantling cost 90% of new 7.065MT. | 12.08 | MT | 6,881 ₹83,129.36 Lowest |
| 3.00 | Old channel and support dismantling cost (1.245) and 60% of new (2.267MT)=1.360MT | 2.6 | MT | 6,881 ₹17,925.01 Lowest |
| 4.00 | Deck plate channel & support fabrication cost.(6358.50Kg+2075.0Kg)=8.433MTand (5.722.65Kg+2266.8Kg)=7.989MT | 16.42 | MT | 16,402 ₹2,69,353.64 Lowest |
| 5.00 | Frame and roller re-installation cost. (5.602+7.677)= | 13.28 | MT | 5,219 ₹69,303.1 Lowest |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
7 Aug 2026, 6:00 pmClosed
PAWAN KUMAR
kedla washery
Repairing of 133 A and B deck plate channel of Pre-Washery at Kedla Washery
2026_CCL_362574_1
PO/KW/E-Tender/26-27/15, Date- 27.07.2026
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
Yes
8 Sept 2026
27 Jul 2026
8 Aug 2026
28 Jul 2026
7 Aug 2026
28 Jul 2026
28 Jul 2026 - 3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 133A&B deck plate channel repairing/changing Frame and roller dismantling cost. | 13.28 | MT | - | - |
| 2 | Deck plate dismantling cost (90% of new) 6.358MT and dismantling cost 90% of new 7.065MT. | 12.08 | MT | - | - |
| 3 | Old channel and support dismantling cost (1.245) and 60% of new (2.267MT)=1.360MT | 2.61 | MT | - | - |
| 4 | Deck plate channel & support fabrication cost.(6358.50Kg+2075.0Kg)=8.433MTand (5.722.65Kg+2266.8Kg)=7.989MT | 16.42 | MT | - | - |
| 5 | Frame and roller re-installation cost. (5.602+7.677)= | 13.28 | MT | - | - |
| 6 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_375483.xls
BOQ • 0.28 MB
NIT15R.pdf
PDF • 2.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .