| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC VILL BAHIRSONA P O TALDI P S CANNING DIST SOUTH 24 PARGANAS 743376 W B | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | 743376 | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹2.1 L (1.24%)Rejected-AOC | ₹1.7 Cr+₹2.1 L (1.24%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.8 Cr+₹6.6 L (3.86%)Rejected-AOC HURA HURA HURA DIST PURULIA W B PIN 723130 | PURULIA | WEST BENGAL | 723130 | ₹1.8 Cr+₹6.6 L (3.86%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.8 Cr+₹7.8 L (4.55%)Rejected-AOC | ₹1.8 Cr+₹7.8 L (4.55%) | L4 | Rejected-AOC L4 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
10 Jan 2020, 3:00 pmClosed
DPD Technical South 24 Parganas DPMU
49/2 GARIAHAT ROAD KOLKATA 700019
All in one Bid for Construction of 1 nos Water Detention Structures WDS at Bhagabanpur WDS Plot No 601 738 747 JL No 90 Block Mathurapur I in the District of South 24 Parganas under WBADMI Project
2019_WRDD_258827_1
14 / S24PGS DPMU / ADMIP /2019-20
Open Tender
CIVIL WORKS
Item Rate
180 days
Mathurapur I
SEE THE NCB
2 documents required · 2 mandatory
₹3.4 L
16 Apr 2020
11 Dec 2019
15 Jan 2020
11 Dec 2019
10 Jan 2020
12 Dec 2019
11 Dec 2019 - 12 Dec 2019
Amount
EXCAVATION WORKS
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Cutting, uprooting of roots & stumps of trees of different girth upto 1 meter depth below ground level or bed level & filling the rootholes by soil and removal of branches, roots & stumps etc. including carriage and stacking as per instruction of the Engineer-in-charge (Measurement of girth at breast height of 90 cm) (b) Banana cluster/ Pineapple
Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and post worl) a) For Excavation of Canal
Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water.
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter.(Dia. To be measured at mid length)
Driving bamboo pins where boats are not necessary.
Supply of empty cement polythene bags in good condition
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028cum/ bag
Supplying, fitting, fixing with iron nails half split bamboo wailing pieses (av. dia. of bamboo not less than 50 mm.)
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site) 4 % of Total (except it No. 1.04)
Inlet And Outlet structure 30 nos Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. a) Pakur Variety.
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. (D) 600 mm dia [ Ref: ₹ 381.00 + Analysis for cost of carriage & Materials attached]
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth .
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site) 4 % of Total (except it No. 2.00, 2.07)
DOUBLE VENT 1200 MM DIA CULVERT 3 Nos Earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete .(a) Depth of excavation not exceeding 1,500 mm.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. (A)1200 mm dia [ Ref: ₹ 1020.00 + Analysis for cost of carrige & Materials attacched]
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter.(Dia. To be measured at mid length)
Driving bamboo pins where boats are not necessary.
Supply of empty cement polythene bags in good condition
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028cum/ bag
Supplying, fitting, fixing with iron nails half split bamboo wailing pieses (av. dia. of bamboo not less than 50 mm.)
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. a) Pakur Variety.
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth .
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site) 4 % of Total (except it No. 3.00, 3.10)
DISPLAY BOARD Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. a) Pakur Variety.
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth .
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar. 20 mm thick plaster, in ground floor
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.
18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer-in-charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m]
Painting block letters or digits in Black Japan or any approved paint as per direction. c) Size above 4 cm. and upto 5 cm.
d) Size above 5 cm. and upto 7.5 cm
Extra carriage of materials by cart/boat/head load besides initial transport of construction materials by truck (from road to work site) 4 % of Total (except it No. 4.00, 4.04)
TOTAL WITHOUT TAX
ADD 5%GST
ADD 1% LABOUR CESS
MELOWGLINT SYNDICATE
DUTTA CONSTRUCTION
RMGC BASAK DEVELOPERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .