| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.1 LAccepted-Finance | ₹56.1 L | L1 | Accepted-Finance RESPONSIVE |
| 2 | L2₹57.0 LRejected-Finance | ₹57.0 L | L2 | Rejected-Finance NON RESPONSIVE |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | Hillway Constructions L1 | P V ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | 1,068.96 | Cum | 379.91 ₹73,100.41 | 385.7 ₹74,213.62 |
| 2.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,
etc. including supply of all material, labour, T&P and royaltiies etc.
complete as per drawing and technical specifications Clauses 702, 704,
1202 & 1203 of MORD Specifiction | 753.07 | Cum | 2,246.59 ₹3.0 L | 2,280.8 ₹3.1 L |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in
breast walls, retaining walls, parapets, scuppers, etc. including supply of all
material, labour, T&P and royaltiies etc. complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Specifiction | 47.66 | Cum | 3,781.41 ₹32,440 | 3,839 ₹32,934.01 |
| 4.00 | Hand Packed stone filling in back of wallls including cost of all materials,
royality, T&P etc. complete as per direction of Engineer-in- charge. (As per
PWD Uttarakhand specifications) | 215.51 | Cum | 1,004.31 ₹38,958.84 | 1,019.6 ₹39,552.12 |
| 5.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including
supply of all material, labour, T&P etc. required for proper completion of the work. as
per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD
Specifiction | 522 | Cum | 4,023.33 ₹3.8 L | 4,084.6 ₹3.8 L |
| 6.00 | Providingand layingof wirecrates3.00x1.50x1.50 insizewithGI wire conformingtoIS:280&IS:4826in150mmx150mmmeshlaidwithstone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 94.5 | Cum | 1,725.52 ₹29,351.15 | 1,751.8 ₹29,798.12 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
31 Mar 2026, 1:00 pmClosed
Zonal Manager
PLOT NO. 56/1 LANE C-11, TURNER ROAD, DEHRADUN (UTTARAKHAND)
Restoration work of Amsaur to Jamargaddi MOTOR ROAD (Fund to be sanctioned)
2026_CCUK_147088_1
UT-08-18 (Aapda)
National Competitive Bid
CIVIL
30 days
DUGADDA
As per technical bid
3 documents required · 3 mandatory
₹5,900
Zonal Manager, NPCC LTD
₹1.1 L
15 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - | Item1 | |
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,
etc. including supply of all material, labour, T&P and royaltiies etc.
complete as per drawing and technical specifications Clauses 702, 704,
1202 & 1203 of MORD Specifiction | 1 | Cum | - | - | Item2 | |
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in
breast walls, retaining walls, parapets, scuppers, etc. including supply of all
material, labour, T&P and royaltiies etc. complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Specifiction | 1 | Cum | - | - | Item3 | |
Hand Packed stone filling in back of wallls including cost of all materials,
royality, T&P etc. complete as per direction of Engineer-in- charge. (As per
PWD Uttarakhand specifications) | 1 | Cum | - | - | Item4 | |
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including
supply of all material, labour, T&P etc. required for proper completion of the work. as
per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD
Specifiction | - | Cum | - | - | Item5 | |
Providingand layingof wirecrates3.00x1.50x1.50 insizewithGI wire conformingtoIS:280&IS:4826in150mmx150mmmeshlaidwithstone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | Cum | - | - | Item6 |
stage.html
html • 0.04 MB
technical_228694.pdf
techsummary_228694.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_228694.xls
BOQ • 0.25 MB
SBD.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid