Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC HPSEBL THALOUT | ₹2.7 L Quoted ₹2.8 L | L1 | Accepted-AOC Award |
| 2 | L2₹2.8 LRejected-Finance | ₹2.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 LRejected-Finance | ₹3.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹4.7 LRejected-Finance R O SUJANPUR TEHSIL DISTT HAMRIPUR | ₹4.7 L | L4 | Rejected-Finance L4 |
| 5 | L5₹5.0 LRejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹5.0 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SANJAY SAINI L5 | RAJE ENGINNERING WORKS L3 | Sunil Kumar L4 | Mehtab Singh L2 | Pardyum Kumar L1 | Naresh Kumar L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Removal of slip in all kinds of soil including saturated soil but excluding boulder and rocky portion required blasting upto a distnace of 20 mtrs disposing of unservicable material stacking servicable material and neatly dressing the surface. | 68 | cum | 950 ₹64,600 | 850 ₹57,800 | 900 ₹61,200 | 500 ₹34,000 | 300 ₹20,400 Lowest | 300 ₹20,400 Lowest |
| 2.00 | Cutting in earth work and disposal of excavated earth work upto a lead of 20 mtr (in spade work 30%,pick work 30% and jumper work 40%). | 12.96 | cum | 450 ₹5,832 | 370 ₹4,795.2 | 410 ₹5,313.6 | 1,000 ₹12,960 | 300 ₹3,888 Lowest | 300 ₹3,888 Lowest |
| 3.00 | Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-site-reinforced concrete and plain concrete work in:- Vertical surfaces such as walls (any thick) partitions & the like i/c attached pilasters, buttresses, plinth & string courses & the like | 38.48 | Sqm | 600 ₹23,088 | 490 ₹18,855.2 | 560 ₹21,548.8 | 100 ₹3,848 Lowest | 250 ₹9,620 | 250 ₹9,620 |
| 4.00 | Providing & laying cement concrete 1:5:10 (1 Cement:5 sand:10 graded stone aggregate 40mm nominal size)w with 15% plum and curing complete excluding cost of from work in retaining wall/breast wall the size of plums shall usually be 150mm to 300mm as per HPPWD specification with in all leads and lifts. | 14.85 | cum | 6,750 ₹1,00,237.5 | 6,200 ₹92,070 | 6,500 ₹96,525 | 5,600 ₹83,160 | 4,500 ₹66,825 Lowest | 4,500 ₹66,825 Lowest |
| 5.00 | Boulder filling behind the retaining wall with in all leads and lifts to the entire satisfaction of Engineer in charge. | 2.16 | cum | 2,980 ₹6,436.8 | 2,600 ₹5,616 | 2,800 ₹6,048 | 1,000 ₹2,160 Lowest | 1,500 ₹3,240 | 1,500 ₹3,240 |
| 6.00 | Providing weep hole in retaining wall with 80mm dia PVC with in all leads and lifts. | 12 | Rmt | 250 ₹3,000 | 180 ₹2,160 | 230 ₹2,760 | 100 ₹1,200 | 70 ₹840 Lowest | 70 ₹840 Lowest |
| 7.00Circumferencial Butt welding for joining by elecrical are welding to various dia GI Pipe welded as required numbers of weld runs so mass to achieve the minimum effective throat thickness of welding confirming to IS 1239-2004 specifications by using welding electrodes confirming to IS 814-1991 at site of works complete in all respect as per direction and to the entire satisfaction of Engineer in charge. | |||||||||
| 7.10 | 150mm | 12 | Joint | 1,480 ₹17,760 | 1,200 ₹14,400 | 1,400 ₹16,800 | 2,800 ₹33,600 | 800 ₹9,600 Lowest | 800 ₹9,600 Lowest |
| 7.20 | 200mm | 10 | Joint | 1,830 ₹18,300 | 1,500 ₹15,000 | 1,700 ₹17,000 | 3,200 ₹32,000 | 1,000 ₹10,000 Lowest | 1,000 ₹10,000 Lowest |
| 8.00Providing and fixing of cast iron sluice valve (with hand wheel ) confirming to BIS 14846 (Latest with upto date ammendments) class PN-1.60 to 10.20 kg/cm2 of Kirloskar/ Leader make of dia excluding the cost of M.S. flanges, nuts/bolts gasket sheet not less than 3mm thickness etc. and as per direction and to the entire satisfaction of Engineer in charge with in all leads and lifts. | |||||||||
Tender Value
₹4.0 L
EMD Value
₹8,029
Closing Date
15 Sept 2025, 10:30 amClosed
EE Jal Shakti Division Thural
EE Jal Shakti Division Thural
Removal of slips, Construction of Retaining wall, Repair and Restoration of damaged common header 1st stage of LIS Naun
2025_HPIPH_113568_1
EE/JSVD/THL/2025-26-5347-5405 Dt. 02.09.2025
Open Tender
Miscellaneous Works
Item Rate
90 days
EE Jal Shakti Division Thural
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Jal Shakti Division Thural
₹8,029
29 Jul 2026
2 Sept 2025
15 Sept 2025
2 Sept 2025
15 Sept 2025
2 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].