Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance 53 VAISHAILI ENCLAVE SECTOR 9 INDIRA NAGAR LUCKNOW | LUCKNOW | ₹4.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.5 CrAdmitted-Finance | ₹4.5 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical UNIT NO 804 8TH FLOOR SPAZE PLATINUM TOWER SOHNA ROAD GURUGRAM HARYANA 122018 | GURUGRAM | GURUGRAM | HARYANA | 122018 | - | - | Rejected-Technical rejected |
| Sl No | Description | Qty | Unit | KRISHNA REFRIGERATION L1 | Unity Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Operation and Comprehensive Maintenance Contract of High side and low side of HVAC System comprising of all the machineries & equipment installed in the AC Chiller Plant including Chillers, Cooling Towers, Condenser, Pumps, Primary & Secondary Pumps, Hot water generators, VFDs & Automation of Pumps, Air washer, Air Handling Units, FCUs, Ventilation Fans, In-line Fans, Plant Manager with BMS system, UVGI, Heat Recovery wheels, Humidifier, filters of AHUs and FCUs, Electrical Panel and other associates equipment and works throughout the period of contract for 24 hrs x 365 days as per conditions and scope of work of the Tender. Hepa Filters Validation of OT in every 6-months and if found faulty then replace it. | 8 | Quarterly | 55,70,625 ₹4.5 Cr | 56,00,000 ₹4.5 Cr |
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
12 Jan 2026, 3:00 pmClosed
Executive Engineer Electrical
SE office Fire Station at AIIMS Deoghar
Operation and Comprehensive Maintenance Contract of High side and Low side of HVAC System at AIIMS Deoghar
2025_AIMDE_889716_1
18/EE/AIIMS/Deo/2025-26
Open Tender
AMC/ Maintenance Contracts
AIIMS DEOGHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9.0 L
Yes
SE office Fire Station at AIIMS Deoghar
12 Feb 2026
12 Dec 2025
13 Jan 2026
12 Dec 2025
12 Jan 2026
12 Dec 2025
26 Dec 2025
Operation and Comprehensive Maintenance Contract of High side and low side of HVAC System comprising of all the machineries & equipment installed in the AC Chiller Plant including Chillers, Cooling Towers, Condenser, Pumps, Primary & Secondary Pumps, Hot water generators, VFDs & Automation of Pumps, Air washer, Air Handling Units, FCUs, Ventilation Fans, In-line Fans, Plant Manager with BMS system, UVGI, Heat Recovery wheels, Humidifier, filters of AHUs and FCUs, Electrical Panel and other associates equipment and works throughout the period of contract for 24 hrs x 365 days as per conditions and scope of work of the Tender. Hepa Filters Validation of OT in every 6-months and if found faulty then replace it.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.73 MB
BOQ_935146.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid