Loading…
Loading…
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
6 Oct 2026, 5:00 pm
Addl. Chief Engineer, OTDC Ltd.,
O/o The Addl. Chief Engineer, OTDC Ltd.,
Infrastructure Development of Satapada in Puri District.
2026_OTDC_141376_1
ACE/OTDC/08/2026-27 dtd. 19.09.2026
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Satapada
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹2.3 L
Yes
22 Sept 2026
22 Sept 2026
7 Oct 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | Dismantling and removing R.C.C. columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead. | 32.54 | Cum | 1,731.8 | ₹56,352.77 |
| 3 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead. | 27.56 | Cum | 877.2 | ₹24,175.63 |
| 4 | Dismantling brick or stone masonry in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead. | 20.47 | Cum | 1,646.6 | ₹33,705.9 |
| 5 | Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height.(SOR-2022, Item No-25.8 Page No -225) | 1,500 | Sqm | 5.12 | ₹7,680 |
| 6 | Double under reamed pile foundation with R.C.C. M20 using 12mm size black hard granite (crusher broken)stone chips including cost of boreholes including cost of M.S. rod/Tar steel and labour | - | - | - | - |
| 7 | 300mm 6Mtr Long | 120 | Each | 7,670.7 | ₹9,20,484 |
| 8 | Dewatering using 5.0 HP diesel pump including cost of all and complete finished in all respect. | 319.55 | Hour | 557.5 | ₹1,78,149.13 |
| 9 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel & muroom, etc interspread with boulders upto 1/2 cum size with all lifts & delifts including trimming of slopes & bed to design section and depositing the excavated materialsaway from work site as per the specification and as directed by the Engineer-in-Charge within an initial lead of 3 KM from the place of excavation complete. | 3,834.6 | Cum | 238 | ₹9,12,634.8 |
| 10 | Earth work in excavation in all kinds of soil (Ordinary, hard soil & stoney earth soil ) for foundation trenches within 50m. Initial lead and 1.5m initial lift including rough dressing and beaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per specification approved by the department | 460.97 | Cum | 311.5 | ₹1,43,592.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DTCN.pdf
Tender Documents • 8.08 MB
BOQ_610324.xls
BOQ • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .