| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC | ₹5.5 L | 1 | Accepted-AOC AOC |
| 2 | 2₹6.2 L+₹69,310.50 (12.5%)Rejected-Finance | ₹6.2 L+₹69,310.50 (12.5%) | 2 | Rejected-Finance Rejected |
| 3 | 3₹6.3 L+₹75,594.14 (13.7%)Rejected-Finance | ₹6.3 L+₹75,594.14 (13.7%) | 3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical H NO 1209 SHANKAR PURI CHHOTI LINE JAGADHRI 135003 | YAMUNANAGAR | HARYANA | 135003 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.3 L
EMD Value
₹12,500
Closing Date
3 Aug 2026, 5:00 pmClosed
Vikas Dhiman
Municipal Corporation Yamunanagar
Construction of Street and drain from Shrinagar colony Park to Ho Sunil advocate in Shri Nagar colony ward no 02 MC YNR-Jagadhri (FOR L/C SOCIETY LTD)
2026_HRY_537047_1
2026B3065D8D 6668 49FB 8163 C3C9DAA056F1288ULB
Open Tender
Civil Works
Works
115 days
Jagadhari
2 documents required · 2 mandatory
₹1,000
₹12,500
Yes
18 Sept 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 64.05 | cum | 1,863 | ₹1,19,325.15 |
| 1.02 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | 210 | Metre | 160 | ₹33,600 |
| 1.03 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 2 | Each | 1,155 | ₹2,310 |
| 1.04 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 73.15 | cum | 66 | ₹4,827.9 |
| 1.05 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 64.05 | cum | 83 | ₹5,316.15 |
| 1.06 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 64.05 | cum | 78 | ₹4,995.9 |
| 1.07 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 73.16 | cum | 460 | ₹33,653.6 |
| 1.08 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 96.08 | cum | 3,975 | ₹3,81,918 |
| 1.09 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1.17 | cum | 4,374 | ₹5,117.58 |
| 1.1 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 87.75 | Kg. | 66 | ₹5,791.5 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_616190.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .