The Assistant Executive Engineer
Electrical wing (Irrigation) Sub Division, Aluva -683101
Fully Comprehensive Annual Maintenance of Avanamcode 1,Kanjoor and Thiruvilamchuzhy LIS Under Electrical LiftIrrigation Section, Kalady
2022_Irrig_472245_2
128/TR/AEE/21-22
Open Tender
Electrical Works
Item Wise
365 days
Aluva
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹32,100
Yes
11 May 2022
16 Feb 2022
26 Feb 2022
16 Feb 2022
23 Feb 2022
16 Feb 2022
16 Feb 2022 - 19 Feb 2022
Amount
Maintenance of L I Scheme 2020-21 Fully Comprehensive Annual Maintenance of Avanamcode 1 LIS (150 HPSR X 1 No, 120 HPSR x 2 No, 100 HPSR x 1 No, 100 HPSC X 1 No and 5 HP x 2 No)
PART 1 - Overhauling
od17005/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17006/2021_2022/IA : Dismantling the 2.5 - 5HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17007/2021_2022/IA : Dismantling above 110HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17008/2021_2022/IA : Dismantling the 61HP -110HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17009/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
od17010/2021_2022/IA : Lowering down and erecting the Above 110 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17011/2021_2022/IA : Lowering down and erecting the 61- 110 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
PART 2 _ Periodic maintenance
od17012/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17014/2021_2022/IA : Fully Comprehensive Annual Maintenance of above110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17015/2021_2022/IA : Fully Comprehensive Annual Maintenance of 61-110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17017/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 61 - 110 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
PART 3 _ Consumables and supply (SITC within three months of agreement date)
od45450/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45451/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 100 HP motor's fully automatic star delta starter
od45452/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45453/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45454/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 150 HP motor / pump set as per the direction of Departmental staff at site.
od45455/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 120 HP motor / pump set as per the direction of Departmental staff at site.
od45456/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.27 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.25 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.28 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.29 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.40 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
od17001/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
PART 4 - Lifting
od17023/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od17024/2021_2022/IA : Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od17025/2021_2022/IA : Lifting the 61 - 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2020-21 Fully Comprehensive Annual Maintenance of Kanjoor LIS (190 HPSC X 1 No, 160 HPSR x 2 No, 60 HPSC x 1 No and 5 HP x 2 No)
PART 1 - Ovehauling
od17005/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17006/2021_2022/IA : Dismantling the 2.5 - 5HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17007/2021_2022/IA : Dismantling above 110HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17027/2021_2022/IA : Dismantling the 31HP -60HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17009/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
od17010/2021_2022/IA : Lowering down and erecting the Above 110 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17028/2021_2022/IA : Lowering down and erecting the 31- 60 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
PART 2 - Periodic Maintenance
od17012/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17030/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 31 - 60 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve, if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter/soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od17014/2021_2022/IA : Fully Comprehensive Annual Maintenance of above110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17031/2021_2022/IA : Fully Comprehensive Annual Maintenance of above 110 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
PART 3 - Consumables and Supply (SITC within three months of agreement date)
od45519/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45520/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45521/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45522/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 175 HP motor / pump set as per the direction of Departmental staff at site.
od45523/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 2Z C3, SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.25 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.15 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.28 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.30 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.50 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
od17001/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
PART 4 - Lifting
od17023/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od17024/2021_2022/IA : Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od17035/2021_2022/IA : Lifting the 31 - 60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2020-21 Fully Comprehensive Annual Maintenance of Thiruvilamchuzhy LIS (150 HPSC X 1 No, 110 HPSC X 1 No 135 HPSR x 1 No and 5 HP x 1 No)
PART 1 - Ovehauling
od17005/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17006/2021_2022/IA : Dismantling the 2.5 - 5HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od17009/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
od17010/2021_2022/IA : Lowering down and erecting the Above 110 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od17011/2021_2022/IA : Lowering down and erecting the 61- 110 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
PART 2 - Periodic Maintenance
od17012/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od17031/2021_2022/IA : Fully Comprehensive Annual Maintenance of above 110 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od17017/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 61 - 110 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od17014/2021_2022/IA : Fully Comprehensive Annual Maintenance of above110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
PART 3 - Consumables and Supply (SITC within three months of agreement date)
od45561/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45562/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 265 or equivalent suitable for 160 HP motor's fully automatic star delta starter
od45563/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 110 HP motor's fully automatic star delta starter
od45705/2021_2022/IA : Supply & providing Thermal over load relays of FASD Starter (L&T MN 12 / Equivalent make)
od45706/2021_2022/IA : Supply & providing electronic Timer for FASD Starter (L&T ST 100 / Equivalent make)
od45707/2021_2022/IA : Replace the damaged starter regulator contacts and parts & repairing of starterregulator of 100 HP slip ring induction motor oil starter and testing
2.1.8 : Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.400 Amp TP&N
2.2.12 : Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required800 Amp, 50 KA,TPMCCB
od45565/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45566/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45567/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 150 HP motor / pump set as per the direction of Departmental staff at site.
od45568/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 135 HP motor / pump set as per the direction of Departmental staff at site.
od45569/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 120 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.27 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.25 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.28 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
90.14.24.29 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.40 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
od17042/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
PART 4 - Lifting
od17023/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od17024/2021_2022/IA : Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od17025/2021_2022/IA : Lifting the 61 - 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Kittu Electricals private limited
Bidder Name
Kittu Electricals private limited
Edward P J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_681850.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .