Executive Engineer, R & B Division, Surendranagar
S.R. to Prov. Water Proofing Treatment & Anti Termite Treatment in Sir J. High School at Lakhtar (Job No. SNR/SR/NR/2025-26/1)
289525
21 of 2025-2026
Open
Civil Works - Buildings
Lump-sum
Surendranagar
4 documents required · 4 mandatory
₹900
Yes
Executive Engineer, R & B Division, Surendranagar
₹9,000
Yes
24 Mar 2026
24 Mar 2026
24 Mar 2026
9 Apr 2026
24 Mar 2026
Item No. 6 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(A) Loose or soft
Item No. 7 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(B) Dense or Hard
Item No. 8 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
All sorts of soil
Any soil which generally require close application of picks or jumpers or scarifies to
loosen it stiff clay, gravel and stone etc. fall under this category.
1.1. Any soil which generally yields to the application of pickaxes and shovels, phawaras
rakes or any such ordinary excavating implement or organic soil, gravel silt, sand turf
loam, clay, peat etc. fail under this category.
2.0. Clearing the site
2.1. The site on which the structure is to be built shall be cleared, and all obstructions
loose stone, materials and rubbish of all kind bush wood and trees shall be removal
as directed The materials so obtained shall be property of the Government and shall
be conveyed und stacked as directed with all lead. The roots of the trees coming in
the sides shall be cut and coated with a hot asphalt
2.2. The rate of side clearance is deemed to be included in the rate of earth work for
which no extra will be paid.
3.0. Setting out
After clearing the site the centre lines will be given by the Engineer-in-charge. The
contractor shall assume full responsibility for alignment, elevation and dimension of
each and all 'parts of the work. Contractor shall supply labours materials, etc.
required for setting out the reference marks and bench 'marks and shall maintain
them as long as required and directed.
4.0. Excavation
The excavation in foundation shall be carried out in true line and level and shall have
the width and depth as shown in the drawings or as directed. The contractor shall do
the necessary shoring and shutting or providing necessary slopes to a safe angle, at
his own cost. The payment for such precautionary measures shall be paid separately
it not specified. The bottom of the excavated area shall be leveled both longitudinally
and transversely as directed by removing and watering as required no. earth filling
will be allowed for brining it to level, if by mistake or any excavation is made deeper
File : Specification_Sir J High School
or wider than, that shown on the plan or directed. The extra depth or width shall be
made up with concrete of same proportion as specified for the foundation concrete at
the cost of the contractor. The excavation upto 1.5 mt. depth shall be measured
under this item.
5.0. Disposal of the excavated stuff
5.1. The excavated stuff of the selected type shall be used in filling the trenches and
plinth or leveling the ground in layers including ramming and watering etc.
5.2. The balance of the excavated quantity shall be removed by the contractor from the
site of work to a place as directed with lead up to all lead and lift.
6.0. Mode of measurements & payment
6.1. The measurement of excavation in trenches for foundation shall be made according
to the sections of trenches shown on the drawing or as per sections given by the
Engineer-in-charge. No payment shall be made for surplus excavation made in
excess of above requirements or due to stopping and sloping back as found
necessary on account of conditions of soil and requirements of safety.
6.2. The rate shall be for a unit of one cubic meter.
File : Specification_Sir J High School
Item No. 9 Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each disposited
layer by ramming and watering.
1.0 WORKMANSHIP
1.1. The earth to be used for filling shall be free from salts, organic or other
foreign matter all clots of earth shall be broken.
1.2. As soon as the work in foundation has been completed and measured the
site of foundation shall be cleared of all debris brick bats mortar dropping
etc. and filled with earth in layers not exceeding 20 cms. each layer shall
be adequately watered, rammed and consolidated before the succeeding
layer is laid. The earth shall be rammed with iron rammers where feasible
and with the ends of crow-bars, where rammer cannot be used.
1.3 The plinth shall be similarly filled with earth in layers not exceeding 20 cms
adequately watered and consolidated by ramming with iron or wooden
rammers. When filling reaches finished level the surface shall be flooded
with water for at least 24 hours and allowed to dry and then rammed and
1.4 The finished level of filling shall be kept to shape intended to be given to
1.5 In case of large heavy duty flooring like factory flooring, the consolidation
may be done by power rollers, where so specified. The extent of
consolidation required shall also be as specified.
2.0. Mode of Measurements & Payment
2.1. The payment shall be made for filling in plinth and trenches. No deduction
shall be made for shrinkage or voids, if consolidated as instructed above.
2.2. The rate shall be for a unit of one cubic meter.
File : Specification_Sir J High School
Item No. 10 Providing and laying cement concrete 1:4:8 (1- Cement : 4-
coarse sand : 8- hand broken stone aggregates 40 mm nominal
size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to
M-6. Hand broken stone aggregate 40 mm. nominal size shall conform to M-12.
2.0. Workmanship
2.1.1. Before stating concrete the bed of foundation trenches shall be cleared of all
loose materials, leveled, watered and rammed as directed
2.2. Proportion of Mix:
2.2.1. The proportion of cement, sand and stone aggregate shall be one part of cement.
4 parts of coarse sand and 8 parts of hand broken stone aggregates and shall be
measured by volume.
2.3.1. The concrete shall be mixed in a mechanical mixer at the site of work. Hand
mixing may however be allowed for smaller quantity of work if approved by the
Engineer-in-charge. When hand mixing is permitted by the Engineer-in-charge in
case of break-down of machineries and in the interest of the work, it shall be
carried out on a water tight platform and care shall be taken to ensure that mixing
is continued until the mass is uniform in colour and consistency, However in such
case 10% more cement than otherwise period 1 1/2 to 2 minutes. The quantity of
water shall be just sufficient to produce a dense concrete of required workability
for the purpose.
2.4. Transporting & Placing the Concrete:
2.4.1. The concrete shall be handed from the place, of mixing to the final position in not
more than 15 minutes by the method as directed and shall be placed into its final-
position, compacted and finished within 30 minutes of mixing with water i.e.
before the setting commences.
2.4.2. The concrete shall be laid in layers of 15 cms. to 20 cms.
2.5.1. The concrete shall be rammed with heavy iron rammers and rapidly to get the
required compaction and to allow ail the interstices to be filled with mortar.
2.6.1. After the final set, the concrete shall be kept continuously wet if required by
pounding for a period of not less then 7 days form the date of placement.
File : Specification_Sir J High School
3.0. Mode of measurement and payment
3.1. The concrete shall be measured for its length, breadth and depth, limiting
dimensions to those specified on plans or as directed
3.2. The rate shall be for a unit of one cubic meter.
File : Specification_Sir J High School
Item No. 11 Providing and laying cement concrete 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size)
and curing complete excluding cost of formwork and
reinforced concrete work in (A) Foundation and Plinth
Item No. 12 Providing and laying ordinary cement concrete 1:2:4 (1-
Cement : 2-Coarse Sand : 4-Graded stone Aggregate 20mm
nominal size and curing complete excluding the cost of
formwork and reinforced concrete work in (B) Lintel, Beam,
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Grit shall conform to M-8. Graded stone aggregate 20 mm nominal size shall conform to
(a) The bars shall be kept in position by the following methods :
(i) In case of beam and slab construction, sufficient number of precast cover blocks in
cement mortar 1:2 (1 cement : 2 coarse sand) about 4 cms. x 4 cms. section and of
thickness equal to the specified cover shall be placed between the bars and shattering as
to secure and maintain the requisite cover of concrete over the reinforcement. In case of
cantilevered or doubly reinforce beams or slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meter centers.
1.2. All bars projecting form pillars, columns, beams, slabs etc, to which other bars and
concrete are to be attached of bounded to later on, shall be protected with a coat of thin
neat cement grout, if the bars are not likely to be incorporated with succeeding mass of
concrete within the following 10 days. This coat of thin neat cement shall be removed
before concreting.
1.3. The shuttering to be provided shall be of ordinary timber plank and shall conform to M-26.
1.4. The dimensions of scantlings and battens shall conform to the design. The strength of the
wood shall not be less than that assumed in the design.
2.1. The concrete mix is not required to be designed by preliminary testes. The proportion of
the concrete mix shall be 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm. nominal size) by volume concrete work shall have exposed concrete surface or as
specified in the item.
2.2. The designation ordinary M-100, M-150m M-200, M-250 specified as per I.S. corresponds
approximately to 1:3:6, 1.2:4, 1:1:1/2:3 and 1:1:2 nominal mix of ordinary concrete by
volume respectively.
2.3. The ingredients required for ordinary concrete containing one beg of cement of 50 kg. by
weight (0.0342 Cu.M.) for different proportions of mix shall be as under:
Grade of Mix by Total quantity of dry aggregates Proportion of fine Quantity of
concrete volume by volume per 50 kg. cement to aggregate to coarse water per
be taken as sum aggregate of the aggregate kg. of
individual volumes of fine & cement max.
coarse aggregates, maximum
(1 cubic metre : 1000 Liters)
Ordinary Liters Liters
M-100 1:3:6 300 Generally 1:2 for fine
M-150 1:2:4 220 Coarse aggregate by
M-200 1:1.1/2:3 160 volume but subject to a
upper limit of 1:1.1/1 &
M-250 1:1:2 100 a lower limit of 1:3.
File : Specification_Sir J High School
2.4. The water cement ratios shall not be more than specified in the above table. The cement
content of the mix specified in the table shall be increased if the quantity of water in mix
has to be met eased to overcome the difficulties of placements and compaction so that
the water-cement ratio specified in the table is not exceeded.
2.5. Workability of the concrete shall be controlled by maintaining a water cement-ratio that is
found to give a concrete mix which is just sufficient wet to be placed and compacted
without difficulty with the means available.
2.6. The maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than one forth of the minimum thickness of the member
provided that the concrete can be placed without difficulty so as to surround all
reinforcement thoroughly and to fill the corners of the form.
2.7. For reinforced concrete work; coarse aggregates having a nominal size of 20 mm. are
generally considered satisfactory.
2.8. For heavily reinforced concrete members as in the case of ribs of main beams, the
nominal maximum size of coarse aggregate should usually be restricted to 5 mm. less
than the minimum clear distance between the main bar or 5 mm. less than the minimum
cover to the reinforcement whichever is smaller.
2.9. Where the reinforcement is widely spaced as in solid slabs, limitations of size of the
aggregate may not be so important, and the nominal maximum size may some times be
as great as or greater than the minimum cover.
2.10. Admixture maybe used in concrete only with approval of Engineer-in-charge based upon
the evidence that with the passage of time neither the compressive strength of concrete is
reduced not are other requisite qualities of concrete and steel impaired by the use of such
3.0. Workmanship
3.1. Proportioning : Proportioning shall be done by volume, except which shall be measured
in terms of bags of 50 kg. weight, the volume of one such bag being taken as 0.0342 cu.
meter Boxes of suitable size shall be used for measuring sand aggregate. The size of
boxes (internal) shall be 35 x 25 cms. and 40 cms deep while measuring the aggregate
and sand the boxes shall be filled without shaking ramming or hammering. The
proportioning of sand shall be on the basis of its dry volume and in case of damp saner,
allowances for bulk age shall be made.
3.2.1. For all work, concrete shall be mixed in a mechanical mixed which along with other
accessories shall be kept in first class working condition and so maintained throughout
the construction Measured quantity of aggregate, sand and cement required for each
batch shall be poured into the claim of the mechanical mixer while it is continuously
running. After half a minute of dry mixing measured quantity of water required for each
batch of concrete mix shall be added gradually and mixing continued for another one and
a half minute Mixing shall be continued till materials are uniformly distributed and uniform
colour of the entire mass is obtained and each individual particle of the coarse aggregate
shows complete coating of mortar containing its proportionate amount of cement. In no
case shall the mixing he done for less than 2 minutes after-oil ingredients have been put
into the mixer.
3.2.2. When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain
other reasons, it shall be done on the smooth watertight platform large enough to allow
efficient tuning over the ingredients of concrete before and after adding water Mixing
platform shall be so arranged that no foreign malarial gets mixed with concrete nor does
the mixing water flow out. Cement in required number of bags shall be spread in n layer
of uniform thickness on the mixing platform. Dry coarse and fine aggregate and cement
shall then be mixed thoroughly be turning over to get a mixture to uniform colour.
Specified quantity water shall then be added gradually through a rose can and the mass
turned over till a mix of required consistency is obtained. In hand mixing quantity of
cement shall be increased by 10 percent above that specified.
3.2.3. Mixers which haw been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer in-charge the
first batch of concrete from the mixture shall contain only two thirds of normal quantity of
coarse aggregate Mixing plant shall be thoroughly cleaned before changing from one type
of cement to another.
3.2.4. The form work shall conform to the shape lines and dimensions as shown on the plans
and be constructed as to remain sufficiently rigid during the placing and compacting of the
concrete. Adequate arrangements shall be made by the contractor toe safe-guard against
File : Specification_Sir J High School
any settlement of the form-work during the course of concreting and after concreting. The
form work of shuttering, centering, scaffolding, bracing etc. shall be as per design.
3.3. Clearing and Treatment of forms:
3.3.1 All rubbish, particularly chipping shaving and saw dust shall be removed from the interior
of the form before the concrete work is placed and the-form in contact with concrete shall
be cleaned and thoroughly wetted or treated. The surface shall be then coated with soap
solution applied before concreting is done. Soap solution for the purpose shaft prepared
by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of raw
linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that
the coating does not get on construction joint surface and reinforced bars.
4.0 Stripping time:
4.1. In normal circumstances and where ordinary cement is used forms may be struck after
expire of following periods.
(a) Sides of walls columns and vertical faces of beams………………………24 to 48 hours.
(b) Beam soffits, (props, left under)……………………………………..………7 days.
(c) Removal of props slabs:
(i) Slabs spanning up to 4.5. m……………………………………………………7 days.
(ii) Spanning over 4.5 mm………………………………………………………..14 days.
(d) Removal of props t beams and Arches:
(i) Spanning up to 6 mm…………………...……………………………………..14 days.
(ii) Spanning over 6 m…………………………………………………………….21 days.
5.0 Procedure when removing the form work :
5.1. All form work shall be removed without such shock or vibrations as would damage the
reinforced concrete surface. Before the soffits form work and struts are removed, the
soffits and the concrete surface shall be exposed where necessary in order to ascertain
that the concrete has sufficiently hardened.
6.1. The centering to be provided shall be got approved. It shall be sufficiently strong to
ensure absolute safety of the form work and concrete work before, during and after
pouring concrete. Watch should be kept to see that behavior or centering and form work
is satisfactory during concreting. Erection should also he such that it would allow removal
of forms in proper sequence without damaging either the concrete or the forms to be
6.2. The props of centering shall be provided on firm foundation or base of sufficient strength
to carry the loads without any settlement.
6.3. The centering and form work shall, be inspected and approved by the Engineer-in-charge
before concreting. But this will not relieve the contractor of his responsibility for strength,
adequacy and safety of form work and centering. If there is a failure of form work or
centering, contractor shall be responsible for the damages to property.
7.0 Scaffolding:
7.1. All scaffolding, hoisting arrangements and ladders etc. required for the facilitating of
conceding shall be provided and removed on completion of work by contractor at his own
expense. The scaffolding, hoisting arrangements and ladders etc. shall be strong enough
to with sand all live, dead and impact loads expected to act and shall be subject to the
approval of the Engineer-in-charge. However contractor shall be solely responsible for the
safety of the scaffolding, hoisting arrangement, ladders, work and workman etc.
7.2. The scaffolding, hoisting arrangements and ladder shall allow easy approach to the work
spot and afford easy inspection.
7.3. The rate is applicable to all condition of working and height up to 4 mts. The rate shall
include the cost of materials and labour for various operations involved such as :
(a) Splayed edges, notching, allowance for overlaps and passing at angles, battens
centering, shuttering propping, bolting, wedging easing, striking and removal.
(b) Filleting to form stop chamfered edges or splayed external angles not exceeding
20 mm: width to beams, columns and the like.
(c) Temporary openings in the forms for pouring concrete, if required removing
(d) Dressing with oil to prevent adhesion of concrete with shuttering and.
(e) Raking or circular cutting.
8.1. Before re-use, all from shall be inspected by Engineer-in-charge and their suitability
ascertained. The forms shall be scarred, cleaned and joints are gone over, repaired
where required. Inside surface shall be retreated to prevent adhesion of concrete.
9.0. Consistency:
File : Specification_Sir J High School
9.1. The degree of consistency which shall depend upon the nature of the work and methods
of vibration of concrete shall be determined by regular slump tests in accordance with I.S.
1199-193. The skimp of 10 mm. to 25 mm shall be adopted when vibrators are used and
80 mm. when vibrators are not used.
9.2. Inspection:
9.2.1. Contractor shall give the Engineer-in-charge due notice before placing any concrete in
the forms to permit him to inspect and accept the false work and forms as to their
strength, alignment and general fitness but such inspection shall not relieve the contractor
of his responsibility for the safely of men machinery materials and for results obtained
immediately before concreting all forms shall be thoroughly cleaned.
9.2.2. Centering design and its erection shall be got approved from the engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of concreting.
Movement of labour and other persons shall be totally prohibited for reinforcement laid in
position. For access to different parts suitable mobile platforms shall be provided so that
steel reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks
of suitable size shall be cast and tied to the reinforcement. Timber kapachi or metal
pieces shall not be used for this purpose.
9.3. Transporting and laying:
9.3.1. The method of transporting and placing concrete shall be as approved. Concrete shall be
so transported and placed that no contamination, segregation or loss of its constituent
material takes place. All from work shall be cleaned and made free from standing water
dust, show or ice immediately before placing of concrete. No concrete shall be placed in
any part of the structure until the approval of the engineer-in-charge has been obtained.
9.3.2. Concreting shall proceed continuously over the area between construction joints. Fresh
concrete proper contraction joint is formed. Concrete shall be compacted in its final
position within 30 minutes of its discharge from the mixer. Except where otherwise agreed
to by the engineer-in-charge, concrete shall be deposited in horizontal layers to a
compacted depth of not more than 0.45 meter when internal vibrators are used and not
exceeding 0.30 meter in all other cases.
9.3.3. Unless otherwise agreed to by the Engineer-in-charge concrete shall be dropped in to
place from a height exceeding 2 meters. When trucking or chutes are used they shall be
kept close and used in such a way as to avoid segregation. When concreting has to be
resumed on a surface which has hardened, it shall be roughened, swept clean,
thoroughly wetted and covered with a 13 mm. thick layer of mortar composed of cement
and sand in the same ratio as in the concrete mix itself. This 13 mm. layer of mortar shall
be freshly mixed and placed immediately before placing of new concrete. Where concrete
has not fully hardened, all lateness shall be removed by scrubbing the wet surface with
wire or bristle brushes, care being taken to avoid dislodgement of any particles of coarse
aggregate. The surface shall then be thoroughly wetted, all free water removed and then
coated with neat cement grout. The first layer of concrete to be placed on this surface
shall not exceed 150 mm. in thickness and shall be well rammed against old work,
particular attention being given to corners and close spots.
9.3.4. All concrete shall be compacted to produce a dense homogeneous mass with the
assistance of vibrators, unless otherwise permitted by the Engineer-in-charge for
exceptional cases, such as concreting under water, where vibrators cannot be used.
Sufficient vibrators in serviceable condition shall be kept at site so that spare equipment is
always available in the even of breakdowns. Concrete shall be judged to be compacted
when the mortar fills the spaces between the coarse aggregate and begins to cream up to
form an even surface. Compaction shall be completed before the initial setting stats i.e.
within 30 minutes of addition of water to dry mixture. During compaction, it shall be
observed that needle vibrators are not applied on reinforcement which is likely to destroy
the bond between concrete and reinforcement.
Immediately after compaction, concrete weather including rain, running water, shocks,
vibration, traffic, rapid temperature charges, frost and drying out process. It shall be
covered with wet sacking has Sian or other similar absorbent material approved, soon
File : Specification_Sir J High School
after the initial set, and shall be kept continuously wet for a period of not less than
days from the date of placement. Masonry work over foundation concrete may be started
after 48 hours of its laying but curing of concrete shall be continued for a minimum period
9.5. Sampling and testing of concrete:
9.5.1. Samples from fresh concrete shall betaken as per I.S. 1199-1959 and cubes shall be
made, cured and tested at 7 days of 28 days as per requirements in accordance with I.S.
526-1959. A random sampling procedure shall be adopted to ensure that each concrete
batch shall have a reasonable chance of being tested i.e. the sampling should be spread
over the entire period of concreting and cover all mixing units. The minimum frequency of
sampling of concrete of each grade shall be in accordance with following :
Quantity of concrete No of samples Quantity of concrete No of samples
in the work in the works
51 and above 4± one additional for each additional 50 mm. or part
Note : At least one simple shall be taken from each shift, Ten test specimens shall be made from
each sample, five for testing at 7 days and the remaining five at 28 days. The samples of
concrete shall be taken on each day of concreting as per above frequency. The number
of specimens may be suitably increased as deemed necessary by the Engineer-in-charge
when procedure of tests given above reveals a poor quality of concrete and in other
9.5.2. The average of the group of cubes cast for each day shall not be less than the specified
cube strength of 150 K/g Cm2 at 28 days. 20% of the cubes cast for each day may have
value less than the specified strength provided the lowest value is not less than 85% of
the specified strength. If the concrete made in accordance with the proportions given for a
particular grade does not yield the specified strength, such concrete shall be classified as
belonging to the appropriate lower grade. Concrete made in accordance with the
Proportions given for a particular grade shall not, however be placed in a higher grade on
the ground that the test strength are higher then the minimum specified.
9.6. Stripping :
9.6.1. The Engineer-in-charge shall be informed in advance by the contractor of hr> intention to
strike the form work. While fixing the time of removal of form work, due consideration shall
be given to local conditions, character of the structure, the weather and other conditions
that influence the setting of concrete and of the materials used in the mix. In normal
circumstances (generally where temperatures are above 20.C) and where ordinary
concrete is used, forms may be struck after expire or periods specified in item No.9.1 (A)
for respective item of form work.
9.6.2. All form work shall be removed without causing any shock or vibration as would damage
the concrete. Before the soft and struts are removed, the concrete surface shall be
gradually exposed, where necessary in order to ascertain that concrete has sufficiently
hardened. Centering shall be gradually and uniformly lowered in such a manner as to
permit the concrete to take stresses due to its own weight uniformly and gradually. Where
internal metal tiles are permitted, they or their removable parts shall be extracted without
causing any damage to the concrete and remaining holes filled with mortar. No
permanently embedded metal part shall have less than 25 mm. cover to the finished
concrete surface. Where it is intended to re-use the form work, it shall be cleaned and
made good to the satisfaction of the Engineer-in-charge. After removal of form work and
shutting, the Executive Engineer shall inspect the work and satisfy by random checks that
concrete produced is of good quality.
9.6.3. Immediately after the removal of forms, all exposed bolts etc. passing through the cement
concrete member and used for stuttering or any other purpose shall be cut inside the
cement concrete member to a depth of at least 25 m. below the surface of the concrete
and the resulting holes be filled by cement mortar, all fins, caused by form joints, all
cavities produced by the removal of form tiles and all other holes and depressions,
File : Specification_Sir J High School
honeycomb spots, broken edges or comers and other defects, shall be thoroughly
cleaned", saturated with water and carefully pointed an rendered true with mortar of
cement and fine aggregate mixed in proportions used in the grade of concrete that is
being furnished and of as dry consistency as is possible to use. Considerable pressure
shall be applied in filling and pointing to ensure through filling in all voids. Surface which
are pointed shall be kept moist for a period of 24 hours. If rock pockets/honeycombs in
the opinion of the Engineer-in-charge are of such an extent or character as to effect the
strength of the structure materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the
portions of structure affected.
10.0. Mode of Measurement & Payment
10.1. The consolidated cubical contents of concrete work as specified in item shall be
measured. No deduction shall be made for
(a) Ends of dissimilar materials such as joints, beams, posts, girders, falters, purling
trusses, corbels and steps etc. up to 500 Sq, Cm. in section.
10.2. Form work shall be measured as the area in square meters to shuttering in contract with
concrete except in the case of inclined member and portion of curved profile and upper
side in which case on area of underside shall be measured for payment.
10.3. Form work to secondary beams shall be measured up to the sides of main beams but no
deduction shall be made form the form work of the main beam at the inter section point.
No deduction shall be made form the form work of a column at inter section of beams.
10.4. The rate includes cost of all materials labour, tools and plant required for mixing, placing
in position, vibrating and compacting, finishing, as directed, curing and all other incidental
expenses for producing centre of specified strength. The rate excludes the cost of form
10.5. The volume occupied by reinforcement shall not be deducted from R.C.C. work.
10.6. The rate shall be for a unit of one cubic meter.
File : Specification_Sir J High School
Item No. 13 Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation
and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(B)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to
M-6. Bricks shall conform to M-15. Cement mortar shall conform to M-11.
2.0. Workmanship
2.1. Proportion:
2.1.1. The proportion of the cement mortar shall be 1:5 (1 cement : 5-fine sand) by
2.2. Wetting of bricks:
2.2.1. The bricks required for masonry shall be thoroughly wetted with clean water for
about two hours before use or as directed. The cessation of bubbles, when the
bricks are wetted with water is as indication of through wetting of bricks.
2.3.1. Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks
shall not be used except when necessary to complete to bond; closures in such
case shall be cut to required size and used near the ends of walls.
2.3.2. A layer of mortar shall be spread on full width for suitable length of the lower
course. Each brick shall first be property bedded and set home by gently tapping
with handle of trowel or wooden mallet. Its inside face shall be flushed with mortar
before the next brick is laid and pressed against it. On completion of course, the
vertical joints shall be fully filled from the top with mortar.
2.3.3. The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal
and all vertical joint shall be truly vertical. Vertical joints in alternate course shall
generally be directly one over the other. The thickness of brick course shall be
2.3.4. The brick shall be laid with frog up wards. A set of tools comprising of wooden
straight edges, man son's spirit level, square half meter rub, and pins, string and
plumb shall be kept on the site of work for frequent checking during the progress
2.3.5. Both the faces of walls of thickness greater than 23 cms. shall be kept in proper
place. All the connected brick work shall be kept not more than one meter over
the rest of the work. Where this is not possible, the work shall be raked back
according to bond (and not left toothed) at an angle not steeper than 45 degrees.
2.3.6. All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are
required to be built in wall shall be embedded in cement mortar.
File : Specification_Sir J High School
2.4.1. Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints
shall not exposed 12 mm. The face joints shall be raked out as directed by raking
tools daily during the progress of work, when the mortar is still green so as to
provide key for plaster or pointing to done.
2.4.2. The face of brick shall be cleaned the very day on which the work is laid and all
mortar dropping removed.
2.5.1. Green work shall be protected from rain suitably. Masonry work shall be kept
moist on all the faces for a period of seven days. The top of masonry work shall
be kept well wetted at the close of the day.
2.6. Preparation of foundation bed:
2.6.1. If the foundation is to be laid directly on the excavated bed, the shall be leveled,
cleared of all loose materials, cleaned and wetted before stating masonry, If
masonry is to be laid on concrete footing, the top of concrete shall be cleaned
and moistened. The contractor shall obtain the engineer's approval for the
foundation bed before foundation masonry is started. When pucca flooring is to
be provided flush with the top to plinth, the inside plinth offset shall be kept lower
than the outside plinth top by the thickness of the flooring.
3.0. Mode of measurements & payment
3.1. The measurements of this item shall be taken for the brick masonry fully
completed in foundation up to plinth. The limiting dimensions not exceeding those
shown on the plinths or as directed shall be final. Battered tapered and curved
portions shall be measured net.
3.2. No deduction shall be made from quantity of brick work nor any extra payment
made for embedding in masonry of marking holes in respect of following item.
(1) Ends of joints, beams, posts, girders, rafters, purlins trusses corbel, steps, etc.
where cross sectional area does not exceed 500 sq.cm.
(2) Opening not exceed in 1000 sq.cm.
(3) Wall plate sand bed plates bearing of slab, chhajjas and like whose thickness
does not exceed 10 cms. and the bearing does not extend the full thickness of
(4) Drainage holes and recesses for cement concrete blocks to embed hold fasts
for doors, window etc.
(5) Iron fixtures, pipes up to 300 mm. dia. hold fasts of doors, and window built
into masonry and pipes etc. for concealed wiring.
(6) Forming charges of section not exceeding 350 sq.cm. in masonry.
File : Specification_Sir J High School
3.3 Apparatuses for fire places shall not be deducted nor shall extra labour required
to make splaying of jumps, throating and making trenches over the aperture be
paid for separately.
3.4. The rate shall be for a unit of one cubic meter.
File : Specification_Sir J High School
Item No. 14 Providing laying and jointing in true line and level 32mm dia.
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings as
approved by Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two metre C/C or shall be
concealed as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.
1.1. The pipes shall be standard I.S.I. mark U.P.V.C. pipe (SCH-40) of specified dia.
1.2. The fittings, clamps etc. required for specified dia. bore pipes shall be of best
quality and makes as approved by the Engineer-in-charge. Necessary
accessories with inner/ outer brass thread shall be used as required and
instruction by Engineer in charge.
2.0. Workmanship
2.1. Cutting, Laying & Jointing
2.1.1. When the tubes are to be cut or rethreaded, the ends shall be carefully filed out
so that no obstruction to bore in offered. The ends of the tubes shall then be
threaded conforming to the requirements of I.S. 554-1955 with pipe dies and taps
carefully in such a manner that it will not result in slackness of joints when the two
pieces are screwed together.
2.1.2. The taps and dies shall be used only for straightening screw threads which have
becoming bent or damaged and shall not be used for turning of the threads so as
to make them slack as the latter procedure may not result in the water tight joint.
The screw threads for tube and fitting shall be protected form edge until they are
2.1.3. In jointing the tubes, the inside of the socket and the screwed end of the tubes
shall be oiled and smeared with white or red lead and wrapping around with a few
turns of fine spun yarn round the screwed end of the tube. The end shall then be
tightly screwed in the socket, tees, etc. with a pipe wrench. Care shall be taken
that all times free from dust and dirt during fixing. But from the joints shall be
removed after screwing. After laying the open ends of the pipes shall be
temperately plugged to prevent access of water, soil, or any other foreign matter.
Jointing shall be carried out with proper chemical adhesive material and allow to
2.1.4. Any threads exposed after jointing shall be painted or in the case of underground
piping thickly coated with approved anti-corrosive paint to prevent corrosion.
2.2. Fixing concealed to wall, ceiling & floors.
File : Specification_Sir J High School
2.2.1. In case of fixing concealed cement point to walls or ceilings, these shall run on
the surface of the wall, or ceiling (not in chase) unless otherwise specified. The
fixing shall be done by means of standard pattern, holder clamps keeping the
pipes about 15 mm. clear of the wall. When it is found necessary to pattern,
holder clamps keeping the pipes about 15 mm. clear of the wall. When it is found
necessary to conceal the pipes and when specified so, chasing may be adopted
or pipe fixed inducts or recesses etc. provided that there is sufficient space to
work on the pipe with usual tools. The pipe shall not ordinarily be buried in walls
or solid floors, where unavoidable, pipe may be buried for short distances
provided that adequate protection is given against damage and where so
required joints are not buried. Where required M.S. tube sleeve shall be fixed at a
place a pipe is peasant through a wall or floor for expansion and contraction and
other movements. In case the pipe is embedded in walls or floors, it should be
painted with anti-corrosive bitumastic paint of approved quality. The pipe should
not come in contact with lime mortar or lime concrete as the pipe is affected by
lime. Under the floors, the pipe shall be laid in layer of sand filling.
2.2.2. All pipes and fittings shall be fixed truly vertical and horizontal unless
unavoidable. The pipes shall be fixed to walls with standard pattern clamps of
required size and shape, one end of which shall be properly plugged or cemented
into walls with cement mortar 1:3 (1 cement : 3 coarse sand) and the other
tightened round the pipes to hold it securely. These clamps shall be spaced at
regular intervals in straight lengths at 2 MC/C interval in horizontal run and 2.5 m.
interval in vertical run. For pipe of 15 mm. dia. up to 25 mm. dia the holes in the
walls and floors shall be made by drilling with chisel or jumper and not by
dismantling the brick work or concrete. However for bigger diameter pipes the
holes shall be carefully made (1 cement : 3 coarse sand), and properly finished to
match the adjacent surface.
2.3. Testing of joints :
2.3.1. After laying and jointing, the pipes and fillings shall be inspected under working
conditions of pressure and flow. Any joints found liken shall be redone, and ail
leaking pipes removed and replaced without extra cost.
2.3.2. The pipes and fittings after they are laid shall be tested to hydraulic pressure of
Kg./Sq cm. The pipe shall be slowly and carefully charged with water allowing all
air to escape and avoiding all shocks and water hammer. The draw off takes and
stop cock shall then be closed and specified hydraulic pressure shall be applied
gradually. The pressure gauge must be accurate. The pipes and fittings shall be
tested in sections as the work laying proceeds, keeping, the joints exposed for
inspection during the testing.
File : Specification_Sir J High School
3.0. Mode of measurements and payment
3.1. The description of the item shall, unless otherwise stated be held to include
where necessary conveyance and delivery, handling, unloading, storing
fabrication, hoisting, all labour for finishing to required shape and size, setting,
fitting in position straight, cutting and waste return of packing etc.
3.2. The length shall be measured on running meter basis of finished work. The
length shall be taken along the centre line of the pipe and fittings. The pipes fixed
to wall, ceiling. floors etc shall be measured and paid under this item.
3.3. All the work shall be measured in decimal system as fixed in its place, subject to
tolerance given below unless otherwise stated.
(i) Dimension shall be measured to the nearest 0 01 meter.
(ii) Area shall be worked out to the nearest 0.01 sq. meter.
3.4. All measurements of cutting shall unless otherwise stated by held to include the
consequent waste.
3.5. In case of fitting of unequal bore, the targets bore shall be measured for the test.
3.6. Testing of pipe lines fittings, and joints include for providing all plant appliances
necessary for obtaining access to the work to be tested an carrying out the tests.
3.7. The rate includes U.P.V.C. pipe (SCH-40) with screwed socket joints to gather
with all fittings (such as bends, sockets springs, elbows, test, crosses, short
pieces, clamps and plugs, unions etc.) and fixing complete with clamping wall
hooks, wooden plug etc. and also curing, screwing and waste and for making
forged (or hand made) bends on piping as required. Connector shall be inserted
where required or directed. The rate also includes cutting through walls, floors
etc. and their making good and painting exposed threads with anti-corrosive paint
as above and testing where tubes are to be fixed to wall, ceiling and flooring, the
rates shall not include painting of pipes, providing sleeves and sand filling under
floor for which separate payment shall be made.
3.8. The rate shall be for a unit of one running meter.
File : Specification_Sir J High School
Item No. 15 Providing and fixing Flat Back Wash Basin 550mm x 400mm
size white in colour with single hole for pillar trap with CI or
MS brackets painted with including cutting holes and making
good the same including providing and fixing C.P. Brass Waste
1.0. Materials :
1.1. The white glazed earthenware wash basin shall be 550 mm. x 400 mm.of 1st
quality and make as approved by the Engineer-in-charge. The wash basin shall be
conform to M-59.
The 32 mm. dia. M.I. Fisher union shall be of best quality and the C.P. brass waste
trap and unions shall be of 32 mm. dia. and best quality and make as approved by
the Engineer-in-charge.
The capsten head pillar tap of specified dia. Of C. P. over brass shall be of best
quality and shall conform to I. S. 1795-1961. The pillar taps shall be of tested
The Stop / Angle cock shall be of specified dia of C.P. Over brass having best
quality and shall conform to IS. : 781 -1984.
2.0. Workmanship :
2.1. The wash basin shall be fixed on the wall as and where directed. The wash basin
shall be supported on a pair of M.S. or C.I. brackets fixed in C.M. 1:3 (1 cement :
3 sand). The bracket shall conform to I.S. 775-1962. The wall plaster on the rear
shall be cut to rest the top edge of the wash basin. After fixing the basin, plaster
shall be made good and surface finished to match with the existing one.
The 32 mm. dia. M.I. Fisher union shall be fixed to wash basin or sink in best
workman like manner. C.P. brass waste trap and union shall be connected to
mm. dia. waste pipe which shall be suitably bent towards the wall and which shall
discharge into drain through a floor trap. The C.P. brass waste trap shall be
provided for wash basin or sink as the case may be.
The capstan head pillar tap / Stop Cock / Angle Cock of specified dia. shall be
fixed as directed with required washer of selected leather or rubber asbestos
composition or of plastic as direct. The cock shall fixed with pipe line with white
zinc end spun yarn to make joint water height. The work shall be carried out in
best workman like manner.
2.2. The bracket shall be painted white with ready-mixed paint.
2.3. The C.I. brass trap and union shall be connected to 32 mm. dia. waste pipe which
shall be suitably bent towards the wall and which shall discharge into an open
File : Specification_Sir J High School
drain leading to a gully trap or direct into the gully trap on the ground floor and
shall be connected to a waste pipe through a floor trap on the upper floors. C.P.
brass trap and union may not be provided where the surface drain or floor trap
placed basin and waste is discharged into vertically.
2.4. The height of the frond edge of the wash basin from the floor level shall be
2.5. The necessary inlet, outlet connections and fittings and as pillar cocks. C.P. dress
waste trap pipe, stop cock, chain wish rubber plug etc. shall be fixed.
2.6. The payment of fittings shall be made separately under separate item.
3.0. Mode of measurements & payment :
3.1. The rate includes the cost of all labour and materials, including supply pipe, waste
pipe, pillar tap, angle cock and fittings involved in the operations described under
workmanship including testing.
3.2. The rate shall be for a unit of one number.
File : Specification_Sir J High School
Item No. 16 Providing corrugated G.I. sheet of class-3 roofing fixed with
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter
with bitumen and G.I. limpet washer or G.I. limpet washer.
filled with white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet.
1.0. Materials :
1.1. Asbestos cement sheets shall conform to M-24.
2.0. Workmanship
2.1. Spacing of purlins : One purlin shall be provided at the ridge and one at the
eaves. The spacing of other purlins for 0.8 mm. thick G.I. sheets shall not exceed
1.80 meters. The purline shall coincide with the centre line of the end lap. The
ridge purlines shall be placed in such a way that the ridges can be fixed properly.
The portion overhanging the wall support shall not be more than one fourth of the
spacing of purlins.
2.2. The top surfaces of the purlines shall be painted before the sheets are fixed over
them. Embedded portions of purlins shall be finished with tow coats of coal tar.
2.3. Laying & fixing of Sheets
2.3.1. The sheets shall be laid in purlins to a true plane with the line of corrugations truly
parallel or normal to the sides of area to be covered. The sheets shall not
generally be built into gables and parapets. They shall be bent up along their side
edges close to the wall, and the junction shall be protected by suitable flushing or
by projecting drip course.
2.3.2 The laps at end shall be provided 150 mm. minimum for roof slopes 1 in 2 (1
vertical : two horizontal) and steeper but 200 mm. shall be provided for flatter
slopes than those above. The side lap shall be provided two ridges of
corrugations at each side.
2.3.3. The sheets shall be cut to the dimensions or the shape of the roof either along
their lengths or their width or in slant across the line of corrugations at hips and
valleys. The sheets shall be cut carefully with a straight edge and chisel to give
straight finish. The sheets shall be laid such that the laps are turned away from
the usual direction of local heavy rain.
2.3.4. Fixing of sheets :
2.3.4.1. Sheets shall be fixed to the purlins or other roof members such as hips or valley
rafter etc. with 'J' or 'L' galvanized hook bolts, and galvanized nuts 8 mm. dia.
with bitumen limpet washers and G.I. washers. Limpet washers with white lead
shall be used. Length of hook bolt shall be varied to suit the site requirement.
Bolts shall be sufficiently long so that after fixing the project above the top of their
nuts by not less than 12 mm the grip of 'J' or 'L' book bolts on the sides of purlins
File : Specification_Sir J High School
shall not be less than 25 mm. There shall be minimum of three hooks bolts
placed at the ridge of corrugations in each sheet in every purlin and their spacing
shall not exceed 300 mm. Coach screw shall not be used for fixing the sheets to
purlin, where the slopes of roof are not less than 2.1/2 degree (1 vertical and
2.1/2 horizontal). Sheets shall be jointed together at the side laps by galvanized
iron boils and nuts 25 mm. x 6 mm. size each bolt with a bitumen and G.I. limpet
washer filled with white lead. Where the overlaps at the sides extend to two
corrugations, these bolts shall be placed zigzag over lapping corrugations, so that
the ends of the overlapping sheets are drawn tightly towards each other. The
spacing of same bolts shall not exceed 600 mm. along each of the staggered
2.3.5. Holes for all bolts shall be drilled and not punched in the ridges of the
corrugations from the under side, while the sheets are on the ground. The holes
in the sheets shall be at least 50 mm. from the edge. Sheets drilled wrongly shall
be rejected. The holes in the washers shall be of the exact diameter of the hook
bolts or the beam bolts. The nuts shall be tightened from above to give a leak-
3.0. Mode of measurement & payment
3.1. The measurements of the C.G.L sheet roof shall be taken for finished work in
superficial area in general plane (not girthed on the roof). The laps between the
C.G.I. Sheets both at their ends and along the side edges shall not be measured.
The overlaps of C.G.I. sheets over the valley piece and their under lap under the
ridge, hip and flashing piece shall be included in the measurements.
3.2. No deductions in measurements shall be made for openings for chimney stacks,
sky light etc. of area up to 0.40 sq.mt. nor extra be paid for labour in cutting and
for wastage etc. in forming such openings.
3.3. The rate of roof shall include the cost of all materials and labour involved in all
operations described above.
The rate also includes the cost of provision, erection and removal of the
scaffolding, benching, ladders, templates and tools required for the proper
execution and erection of the work. The rate includes the cost of purlins, rafters
3.4. The rate shall be for a unit of one sq. meter.
File : Specification_Sir J High School
Item No. 17 Providing and fixing to wall, ceiling and floor galvanised Mild
steel tubes (Medium grade) of the following nominal bore, tube
fitting and clamps including making good the wall ceiling and
1.1. Galvanized mild steel tubes of specified dia. nominal bore shall conform to I.S.
1.2. The galvanized fittings, clamps etc. required for specified dia. bore pipes shall be
of best quality and makes as approved by the Engineer-in-charge.
2.0. Workmanship
2.1. Cutting, Laying & Jointing
2.1.1. When the tubes are to be cut or rethreaded, the ends shall be carefully filed out
so that no obstruction to bore in offered. The ends of the tubes shall then be
threaded conforming to the requirements of I.S. 554-1955 with pipe dies and taps
carefully in such a manner that it will not result in slackness of joints when the two
pieces are screwed together.
2.1.2. The taps and dies shall be used only for straightening screw threads which have
becoming bent or damaged and shall not be used for turning of the threads so as
to make them slack as the latter procedure may not result in the watertight joint.
The screw threads for tube and fitting shall be protected form edge until they are
2.1.3. In jointing the tubes, the inside of the socket and the screwed end of the tubes
shall be oiled and smeared with white or red lead and wrapping around with a few
turns of fine spun yarn round the screwed end of the tube. The end shall then be
tightly screwed in the socket, tees, etc. with a pipe wrench. Care shall be taken
that all times free from dust, and dirt during fixing. But from the joints shall be
removed after screwing. After laying the open ends of the pipes shall be
temperately plugged to prevent access of water, soil, or any other foreign matter.
2.1.4. Any threads exposed after jointing shall be painted or in the case of underground
piping thickly coated with approved anti-corrosive paint to prevent corrosion.
2.2. Fixing of tube fittings to wall ceiling & floors.
2.2.1. In case of fixing of tubes and fittings to the walls or ceilings, these shall run on the
surface of the wall, or ceiling (not in chase) unless otherwise specified. The fixing
shall be done by means of standard pattern, holder clamps keeping the pipes
about 15 mm. clear of the wall. When it is found necessary to pattern, holder
clamps keeping the pipes about 15 mm. clear of the .wall. When it is found
necessary to conceal the pipes and when specified so, chasing may be adopted
or pipe fixed inducts or recesses etc. provided that there is sufficient space to
work on the pipe with usual tools. The pipe shall not ordinarily be buried in walls
File : Specification_Sir J High School
or solid floors, where unavoidable, pipe may be buried for short distances
provided that adequate protection is given against damage and where so
required joints are not buried. Where required M.S. tube sleeve shall be fixed at a
place a pipe is peasant through a wall or floor for expansion and contraction and
other movements. In case the pipe is embedded in walls or floors, it should be
painted with anti-corrosive bitumastic paint of approved quality. The pipe should
not come in contact with lime mortar or lime concrete as the pipe is affected by
lime. Under the floors, the pipe shall be laid in layer of sand filling.
2.2.2. All pipes and fittings shall be fixed truly vertical and horizontal unless
unavoidable. The pipes shall be fixed to walls with standard pattern clamps of
required size and shape, one end of which shall be properly plugged or cemented
into walls with cement mortar 1:3 (1 cement : 3 coarse sand) and the other
tightened round the pipes to hold it securely. These clamps shall be spaced at
regular intervals in straight lengths at 2 MC/C interval in horizontal run and 2.5 m.
interval in vertical run. For pipe of 15 mm. dia. up to 25 mm. dia the holes in the
walls and floors shall be made by drilling with chisel or jumper and not by
dismantling the brick work or concrete. However for bigger diameter pipes the
holes shall be carefully made cement : 3 coarse sand), and properly finished to
match the adjacent surface.
2.3. Testing of joints :
2.3.1. After laying and jointing, the pipes and fillings shall be inspected under working
conditions of pressure and flow. Any joints found liken shall be redone, and ail
leaking pipes removed and replaced without extra cost.
2.3.2. The pipes and fittings after they are laid shall be tested to hydraulic pressure of
Kg./Sq cm. The pipe shall be slowly and carefully charged with water allowing all
air to escape and avoiding all shocks and water hammer. The draw off takes and
stop cock shall then be closed and specified hydraulic pressure shall be applied
gradually The pressure gauge must be accurate. The pipes and fittings shall be
tested in sections as the work laying proceeds, keeping, the joints exposed for
inspection during the testing.
3.0. Mode of measurements and payment
3.1. The description of the item shall, unless otherwise stated be held to include
where necessary conveyance and delivery, handling, unloading, storing
fabrication, hoisting, all labour for finishing to required shape and size, setting,
fitting in position straight, cutting and waste return of packing etc.
3.2. The length shall be measured on running meter basis of finished work. The
length shall be taken along the centre line of the pipe and fittings. The pipes fixed
to wall, ceiling. floors etc shall be measured and paid under this item.
File : Specification_Sir J High School
3.3. All the work shall be measured in decimal system as fixed in its place, subject to
tolerance given below unless otherwise stated.
(i) Dimension shall be measured to the nearest 0 01 meter.
(ii) Area shall be worked out to the nearest 0.01 sq. meter.
3.4. All measurements of cutting shall unless otherwise stated by held to include the
consequent waste.
3.5. In case of fitting of unequal bore, the targets bore shall be measured for the test.
3.6. Testing of pipe lines fittings, and joints include for providing all plant appliances
necessary for obtaining access to the work to be tested an carrying out the tests
3.7. The rate includes galvanised steel tubing with screwed socket joints to gather
with all fittings (such as bends, sockets springs, elbows, test, crosses, short
pieces, clamps and plugs, unions etc.) and fixing complete with clamping wall
hooks, wooden plug etc. and also curing, screwing and waste and for making
forged (or hand made) bends on piping as required. Connector shall be inserted
where required or directed. The rate also includes cutting through walls, floors
etc. and their making good and painting exposed threads with anti-corrosive paint
as above and testing where tubes are to be fixed to wall ceiling and flooring, the
rates shall not include painting of pipes, providing sleeves and sand filling under
floor for which separate payment shall be made.
3.8. The rate shall be for a unit of one running meter.
Signature of Contractor Deputy Executive Engineer Executive Engineer
R & B Sub Division No. 2 R & B Division
Surendranagar Surendranagar
File : Specification_Sir J High School
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BILL OF QTY..pdf
GR.pdf
INDEX.pdf
QTY. OF MATERIAL and TESTING.pdf
SBD Book.pdf
Specification_Sir J High School.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .