| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | R1₹5.2 LAccepted-AOC | R1 | Accepted-AOC Accepted |
Tender Value
₹5.4 L
EMD Value
₹13,400
Closing Date
25 Nov 2019, 5:00 pmClosed
Assistant Executive Engineer,KIP RB Sub Dn.No,26 K
Assistant Executive Engineer,KIP RB Sub Dn.No,26 Karunagappally
Rectification of Canal
2019_Irrig_304485_2
26/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Kaithakottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,200
Yes
online
₹13,400
Yes
13 Jul 2020
11 Nov 2019
26 Nov 2019
11 Nov 2019
25 Nov 2019
11 Nov 2019
Amount
Scheme 1: Rectification work between ch.600 m and 675 m
od38918/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
od38919/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od38920/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme 2: Rectification work between ch. 675 m and 730 m
od38918/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od38919/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od38920/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme 3: rectification work between ch.730 m and 775 m
od38918/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od38919/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od38920/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme 4: rectification work between ch.775 m and 950 m
od38918/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od38919/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od38920/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Bidder Name
M R PUSHPAKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_440711.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .