Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.7 L+₹5,726.30 (0.42%)Rejected-Finance NA | L2 | Rejected-Finance L2 | |
| 3 | L3₹14.5 L+₹87,804.40 (6.43%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15 L
EMD Value
₹1.5 L
Closing Date
23 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. S.S.K.-23 AZAMGARH
Office E.E. S.S.K.-23 AZAMGARH
Construction of New V.R.B. at Km 46.600 of Lalganj Dy.
2023_UPIDC_767441_1
04/EE/2022-23
Open Tender
Civil Works - Bridges
Item Rate
540 days
Azamgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹1.5 L
Yes
3 Feb 2023
17 Jan 2023
23 Jan 2023
17 Jan 2023
23 Jan 2023
17 Jan 2023
Amount
Earth work excavation in foundation with all type soil all lead and lift including refilling trench
C.C. 1:3:6 in foundation with stone ballast 22.4 mm to 53 mm size and coarse sand with cost of material, labour and T&P
First class brick work 1:4 cement mortar and coarse sand , abutment and wing wall including cost of material,labour, T&P etc.
First class brick work 1:3 cement mortar and coarse sand , abutment and wing wall including cost of material,labour, T&P etc.
Centering and Shuttering with all labour, material and T&P etc.
Cutting,Bending & placing of Reinforcement Steel in position including cost of material,labour and T&P
Laying R.C.C. Work Slab 1:1.5:3 with course crushed aggregate 10 mm to 20 mm and course sand ,F.M.not less than 2.00 including all cost of material and labour and T&P etc.
Laying C.C. Work Slab 1:1.5:3 with course crushed aggregate 10 mm to 20 mm and course sand ,F.M.not less than 2.00 including all material ,labour and T&P etc.
Stuck deep Cement Pointing in 1:2 cement mortar with coarse sand with all material , labour and T&P
Painting, Finishing of wall with water proofing cement paint of approvedmake such as super snowcem ,durrocem etc supreme quality of required shade on uncoated wall suface ( one coat) over one coat white cement primer o give evenshades after throughly brushing the suface to remove alldirt and remain of loose powdered material including all cost of materials etc.
Supply and fixing wheel guard including all cost of materials & labours etc.
E/W in making ramp and canal section .
S/F joint filler board including all cost of material, labour ,T&P etc.
Ist class brick work soling on edge on both side including all cost of material and labour and T&P etc.
M/S SAGUN ENTERPRISES
SHIVAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .