Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.9 LAdmitted-Finance | -1.10% | ₹66.9 L | L1 | Admitted-Finance |
| 2 | L2₹67.6 LAdmitted-Finance 311 BHABWAR KASHIPUR DEUARA VARANASI UTTAR PRADESH 221311 | VARANASI | UTTAR PRADESH | 221311 | -0.10% | ₹67.6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical LANE NO 03 PLOT NO 03 SWARNA GANGA ENCLAVE DOON UNIVERSITY ROAD PCR FARMS MOTHROWALA DISTRICT DEHRADUN 248012 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248012 | - | - | - | Rejected-Technical Not qualify in technical bid |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
22 May 2026, 1:00 pmClosed
GENERAL MANAGER, BHARTIYA COOPERATIVE GRAMIN VIKAS
GENERAL MANAGER, BHARTIYA COOPERATIVE GRAMIN VIKAS EVAM NIRMAN LIMITED UTTARAKHAND
Construction work of mini stadium in Banbassa district Champawat
2026_BCGN1_95201_1
204/BCGVENL/TENDER/2025-26 Dated 08/05/2026
Open Tender
Construction Works
365 days
Banbassa district Champawat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Bhartiya Co-operative Gramin Vikas Evem Nirman Lim
₹1.4 L
3 Jun 2026
8 May 2026
22 May 2026
8 May 2026
22 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - | - |
| 2 | Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan), Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. 2.8.1 All Kinds Of Soil. | 32.76 | Cu M | 260.3 | ₹8,527.43 | 2 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 22.93 | Cu M | 196 | ₹4,494.28 | 3 |
| 4 | Supplying and filling in plinth with sand under Floors, including watering, ramming, consolidating and dressing complete. | 8.77 | Cu M | 2,123.75 | ₹18,625.29 | 4 |
| 5 | 3 Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos / Lindane E.C. 20% with 1% concentration | 20.9 | Sq M | 310.05 | ₹6,480.05 | 5 |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 8.64 | Sq M | 749.3 | ₹6,473.95 | 6 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : - 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mmnominal size) | 4.9 | Cu M | 6,812 | ₹33,378.8 | 7 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.33 | Cu M | 7,132.25 | ₹23,750.39 | 8 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 8.08 | Cu M | 9,045.75 | ₹73,089.66 | 9 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 6.51 | Cu M | 10,852.95 | ₹70,652.7 | 10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
SBDMINISTADIUMBANBASSA.pdf
Tender Documents • 4.05 MB
BOQ_112584.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid