Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance DAMDAMA P O SABROOM SABROOM SOUTH TRIPURA PIN 799145 | SOUTH TRIPURA | TRIPURA | 799145 | -36.66% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹46,924.41 (16.9%)Admitted-Fee/PreQual/Technical/Finance BABUGRAM PARA WEST HARINA SATCHAND SOUTH TRIPURA PIN 799145 | SOUTH TRIPURA | TRIPURA | 799145 | -25.95% | ₹3.2 L+₹46,924.41 (16.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.3 L+₹51,130.52 (18.4%)Admitted-Fee/PreQual/Technical/Finance ARALIA AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | -24.99% | ₹3.3 L+₹51,130.52 (18.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.3 L+₹55,511.89 (20.0%)Admitted-Fee/PreQual/Technical/Finance NEW JAIL ROAD SABROOM SOUTH TRIPURA | -23.99% | ₹3.3 L+₹55,511.89 (20.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.5 L+₹77,374.90 (27.9%)Admitted-Fee/PreQual/Technical/Finance | -19.00% | ₹3.5 L+₹77,374.90 (27.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹8,763
Closing Date
11 Sept 2026, 3:00 pmClosed
Executive Officer, Sabroom Nagar Panchayat
Office of the Sabroom Nagar Panchayat, Sabroom, South Tripura
Construction of Waiting Shed for Pallbearers near the Electric Cremation Centre at ward no 9 under Sabroom Nagar Panchayat during the year 2026-27.
2026_Urban_76576_1
03/SBM/NP/DEV/2026-27
Open Tender
Civil Works
Percentage
120 days
Sabroom Nagar Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹8,763
14 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 25.89 | cum | 231.6 | ₹5,996.12 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil | 24.38 | cum | 161.3 | ₹3,932.49 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to
required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 4.03 | cum | 1,177.3 | ₹4,740.99 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | 3.98 | cum | 9,960.7 | ₹39,593.78 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and
reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 5.55 | cum | 15,780 | ₹87,610.56 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 485.42 | Kg | 103.9 | ₹50,435.14 |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | 4.32 | Sqm | 333.9 | ₹1,442.45 |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with timber planks | 8.7 | Sqm | 577.1 | ₹5,020.77 |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply | 20.7 | Sqm | 499.4 | ₹10,337.58 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 18.29 | Sqm | 625.5 | ₹11,440.39 |
stage.html
html • 0.02 MB
finance_77950.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
DNIeT.pdf
Tender Documents • 2.64 MB
BOQ_77950.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .