Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance 8 RAMBAGH KANWALI ROAD DEHRADUN | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.7 Cr+₹74.2 L (18.9%)Admitted-Finance 5 A WEST REST CAMP DEHRADUN | ₹4.7 Cr+₹74.2 L (18.9%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical 5 A WEST REST CAMP DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 250 SARTHI VIHAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S DOON INFRASTRUCTURE L2 | M/s V K Aggarwal L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 1,287.45 | Cum | 750 ₹9,65,587.5 | 569 ₹7,32,559.05 Lowest |
| 2.00 | Excavation in Soil with Dozer with lead upto 100 m
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 1,430.5 | Cum | 45 ₹64,372.5 | 36 ₹51,498 Lowest |
| 3.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1,430.5 | Cum | 70 ₹1,00,135 | 53 ₹75,816.5 Lowest |
| 4.00 | Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) for grading- I Material | 572.2 | Cum | 2,600 ₹14,87,720 | 1,715 ₹9,81,323 Lowest |
| 5.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | 643.73 | Cum | 2,250 ₹14,48,392.5 | 2,070 ₹13,32,521.1 Lowest |
| 6.00 | Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 66,783.41 | Sqm | 10.7 ₹7,14,582.49 | 9.8 ₹6,54,477.42 Lowest |
| 7.00 | Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) | 3,038.95 | Cum | 8,350 ₹2,53,75,232.5 | 7,085 ₹2,15,30,960.75 Lowest |
| 8.00 | Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading I - 13mm using Bitumen VG - 30 | 1,519.38 | Cum | 9,850 ₹1,49,65,893 | 8,680 ₹1,31,88,218.4 Lowest |
| 9.00 | Construction of K.C. type Drain as per attached Drawing Including Supply of All labour material T& P etc. also including Excavation, laying of P.C.C. M10 and laying of C.C. M-20 for making of Drain | 1,200 | Rmt | 1,250 ₹15,00,000 | 547 ₹6,56,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹8.1 L
Closing Date
17 Jun 2021, 11:00 amClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Yamuna Colony, Dehradun
Construction of Ghat and beautification of left side Road Near Kalu Sidh Temple and Construction of Double lane motor road by connecting Nathuwawala, Balawala, Nakronda and Kalu Sidh Temple in doiwala Assembly Under C.M. Ghosna 09/2017.
2021_pwd_32719_1
2063/1C-9/21, Dated 15-04-2021
Open Tender
Civil Works - Roads
Item Rate
365 days
Nathuwawala, Balawala, Nakronda, Kalu Sidh Temple
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Temp. Div., PWD, Rishikesh
₹8.1 L
Superintending Engineer, 9th Circle, PWD, Dehradun
26 Jun 2021
10 May 2021
21 Jun 2021
10 May 2021
17 Jun 2021
25 May 2021
24 May 2021
Amount
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) for grading- I Material
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Tack coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading I - 13mm using Bitumen VG - 30
Construction of K.C. type Drain as per attached Drawing Including Supply of All labour material T& P etc. also including Excavation, laying of P.C.C. M10 and laying of C.C. M-20 for making of Drain
M/S DOON INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .