Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹27.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹28.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹29.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RAM SINGH BISHT L3 | DB CONSTRUCTION L2 | HARGOVIND SINGH MAHARA L1 |
|---|---|---|---|---|---|---|
| 1.00A- Building work | ||||||
| 1.01 | Earth work in excavation by mechanical means by hydraulicExcavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 14.4 | Cu.m | 100 ₹1,440 Lowest | 100 ₹1,440 Lowest | 287 ₹4,132.8 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 4.63 | Cu.m | 8,000 ₹37,040 | 7,500 ₹34,725 Lowest | 7,500 ₹34,725 Lowest |
| 3.00 | Reinforced cement concrete work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses,fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring,shuttering, finishing and reinforcement. 1:1.5:3 (1 Cement : 1.5 Coarse sand : 3 Graded stone aggregate 20mm nominal size) | 22.96 | CUM | 12,000 ₹2,75,520 | 13,200 ₹3,03,072 | 11,950 ₹2,74,372 Lowest |
| 4.00 | Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size | 2.58 | CUM | 10,000 ₹25,800 Lowest | 13,750 ₹35,475 | 11,655 ₹30,069.9 |
| 5.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||
| 5.01 | Suspended floors, roofs, landings, balconies and access platform | 108.89 | SQM | 100 ₹10,889 Lowest | 540 ₹58,800.6 | 750 ₹81,667.5 |
| 5.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 51.66 | SQM | 100 ₹5,166 Lowest | 450 ₹23,247 | 800 ₹41,328 |
| 5.03 | Columns, Pillars, Piers, Abutments, Posts and Struts | 22.23 | SQM | 100 ₹2,223 Lowest | 650 ₹14,449.5 | 900 ₹20,007 |
| 5.04 | Stairs, (excluding landings) except spiral-staircases | 7.45 | SQM | 100 ₹745 Lowest | 475 ₹3,538.75 | 700 ₹5,215 |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
7 Apr 2026, 3:00 pmClosed
EE TD PWD Berinag
EE TD PWD Berinag
New construction of Forest Range Officers Residence under Gangolihat Range
2026_pwd_93438_3
313/3A Dated 10-03-2026
Open Tender
Civil Works - Buildings
Item Rate
365 days
Berinag
As per bid documents
3 documents required · 3 mandatory
₹2,950
EE TD PWD Berinag
₹70,000
Yes
10 Apr 2026
20 Mar 2026
7 Apr 2026
23 Mar 2026
7 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A- Building work | |||||
| 1.01 | Earth work in excavation by mechanical means by hydraulicExcavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | - | Cu.m | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | |||||
| 3Reinforced cement concrete work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses,fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring,shuttering, finishing and reinforcement. 1:1.5:3 (1 Cement : 1.5 Coarse sand : 3 Graded stone aggregate 20mm nominal size) | |||||
| 4Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 5.01 | Suspended floors, roofs, landings, balconies and access platform | - | SQM | - | - |
| 5.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | SQM | - | - |
| 5.03 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | SQM | - | - |
| 5.04 | Stairs, (excluding landings) except spiral-staircases | - | SQM | - | - |
stage.html
html • 0.02 MB
finance_110609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_110609.xls
BOQ • 0.40 MB
SBDForestRangeOfficeGangolihat.pdf
Tender Documents • 2.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].