Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC First Lowest quoted amount | |
| 2 | L2₹1.7 L+₹10,046.92 (6.48%)Rejected-AOC | L2 | Rejected-AOC Second Lowest quoted amount |
| Sl No | Description | Qty | Unit | C H MOIDEEN KUNHI L2 | ABDUL KHADER FAIZAL A M L1 |
|---|---|---|---|---|---|
| 1.00Appendix A - Closing Vents 2024 | |||||
| 1.00 | OD9361/2025-2026:Engaging Man mazdoor for conveying FRP shutters from store shed and fixing in position and making water tight using bolts, nuts and wedges including all labour charges etc. complete | 45 | each | 1,170.76 ₹52,684.2 | 1,099.49 ₹49,477.05 Lowest |
| 1.00 | OD9360/2025-2026:Engaging Man mazdoor for removing debris accumulated in the cross bar vents. | 12 | each | 1,170.76 ₹14,049.12 | 1,099.49 ₹13,193.88 Lowest |
| 1.00 | OD9362/2025-2026:Maintenance of FRP shutter: Fixing the rubber bearding with synthetic rubber adhesive labor and removing old adhesive per the department officers' direction. | 39.1 | metre | 211.43 ₹8,266.91 | 198.56 ₹7,763.7 Lowest |
| 2.00Appendix B - Opening Vents 2025 | |||||
| 2.00 | OD9359/2025-2026:Engaging Man mazdoor for removing FRP shutters from the cross bar by removing bolt, nuts and wedges, cleaning and conveying carefully and stacking in store shed at places pointed out by the departmental officers at site | 46 | each | 1,170.76 ₹53,854.96 | 1,099.49 ₹50,576.54 Lowest |
| 2.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 0.53 | cum | 10,559.76 ₹5,575.55 | 9,916.99 ₹5,236.17 Lowest |
| 2.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 3.52 | sqm | 417.76 ₹1,470.52 | 392.33 ₹1,381 Lowest |
| 2.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 36.96 | kilogram | 121.62 ₹4,495.08 | 114.22 ₹4,221.57 Lowest |
| 2.00 | 60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers. | 8.8 | metre | 2,801.27 ₹24,651.18 | 2,630.76 ₹23,150.69 Lowest |
Tender Value
₹1.4 L
EMD Value
₹3,588
Closing Date
7 Oct 2025, 4:00 pmClosed
The AEE MI Sub Division Kasaragod
Office of The Assistant Executive Engineer Minor Irrigation Sub Division Kasaragod
GENERAL-AM 2025-2026-Annuamaintenance to VCB cum foot bridge across Pallathadka river at Kuduppamkuzhi in Badiadka Panchayath for the year 2025-26- General Civil Workor the year 2025 26 General Civil Work
2025_Irrig_803185_1
IRR/IA/TR/3483/2025_5_6_3/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kuduppamkuzhi
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹3,588
Yes
5 Nov 2025
27 Sept 2025
8 Oct 2025
27 Sept 2025
7 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335225.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .