| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹8.5 L+₹60,471.64 (7.66%)Rejected-AOC ASSISTANT ENGINEER LSGD POOR GRAMA PANCHAYAT KIZHKKOMBEL KOORACHUNDU P O 686634 | KOTTAYAM | KERALA | 686634 | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹8.8 L
EMD Value
₹25,000
Closing Date
13 Jan 2020, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,MVIP Sub Division No.9,Ramamangalam At Muvattupuzha
MVIP-Costruction of leading Channel near ch.5150 of Ramamangalam Brach canal including clearing U.T.
2020_Irrig_333561_1
41/AEE/MVIP-9/2019-20/S
Open Tender
Civil Works - Canal
Item Rate
120 days
Vettimoodu near pambakkuda
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,200
Yes
online
₹25,000
Yes
27 Feb 2020
4 Jan 2020
15 Jan 2020
4 Jan 2020
13 Jan 2020
4 Jan 2020
4 Jan 2020 - 13 Jan 2020
Amount
Appendix A: Construction of leading channel
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.28 : Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints.
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
od50915/2019_2020/P2 : Plastering with CM 1:3 9 mm thick one coat floated hard and trowelled smooth including cost & conveyance of all materials, labour charges, watering , curing etc. complete as per the direction of departmental officers at site. ( Cement 43 Kgs /10 m2)
ELDHOSE PHILIP
Bidder Name
Saju C S
ELDHOSE PHILIP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_464806.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .