Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.3 LAccepted-AOC KUJU COLLIERY RAMGARH DIST RAMGARH PIN 825316 JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | 825316 | ₹37.3 L | 1 | Accepted-AOC TCR APPROVED IN F/O L1 BIDDER |
| 2 | 2₹41.7 LRejected-Finance | ₹41.7 L | 2 | Rejected-Finance Higher rate |
| 3 | 3₹44.7 LRejected-Finance AT SUNDERPUR PO JEALGORA DHANBAD | ₹44.7 L | 3 | Rejected-Finance Highest rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Failed to submit credentials required as per NIT. |
Tender Value
₹59.7 L
EMD Value
₹74,700
Closing Date
16 Mar 2026, 3:00 pmClosed
STAFF OFFICER CIVIL KUJU AREA
CIVIL DEPT. GM OFFICE CCL KUJU AREA KUJU RAMGARH JHARKHAND
Strengthening of infrastructure of the School Bal Vidya Mandir, Ara under CSR Scheme 2025-2026 of Kuju Area, CCL.
2026_CCL_354706_1
GM(K)/SO(C)/e-NIT/2025-26/551
Open Tender
Civil Works - Buildings
Percentage
120 days
GM UNIT
Please refer NIT.
5 documents required · 5 mandatory
₹74,700
11 Jul 2026
26 Feb 2026
17 Mar 2026
27 Feb 2026
16 Mar 2026
27 Feb 2026
27 Feb 2026 - 10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,438.75 | Sqm | 33.2 | ₹47,766.5 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 73 | No | 227.1 | ₹16,578.3 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge : Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 9.18 | Cum | 1,464.6 | ₹13,445.03 |
| 4 | Brick work with F.P.S. bricks of class designation 50 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.68 | Cum | 6,770.05 | ₹51,993.98 |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:Size of angle | 3,083.58 | Kg | 114.9 | ₹3,54,303.34 |
| 6 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flats 30x6mm for diagonal braces and central cross piece | 117.56 | Sqm | 4,422.65 | ₹5,19,926.73 |
| 7 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. all complete.Fixed to steel windows by welding. | 424 | Kg | 177.4 | ₹75,217.6 |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.40mm thick with 20mm nominal size stone aggregate | 52.5 | Sqm | 500.3 | ₹26,265.75 |
| 9 | 12 mm cement plaster of mix :1:6 (1 cement : 6 fine sand) | 1,298.01 | Sqm | 230.6 | ₹2,99,321.11 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_367552.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].