| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.7 CrAccepted-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹5.7 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.7 Cr+₹2.0 L (0.35%)Rejected-AOC KHASRA NO 974 NH 24 MEHRAULI GHAZIABAD UTTAR PRADESH | MEHRAULI | GHAZIABAD | UTTAR PRADESH | ₹5.7 Cr+₹2.0 L (0.35%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹6.2 Cr+₹50.6 L (8.94%)Rejected-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹6.2 Cr+₹50.6 L (8.94%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹6.8 Cr+₹1.2 Cr (20.6%)Rejected-AOC | ₹6.8 Cr+₹1.2 Cr (20.6%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹7.5 Cr+₹1.9 Cr (33.0%)Rejected-AOC KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | ₹7.5 Cr+₹1.9 Cr (33.0%) | L-5 | Rejected-AOC L-5 |
Tender Value
₹8.3 Cr
EMD Value
₹16.7 L
Closing Date
25 Sept 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Sharda Mukhye nahar ke km. 26.660 se km. 44.899 ke madhye dayein evam vayein bank ke chatigrast antrik slope pitching evam bank ke punarsthapna ka karye.
2024_UPIDC_954772_1
01/SE/2024-25
Open Tender
Civil Works
Item Rate
540 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹16.7 L
Yes
18 Oct 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
Amount
Cleaning thick Bushes and thorny jungle without uprooting also including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including all lift and lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge
Supplying & laying dry stone boulder (Size 20-40 kg) in 8 S.W.G. G.I. double knot G.I. Wire crate size 5.0x0.50x0.50m mesh size 15cm.x15cm. including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Supplying & laying dry stone boulder (Size 20-40 kg) in 8 S.W.G. G.I. double knot G.I. Wire crate size 2.0x0.50x0.50m mesh size 15cm.x15cm. including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Laying C.C.(1:3:6) with P.C.C. Cement, coarse sand and Stone ballast 20 to 40mm also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Random rubble masonary work in (1:4) with Cement, coarse sand and boulder also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Supplying and laying of Non-Woven Geo Textile Sheet made of 250 GSM 100% polyproplene staple fiber (continuous filament not allowed) also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Dismentaling and relaying boulder pitching also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Supplying and laying Dry stone pitching hand packed also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Supplying & laying dry stone boulder (Size 20-40 kg) in 8 S.W.G. G.I. double knot G.I. Wire crate size 3.0x1.5x1.0m mesh size 15cm.x15cm. including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Laying C.C in 1:1.5:3 Mix (M- 20) cement. Coarse sand and Stone Grit 6 to 12 mm also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
M-100 brick work in 1:4 cement and sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Cement plaster 1:4 on Brick masonery with cement sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar with all lift and lead of material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Finishing walls with water proofing cement paint of approved made such as super snowcem, Durrocem, Robiacem Guttucem, supermen quality of required shade on uncoated wall surface (two coat) over one coat white cement primer to give even shades after throughly brushing the surface of remove all dirt and remains of loose powdered material also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
Earth work in embankment by power tranported earth with a lead upto 3.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.
M-150 Brick flooring on edge (dry) joints sand filled including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the Work as per Directed by Engineer In Charge.
M/S KOSHER CONSTRUCTION PVT. LTD.
M/S UNITE ENTERPRISES
M/s A.M. BUILDERS
VIJAY KUMAR SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .