Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹61.4 L
EMD Value
₹61,413
Closing Date
30 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, Public Health Circle, GWSSB, Mehsana
Shifting of MS/PVC Pipeline at Unava, Aithor and Bhandu Cross Road Due to Overbridge/Culvert Work, Ta. Unjha, Dist.Mehsana.
355938
8 of 2026-27
Open
Civil Works - Water Works
Works
Mehsana
6 documents required · 6 mandatory
₹2,400
Executive Engineer, Public Health Works Division, GWSSB, Mehsana
₹61,413
16 Oct 2026
16 Oct 2026
16 Oct 2026
30 Oct 2026
16 Oct 2026
Estimated Cost: Rs.
Executive Engineer
Public Health Dharoi Project Division
Gujarat Water Supply & Sewerage Board
VOLUME-III PRICE BID
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
4.0 SUMMRY (SCHEDULE-B)
6.0 BREAK UP FOR INTERIM PAYMENTS
SUMMARY OF PRICE
- Grand Summary of Schedules (Covering Schedule)
SCHEDULE-A - NIL
Shifting of MS/PVC Pipeline at Unava, Aithor and
SCHEDULE-B - Bhandu Cross Road Due to Overbridge/Culvert Work,
Ta. Unjha, Dist.Mehsana.
SCHEDULE-C - NIL
SCHEDULE-D - PREAMBLE
- BREAK UP FOR INTERIM PAYMENTS
VOLUME-III PRICE BID
Name of Work: - Shifting of MS/PVC Pipeline at Unava, Aithor and Bhandu Cross
Road Due to Over bridge/Culvert Work, Ta. Unjha, Dist.Mehsana.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other formats
will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the
bidder‟s proposal, without giving any reasons whatsoever and the bidder shall not
be permitted to withdraw his bid on this account.
free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate
as called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be in line to the price
quoted in Schedule-C. The total shall be carried forward to Schedule-B for
comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment shall
be on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(9) Each item is to be individually priced online and the amounts shall be added up to
shall be left blank except where the item description requires the item to be
priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder‟s design, in which case the bidder shall add the words
“NOT APPLICABLE”. The wording in the item description is for subject matter
guidance only; clause references are indicative only and all other relevant clauses
shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or
not. Items against which no prices are quoted shall not be separately paid for and
the bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted for
satisfactory working/safety of the system as specified, will not be separately paid
for by the Employer when executed and shall be deemed to be already covered by
other items and rates listed in the price sheets No extra payment shall be given
for any item which is required to complete and perform the project.
during the pendency of the Contract. In case of any discrepancy noted in the
arithmetic corrections if any will be considered for financial evaluation of the bid.
(12) Schedule „D gives the basis of interim payment for construction of works.
VOLUME-III PRICE BID
(13) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water, pumping,
de-watering etc. for the proper execution of works. The rates shall also be
deemed to include any works and setting out that may be required to be carried
out for laying out of all the works involved.
(14) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these documents
are to be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites
at his own cost. These accesses will be used by the other contractors working for
the prices shall include all the equipments / materials / accessories and services
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour cess
which is non-refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(24) The rates to be quoted shall be exclusive of GST but inclusive of all other taxes.
Duties which shall not be paid extra. While GST will be paid for admissible part of
actual work done at the approved tender rates and tender condition of price
variation. GST shall be paid as per prevailing rates at the time of payment. The TDS
shall be deducted at source as per provision of IT rules and GWSSB policy.
(25) The rates should be quoted exclusive of GST but inclusive of all other taxes as per by
the Contractor must be exclusive of GST but inclusive of all other taxes as per
Volume-I (B) General Condition of Contract, Clouse No.47
(26) The Ministry of Finance and Company Affairs, Department of Revenue, Government of
India has issued a notification No. 6/2007-Central Excise Circular No. 6/2007, dated 1th
March 2007 regarding the Central Excise Duty Exemption. By this notification, the
notification 659/50/2002 dated 6th September, 2002 has been amended and the earlier
notification 26/2009 dated 4th December, 2009 has been amended and the Items of
materials, instruments, apparatus and appliance, ancillary equipments and their
components/parts, etc. for setting up of Water Treatment Plants and the Pipes needed
for delivery of water from its source to the Plant and from there to the Storage facility (as
mentioned in notification No.6/2007) are exempted from Central Excise Duty subject to
the Certification by the Collector/ District Magistrate/ Deputy Commissioner of the
District, regarding its use on such Projects. Necessary Project Authority Certificate shall
be made available to the Contractor, as per the prevailing rules, to facilitate him to avail
the benefit in terms of Exemption of Central Excise. ( Circulars attached herewith )
(27) The Bidders shall have to quote the rates in this tender keeping in view of the Probable
rebate available to them as per the above Circulars of Government of India. The liability
of the Department is limited to issuing the Project Authority Certificate to the Contractor
and the Department does not take any responsibility whether the Agency gets the
VOLUME-III PRICE BID
Excise Exemption or not. The Complete responsibility rests with the Contractor/Agency
(28) The process requires that the bidder shall quote his price for the work components
and fix during the entire period of performance of the contract except price
variation allowed for supply of MS pipe as per Volume-IB Clause No. 59, General
Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in the
Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-
2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and
shall be recovered from the running bills of the work from time to time and
remaining amount if any shall be recovered from the final bill before releasing the
security deposit of the work. The contractor shall furnish the statement showing
the quantity of quarried materials / minerals from whom purchased (with full
address of the seller) and copies of the bills for purchase to the Executive
Engineer of the in charge of the work. The contractor shall also furnish such
additional information as regards royalty payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non-compliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due amount
(32) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(33) Payment should be made after fund released by GWSSB.
(34) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the state
of Gujarat. For arriving at the difference in procurement prices due to
introduction of GST it will be open for the Board to ask for original invoices, lorry
receipt, weigh bridge slips, payment details and such other documents as may be
required for the purpose.
The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent
tax authority. The final decision regarding the quantum of claim amount to be
recovered or reimbursed shall be of the competent authority of the GWSSB and
shall be binding on the contractor.
Signature of contractor Executive Engineer
P. H. Dharoi Project Dn.,
G.W.S.S.B, Mehsana
VOLUME-III PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH DHAROI PROJECT DIVISION,
SUB: Shifting of MS/PVC Pipeline at Unava, Aithor and Bhandu Cross Road Due to
Overbridge/Culvert Work, Ta. Unjha, Dist.Mehsana.
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions
execution of the above Contract, we the undersigned offer to design, Engineer,
procure, construct, complete, commission, operate and maintain the whole of
the said works for 5 years from the date of commissioning including defects
liability period as given in Conditions of Contract and in conformity with the
Annexure, Bidding Documents, including Addenda Nos.__________ (insert
numbers) for Lump sum fixed price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer‟s representative or
any other person/Agency by the Employer to perform on his behalf for
carrying out the inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and
approved by the Engineer‟s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to
take any action including termination of Contract and impose at his
absolute discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted
at any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal
Contract Agreement with you incorporating the conditions of Contract there to
VOLUME-III PRICE BID
annex but until such agreement is prepared this Bid together with your written
acceptance thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms
and of value specified in the Clause 1 of Volume-IB, “General Conditions of
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages
likely to be suffered by you in the event of the work not being completed by us
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
VOLUME-III PRICE BID
Name of Work Shifting of MS/PVC Pipeline at Unava, Aithor and Bhandu Cross Road
Due to Overbridge/Culvert Work, Ta. Unjha, Dist.Mehsana.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
The contractor submitting the Tender shall see that the rate in Schedule-A are filled in
by the Engineer in Charge at the time of issue tender.
The contractor while submitting the tender shall provide his own arrangement at his
2 own cost for loading, unloading, and transporting safety to the site of work the cement
stipulated in Schedule-A
Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
All the materials required for the items other than labour in Schedule-A but available
4 with the dept. will be issued on request to the contractor. (for use in this contract only)
at prevailing market rates or departmental issue rates whichever is higher.
All the surplus materials supplied by the deptt. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
The materials mentioned in schedule-A shall have to be checked for their correctness
6 and soundness by the contractor before taking the delivery of the materials from the
7 Necessary cement will be purchased by the agency at their own cost from open market.
The persons of firm submitting the Tender should see that rates in the above schedule
8 are filled up by the Executive Engineer, on the issue of form prior to the submission of
9 Carting of above materials should be done by contractor at his own cost.
Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Those works will be executed which are found necessary at the time of execution,
contractor will not be entitle for any claim for saving in any items as per site condition.
The sub contract, if any given by the contractor would not create any right against the
VOLUME-III PRICE BID
13 The Amount Recoverable from the contractor by the Gujarat water supply and
sewerage board on any account shall be liable to be recovered from the amount
payable to the contractor / suppliers.
14 After passing the bill fund shall be demanded to higher authority payment shall be
made after getting fund from higher authority.
Signature of contractor Executive Engineer
P. H. Dharoi Project Dn.,
G.W.S.S.B, Mehsana
VOLUME-III PRICE BID
Name of Work:-Shifting of MS/PVC Pipeline at Unava, Aithor and Bhandu Cross Road Due to
Overbridge/Culvert Work, Ta. Unjha, Dist.Mehsana.
Decription Qty Unit Amount
No. In figure In Words
Manufacture, Supply & Delivery of Electric Resistance 102.00 Rmt 1285.00 Rupees One Thousand
Welded (Up to 400mm)/Submerged Arc Welded(Above Two Hundred Eighty
400mm) M.S.Pipe having beveled ends plate or coil Five only
conforming to IS-3589-2001 or its latest revision/
ammendment for following thickness outside diameter at
GWSSB (2022-23) store or site anywhere in Gujarat State
including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading
conveyance to Departmental stores, stacking etc. all
complete. (Rate for MS Pipe based on the ex. works price of
HR Coil as Rs.58500.00 per MT Without GST (Above 3.15 mm
to 10 mm) & Rs. 59000.00 per MT Without Gst (Above
mm) as on Jan-2023.( WPI Index of H. R Coil of Dec-22 is
144) 168.3 mm Dia & 4.5 mm Thickness(Bare Pipe)
1.1 273 mm Dia & 5.0 mm Thickness(Bare Pipe) 20.40 Rmt 2336.00 Rupees Two Thousand
Three Hundred Thirty
1.2 355.60 mm Dia & 5.6 mm Thickness (I/S Solvent free Liquid 612.00 Rmt 4662.00 Rupees Four Thousand
Epoxy Lining (406 micron) + O/S 3 LPE Coated M.S. Pipe) Six Hundred Sixty Two
2.0 Manufacture, Supply & Delivery of MS specials flange ended 157.00 Kg. 96.00 Rupees Ninety Six only
complete as per latest IS for various diameter and classes
including all taxes, loading, unloading, staking, insurance,
octroi charges, etc. complete. MS special Plain & Socket
ends (Up to 300 mm dia.)
2.1 MS special Plain & Socket ends (above 300 mm dia.) 315.00 Kg. 96.00 Rupees Ninety Six only
2.2 MS special Flangd ends (above 300 mm dia.) 154.00 Kg. 98.00 Rupees Ninety Eight
3.0 Providing and supplying in standard length ISI mark rigid 200.00 Rmt 420.00 Rupees Four Hundred
unplasticised PVC pipes suitable for potable water with ring Twenty only
fit joint including cost of rings, as per IS specification no.
4985/1988 including ali local and central taxes
VOLUME-III PRICE BID
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to the departmental stores
and including cost of jointing meterial etc. complete. Rate
for PVC Resin as Rs. 91739/MT (Price Without GST) 160 mm
3.1 200 mm Dia 6 kg./cm2 600.00 Rmt 665.00 Rupees Six Hundred
Sixty Five only
3.2 250 mm Dia 6 kg./cm2 600.00 Rmt 1035.00 Rupees One Thousand
Thirty Five only
4.0 Excavation for pipe line trenches for water supply, sewerage 2419.60 Cum 89.00 Rupees Eighty Nine
line, manhole etc. all with shoring and struting if required as only
per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to
all required lead cleaning the site etc. complete for all lifts
and strata as specified. a) In all sorts of soil and soft murrum
Upto 1.50 mt depth
4.1 a) In all sorts of soil and soft murrum 1.50 mt to 3.00 mt 540.00 Cum 98.00 Rupees Ninety Eight
5.0 Lowering, laying, Jointing & welding in position to correct 100.00 Rmt 240.00 Rupees Two Hundred
line & level M.S. Pipe with outerside 3 LPE coating & inside Forty only
solvent free liquid epoxy lining on pedestal or chairs upon
prepared formation or prepared bedding in trenches the
rates include conveyance from store to site of work, loading,
unloading, joint plastering, hydrotesting etc.complete.
168.3 mm Dia & 4.5 mm Thickness MS Pipe
5.1 273 mm Dia & 5.0 mm Thickness MS Pipe 20.00 Rmt 347.00 Rupees Three Hundred
Forty Seven only
5.2 355.6 mm Dia & 5.6 mm Thickness MS Pipe 600.00 Rmt 444.00 Rupees Four Hundred
Forty Four only
6.0 Lowering, laying, fixing and jointing PVC/UPVCICPVC pipes 200.00 Rmt 28.00 Rupees Twenty Eight
and specials of following class and diameter including cost of only
conveyance from stores to site of works, including cost of
labour, material, cement solvent, giving satisfactory
hydraulic |testing as per ISi code. 160 mm Dia 6 kg./cm2
6.1 200 mm Dia 6 kg./cm2 Pipe 600.00 Rmt 37.00 Rupees Thirty Seven
6.2 250 mm Dia 6 kg./cm2 Pipe 600.00 Rmt 51.00 Rupees Fifty One only
7.0 Gas Cutting of MS Pipe / Plates 21.98 Rmt 56.00 Rupees Fifty Six only
Gas cutting(Either square cut or V cut) pipes, plates etc.
VOLUME-III PRICE BID
including all costs for the following thickness. Above 5mm up
8.0 Extra Welding for fixing various appurtances 21.98 Rmt 681.00 Rupees Six Hundred
Welding in all positions with required number runs, for Eighty One only
M.S.Pipes internally and/or externally including gauging
wherever necessary, fixing appurtenances and other
accessories in connection with pipe laying work as per
specification. Welding for Pipe thickness 4 mm to 7mm
As above for Butt Joints : Plate thickness
9.0 Labour charges for repairing of leakage in MS pipeline of 2.00 No. 5470.00 Rupees Five Thousand
following diameter at different places including necessary Four Hundred Seventy
excavation manually or by machinery, dewatering, removing only
of mud, cleaning of pipe and leakage portion, grinding,
cutting the pipeline or joint if necessary incl. welding the
joint by using ISI marked welding rods duly approved by EIC
of appropiate number and size inclusive of excavator,
Hydra/ Crane, D.G. set, welding machine, Gas cutter with
LPG Cylinder, Oxygen cylinder, Grinding machine etc. with
fuel, opertor & labour as required, (incl. all material but
excluding cost of pipe) 355.6 mm Dia MS Pipe
10.0 Labour charges for repairingof leakage in PVC pipeline of 2.00 No. 1629.00 Rupees One Thousand
folling dia meter at different places including necessary Six Hundred Twenty
excavation manually or by mechanise excavation, Nine only
dewatering removing of mud, cleaning of pipe and leakage
portion, cutting the pipeline & removing piece of pipe from
trench with inclussive of mechanical devices JCB,
Hydra/Crain if necessary & labours required with providing
material such couplers, solution etc. comp.(incl. all material
but excluding cost of pipe) 160 mm Dia.
10.1 200 mm Dia. 2.00 No. 2652.00 Rupees Two Thousand
Six Hundred Fifty Two
10.2 250 mm Dia. 2.00 No. 3646.00 Rupees Three Thousand
Six Hundred Forty Six
11.0 Providing and supplying ISI mark Cl D/F Sluice, Valves as per 2.00 No. 20946.00 Rupees Twenty
1S:14846 (Latest Edition) of following class and diameter Thousand Nine Hundred
including all. taxes, insurance, transportation, freight Forty Six only
charges, octroi, inspection charges,loading, unloading,
conveyance to departmental stores, stacking etc. complete.
300 mm Dia. (PN-1.6 With hand wheel/cap operated (PD
type short body)
VOLUME-III PRICE BID
12.0 L,L& J of SV/ AV/ BFV/ RV 2.00 No. 1141.00 Rupees One Thousand
Lowering, laying and jointing in position following C. I. / D/F One Hundred Forty One
Reflux valves, Butterfly valves, Sluice valves and Air valves only
including cost of all labour, jointing material, including nut
bolts and giving satisfactory hydraulic testing, etc.
complete. 300 mm Dia.
13.0 Valve Chamber 2.00 No. 11351.00 Rupees Eleven
Construction of valves chambers in brick or bela stone Thousand Three
masonry, locally available in C. M. 1:6. Foundation concrete Hundred Fifty One only
150 mm thick in C. C. 1:4:8 of trap metal size 25 mm to
mm thick, inside cement plaster in C. M. 1:3 and cement
pointing outside in C. M. 1:3 and top cover of precast RCC
slab 100 mm thick (with key hole in two parts, each with
handles or MS Bar etc. complete as given size) Upto 1 Mt.
depth from G. L. to pipe invert level incl. complete civil
works but excl. cost of excavation and refilling, with cast in
situ RCC slab in one single piece with fixing of Cl-MH Frame
and cover (excl. cost of CI-MH Frame and cover) with 23 mm
thick brick masonry wall in C.M.1:6. Size of chamber 1.30 m
x 1.30 m and 1.0 mt. deep
13.1 For 1 mtr Extra Depth 2.00 No. 6084.00 Rupees Six Thousand
Eighty Four only
14.0 Temper proof Air valves Providing and supplying C. I. 2.00 No. 9965.00 Rupees Nine Thousand
Temper proof Air valves with SS 304 Float gun metal- nozzle Nine Hundred Sixty
of approved make & quality of following class and diameter Five only
including all taxes, insurance, transportation, freight
charges, octrol, inspection charges, loading, unloading,
conveyance to deparimental stores, stacking etc. complete.
80 mm Dia.(Without Isolating Sluice Valve PN 1.6)
14.1 80 mm Dia.(Without Isolating Sluice Valve PN 1) 2.00 No. 7387.00 Rupees Seven Thousand
Three Hundred Eighty
14.2 50 mm Dia.(Without Isolating Sluice Valve PN 1) 2.00 No. 5499.00 Rupees Five Thousand
Four Hundred Ninety
VOLUME-III PRICE BID
15.0 L,L& J of SV/ AV/ BFV/ RV Lowering, laying and jointing in 4.00 No. 411.00 Rupees Four Hundred
position following C. I. / D/F Reflux valves, Butterfly valves, Eleven only
Sluice valves and Air valves including cost of all labour,
jointing material, including nut bolts and giving satisfactory
hydraulic testing, etc. complete. 80 mm Dia.
15.1 50 mm Dia. 2.00 No. 379.00 Rupees Three Hundred
Seventy Nine only
16.0 Erection of airvalve riser by installing new M.S pipe of 6mm 4.00 No. 4350.00 Rupees Four Thousand
thick and 3.2mt length with necessary fittings such as flange Three Hundred Fifty
of appropriate size,nut bolts and embeded the pipe in R CC only
M15 with offset of 10 cm around pipe with necessary steel
etc complete. Dia. Of Air Valve 80mm & MS Pipe
16.1 Dia. Of Air Valve 50mm & MS Pipe 2.00 No. 3112.00 Rupees Three Thousand
One Hundred Twelve
17.0 Refilling the pipeline trenches incl. ramming, watering, 2846.19 cum. 22.00 Rupees Twenty Two
consolidating desposal of surplus stuff as directed within a only
radius of 3 km.
18.0 Drilling of Horizontal bore hole fer water main pipeline 100.00 Rmt. 9166.00 Rupees Nine Thousand
under the Railway/ Road tracks in all strata with required One Hundred Sixty Six
length including fixing of M.S.(or as specified by Railway/ only
Road authority) casing pipe of suitable size and Thickness,
Rate includes the cost of Drilling of bore hole , Casing pipe &
welding pushing etc complete but excluding the cost of
water main, valves and other items. Entire work should be
as per Approved Drawing and 4s per instruction of Railway /
Road authority for Following diameter of Bore hole. for MS
pipe. Horizontal Drilling-600 & MS Casing Pipe-500 thick-8
19.0 Providing C.C.M.:100 for encasing pipes using trap metal 20.27 Cum. 4113.80 Rupees Four Thousand
size 12 mm to 50 mm incl. form work curing consolidation One Hundred Thirteen
etc. complete for various location on pipe line. Usine trap & Paise Eighty only
metal 20 mm nominal size. For encasing the pipe 168.3 mm
Dia & 4.5 mm Thickness(Bare Pipe)
20.0 Providing and casting in situ C.C. in grade M-20 (proportions 7.49 Cum. 5520.00 Rupees Five Thousand
as per mix design or as per table9 of 15456 2000 in masses Five Hundred Twenty
by weigh batching ) using granite, quartzite trap metal of only
size 6 mm to 20 mm for RCC work, including scaffolding
centering, formwork, needle vibrated consolidation, curing
VOLUME-III PRICE BID
complete up to 6 meter deoth or height (excluding cost of
reinforcement and neat finishing) with centering and
shuttering/deshuttering etc. complete for structure other
than water retaining (Below GL) 2. Footing for column or
foundation (with form work) 273 mm Dia & 5.0 mm
Thickness(Bare Pipe) and 355.60 mm Dia & 5.6 mm
Thickness( I/S Solvent free Liquid Epoxy Lining (406 micron)
+ O/S 3 LPE Coated M.S. Pipe)
21.0 Supplying cutting, bending, binding and placing in position 0.2996 MT 77504.00 Rupees Seventy Seven
steel as per plan and design and as per ISS 2502 including Thousand Five Hundred
cost of steel and binding wire for reservoirs/structures only Four only
including lift up to 6 meter height or depth below G.L. for
all diameters -Do- Thermo mechanically treaed (TMT) bars
Fe 500 grade for all diameters. Av. 40 Kg/cu.m. of concrete
Total of Schedule B
I/We am /are withing to carry out the work at % above / below (Should be written in figures and words)
Above/ below the tendered rate mentioned and above amount of my tender as under
Estimated amount put to Estimated amount put to
Signature of contractor
Executive Engineer
Public Health Dharoi Proj. Division
VOLUME-III PRICE BID
OPERATION & MAINTENANCE FOR Augmentation of Regional Water Supply scheme
based on Siddhi Sarovar at Patan (Based on NMC Khorsam)
The works of this schedule comprises of the supply of all spare parts as required
including the supply of all labour, materials, consumables (except electrical power),
equipment, tools and tackles and comprehensive operations and maintenance for
“Working survey, soil investigation, Design, Build and Operate contract for Providing,
Supplying, Lowering, Laying & Jointing Rising/Gravity main DI/PVC Pipelines,
Designing (aesthetically) & constructing RCC U/G Sumps, RCC ESR, Pump Rooms, Staff
Quarters, Compound Walls, RCC roads, chlorination arrangements, including SITC of
HSCF/VT Pumping Machinery with associated Electro-Mechanical works for
Augmentation of Regional Water Supply scheme based on Siddhi Sarovar at Patan
(Based on NMC Khorsam) Taluka : Patan, Siddhapur, Harij, Sarasvati & Unjha Dist :
Patan/Mehsana including Designing & Construction of R.C.C U/G Sumps at Village
Level & Connecting Pipeline with Pumping Machinery with Operation & Preventive
maintenance of all type existing and new Structures for 60 months” O&M period
during the 1st year from the date of successful commissioning as shown in table O & M-1
It.No. Description Quoted Price (Rs)
1 Establishment
2 M & R Charges (Civil & Mechanical)
Chemical Charges (Chlorine/Alum/PAC-10%/PAC-
4 Chemical Analysis Charges
Insurance Charges (Establishment+ Structure
(Civil & Mechanical)
6 Cleaning of Storage
7 Vehicle Charges
Total price for O & M for the First Year
The cost of damages to the system shall not be included in the Schedule-C/1 as it is
already covered under „Defects Liability Period”.
VOLUME-III PRICE BID
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the component
as related to the total costs of the concerned item as whole. A head titled (any other
item(s)) is included in each breakdown of schedule and the tenderer shall at the time
of tendering indicate any additional items which he considers necessary but cannot
be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer‟s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by both
Signature of contractor Executive Engineer
Public Health Dharoi Project Division
VOLUME-III PRICE BID
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Percentage Payment to
Item Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
Signature of contractor Executive Engineer
Public Health Dharoi Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
DMO_2941_01-Apr-2026_744.pdf
01 VOL 1A Technical Bid Pg 1 to 117 F.pdf
02 VOL 1B 1 GCC pg 118 to 230.pdf
03 VOL IB 2 Special Note Pg 231.pdf
04 VOL II Extent of Work and Tech specification pg 232 to 305.pdf
05 VOL III Price bid standard pg 306 to 323.pdf
6. Drawing 1.pdf
6. Drawing 2.pdf
6. Drawing 3.pdf
Ann 4 Royalty GR .pdf
Ann 3 shramyogi GR_compressed.pdf
Annexure 7 Min labour wages.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .