Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.1 LAccepted-AOC AMBALA CANTT | ₹42.1 L | L1 | Accepted-AOC awarded |
| 2 | L2₹46.3 LRejected-AOC AMBALA CANTT | ₹46.3 L | L2 | Rejected-AOC refund |
| 3 | L3₹46.9 LRejected-AOC AMBALA CANTT | ₹46.9 L | L3 | Rejected-AOC refund |
| 4 | Not Admitted-Fee/PreQual/Technical AMBALA CANTT | AMBALA | HARYANA | 133001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Shyam Sunder Govt. Contractor L1 | ashok kumar govt. cont L2 | Dashmesh Engineers L3 |
|---|---|---|---|---|---|---|
| 1.00 | Inspection of tubewell with Geo Scanning borehole camera with display and data recorder to find out the fault and submission of suggestions regarding rectification of same to obtain the sand free water at site Including Transportation, Lodging, and Boarding. Detailed Analysis with Videography and Submission of Report, Video and also verifying the depth/ position of assembly complete in all respect to the satisfaction of Engineer-in-charge. | 3 | Per job | 18,000 ₹54,000 | 15,000 ₹45,000 | 15,000 ₹45,000 |
| 2.00 | Development of t/well by Over-pumping unit having suitable submersible pump for development of tubewell to ensure sand free discharge. All the equipment including POL and labour required for carrying out pumping tests but not limited to the following shall be arranged by the contractor at his own cost complete in all respect to the satisfaction of Engineer-in-charge: i) A suitable pump and prime mover (since power is not available at the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for further chemical analysis in Public Health Lab. | 3 | Per job | 18,000 ₹54,000 | 18,000 ₹54,000 | 20,000 ₹60,000 |
| 3.00 | Drilling of 500mm dia bore by hydraulic rotary drilling (reverse circulation method with rock roller/diamond bit) according to ISI Specification No. 2800-1991 (Part-I) as amended up to date and modified to extent of the specification attached with this schedule of items of work in all kinds of soils and boulders except rocky strata including the cost of all consumable stores, fuel, oil, soil stabilizing material and transportation of rig and other accessories to the to the site of proposed bore and back including cost of lowering of all size of casing pipe while boring and extracting the same against earth friction etc. complete to the satisfaction of the Engineer-in-Charge. | 600 | Meter | 4,530 ₹27.2 L | 5,230 ₹31.4 L | 6,000 ₹36 L |
| 4.00 | Resistivity survey with deep penetration, generator operated, D.C. resistivity meter to know the type of sub surface strata at different depths. Quantity of water likely to be available and depth of the tubewell to be installed to obtain fresh water in required quantity including transportation of equipments and manpower, submission of hard copy of resistivity survey with relevant technical data complete in all respect to the satisfaction of Engineer-in-Chief | 3 | Per job | 18,000 ₹54,000 | 20,000 ₹60,000 | 20,000 ₹60,000 |
Tender Value
₹44.1 L
EMD Value
₹88,250
Closing Date
27 Mar 2026, 3:00 pmClosed
SHYAM LAL
Ambala Cantt. (M) PHED
Augmentation of Drinking Water Supply Scheme in Kalka Town
2026_HRY_509813_1
20269083258F D162 4A86 9C42 628D3695C736549PUH
Open Tender
Civil Works
90 days
Kalka
as per DNIT
6 documents required · 6 mandatory
₹5,000
₹88,250
Yes
7 May 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Inspection of tubewell with Geo Scanning borehole camera with display and data recorder to find out the fault and submission of suggestions regarding rectification of same to obtain the sand free water at site Including Transportation, Lodging, and Boarding. Detailed Analysis with Videography and Submission of Report, Video and also verifying the depth/ position of assembly complete in all respect to the satisfaction of Engineer-in-charge. | |||||
| 2Development of t/well by Over-pumping unit having suitable submersible pump for development of tubewell to ensure sand free discharge. All the equipment including POL and labour required for carrying out pumping tests but not limited to the following shall be arranged by the contractor at his own cost complete in all respect to the satisfaction of Engineer-in-charge: i) A suitable pump and prime mover (since power is not available at the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for further chemical analysis in Public Health Lab. | |||||
| 3Drilling of 500mm dia bore by hydraulic rotary drilling (reverse circulation method with rock roller/diamond bit) according to ISI Specification No. 2800-1991 (Part-I) as amended up to date and modified to extent of the specification attached with this schedule of items of work in all kinds of soils and boulders except rocky strata including the cost of all consumable stores, fuel, oil, soil stabilizing material and transportation of rig and other accessories to the to the site of proposed bore and back including cost of lowering of all size of casing pipe while boring and extracting the same against earth friction etc. complete to the satisfaction of the Engineer-in-Charge. | |||||
| 4Resistivity survey with deep penetration, generator operated, D.C. resistivity meter to know the type of sub surface strata at different depths. Quantity of water likely to be available and depth of the tubewell to be installed to obtain fresh water in required quantity including transportation of equipments and manpower, submission of hard copy of resistivity survey with relevant technical data complete in all respect to the satisfaction of Engineer-in-Chief | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.80 MB
BOQ_588616.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid