Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.0 L
EMD Value
₹3,000
Closing Date
9 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 21, GANDHINAGAR
Reparing & All In Comprehensive Maintenance Contract For AC Machine Installed At Directorate of Economics and Statistics Office and CPL Building At Sector 18, Gandhinagar
269392
16/14 of 2025/2026
Open
Electrical
Works
Gandhinagar
8 documents required · 8 mandatory
₹600
Yes
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 21, GANDHINAGAR
₹3,000
Yes
27 Jan 2026
27 Jan 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
Name of Work Reparing & All In Comprehensive Maintenance Contract For AC Machine Installed At Directorate of
Economics and Statistics Office and CPL Building At Sector 18, Gandhinagar
Fund Head : Deposit Work
Sr. No. Item No. Particulars. Qty. Rate Amount
Signature of Contractor Deputy executive Engineer
C.P Electrical R & B Sub Dn
Name Of Work :- Reparing & All In Comprehensive Maintenance Contract For AC Machine Installed At
Directorate of Economics and Statistics Office and CPL Building At Sector 18, Gandhinagar
Item Estimated Rate in Rs.
Item Description Unit Amount in Rs.
No. Quantity in Figure In Word
(1) The All inclusive comprehensive maintenance cost
covers the yearly maintenance cost of the electrical
machineries with material & Labour cost including
preventive maintenance. The cost covers entire
installation from outlet of main switch to electrical
(3) All inclusive comprehensive maintenance cost of
Window type / Split type Air conditioners & Water coolers
covers the yearly maintenance & preventive
1 maintenance with all required painting materials &
labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers
entire installation from outlet of main switch to the Unit.
All inclusive comprehensive maintenance cost for the
period of one year for the Split type Air-conditioning Unit
of following Capacity
(B) 1.5 ton capacity
(SOR Item No. 12-7-5)
(1) Charges for breakdown Maintenance as per Rupees One
requirement throughout the year Thousand Two
15 Nos. 1233.21 Each
Three And Paise
(2) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Hundred Forty
15 Nos. Months from date of issue of work order. 144.43 Each
Forty Three Only
(3) Charges for 2nd Routine Maintenance of wet Rupees Two
Services with water or Chemical as per site Hundred Sixty
15 Nos. requirement Services between 3rd months to 6th 267.65 Seven And Each
Months from date of issue of work order. Paise Sixty Five
(4) Charges for 3rd Routine Maintenance of Dry
Services between 6th months to 9th Months from Hundred Forty
15 Nos. date of issue of work order. 144.43 Each
Forty Three Only
(5) Charges for 4th Routine Maintenance of wet Rupees Two
Services with water or Chemical as per site Hundred Sixty
15 Nos. requirement Services between 9th months to 12th 267.65 Seven And Each
Months from date of issue of work order. Paise Sixty Five
(1) The All inclusive comprehensive maintenance cost
covers the yearly maintenance cost of the electrical
machineries with material & Labour cost including
preventive maintenance. The cost covers entire
installation from outlet of main switch to electrical
(3) All inclusive comprehensive maintenance cost of
Window type / Split type Air conditioners & Water coolers
covers the yearly maintenance & preventive
2 maintenance with all required painting materials &
labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers
entire installation from outlet of main switch to the Unit.
All inclusive comprehensive maintenance cost for the
period of one year for the Inverter Based Cassette/Tower
type split Air-conditioning Unit of following Capacity (B)
2.0 ton capacity
(A) Charges for breakdown Maintenance as per
requirement throughout the year Thousand Four
4 Nos. 4434.91 Hundred Thirty Each
Ninety One Only
(B) Charges for 1st Routine Maintenance of Dry Rupees Five
Services between date of commencement to 3rd Hundred
4 Nos. Months from date of issue of work order. 518.13 Eighteen And Each
(C) Charges for 2nd Routine Maintenance of wet Rupees Nine
Services with water or Chemical as per site Hundred Sixty
4 Nos. 960.51 Each
requirement Services between 3rd months to 6th And Paise Fifty
Months from date of issue of work order. One Only
(D) Charges for 3rd Routine Maintenance of Dry Rupees Five
Services between 6th months to 9th Months from Hundred
4 Nos. date of issue of work order. 518.13 Eighteen And Each
(E) Charges for 4th Routine Maintenance of wet Rupees Nine
Services with water or Chemical as per site Hundred Sixty
4 Nos. 960.51 Each
requirement Services between 9th months to 12th And Paise Fifty
Months from date of issue of work order. One Only
(1) The All inclusive comprehensive maintenance cost
covers the yearly maintenance cost of the electrical
machineries with material & Labour cost including
preventive maintenance. The cost covers entire
installation from outlet of main switch to electrical
(3) All inclusive comprehensive maintenance cost of
Window type / Split type Air conditioners & Water coolers
covers the yearly maintenance & preventive
3 maintenance with all required painting materials &
labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers
entire installation from outlet of main switch to the Unit.
All inclusive comprehensive maintenance cost for the
period of one year for the Inverter Based Cassette/Tower
type split Air-conditioning Unit of following Capacity (C)
for 3.0 ton to 4.0 ton capacity 3/1 Phase
(A) Charges for breakdown Maintenance as per Rupees Seven
requirement throughout the year Thousand Two
8 Nos. 7236.65 Hundred Thirty Each
Sixty Five Only
(B) Charges for 1st Routine Maintenance of Dry Rupees Eight
Services between date of commencement to 3rd Hundred Forty
8 Nos. 844.36 Each
Months from date of issue of work order. Four And Paise
Thirty Six Only
(C) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site Thousand Five
8 Nos. requirement Services between 3rd months to 6th 1568.53 Hundred Sixty Each
Months from date of issue of work order. Eight And Paise
Fifty Three Only
(D) Charges for 3rd Routine Maintenance of Dry Rupees Eight
Services between 6th months to 9th Months from Hundred Forty
8 Nos. 844.36 Each
date of issue of work order. Four And Paise
Thirty Six Only
(E) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site Thousand Five
8 Nos. requirement Services between 9th months to 12th 1568.53 Hundred Sixty Each
Months from date of issue of work order. Eight And Paise
Fifty Three Only
Shifting of Split A.C. The Scope includes dismantling,
shifting, re-installing & re-commissioning of the units
including topping up of Refrigerant gas, minor civil work
4 5 Nos. 1969.50 Hundred Sixty Each
wiring existing piping M S Stand electrical cabling with
PVC drown piping for 1.00, 1.5 & 2.0 to 4 TR capacity.
Replacing Old u/s by new Supplying and erecting
insulated pair of soft copper tubing open or concealed
5 40 RMTS including power and control cable,necessary PVC drain 965.56 RMT
pipes for Split AC machine up to 4 TR capacity Old-10
Replacing Old u/s by new Supplying & installing MS
standard type stand mounting for outdoor unit of Split
6 3 Nos. A.C. upto 4 TR capacity erected with necessary hardware 746.39 Each
materials as directed.
Thirty Nine Only
Replacement of defective remote control panel assembly
unit of Split air conditioner.
7 5 Nos. 2526.01 Hundred Twenty Each
Supplying and laying UPVC cable trunking system
comprising unplasticised polyvinyl, chloride rigid material Rupees Four
with ignition free and flame proof confirming BS with Hundred Twenty
8 15 Mtrs necessary end caps Internal and external bend, flat 428.24 Eight And Paise Mtr
bends, coupler, tee etc..All necessary accessories and Twenty Four
measuring of following sizes Only
(2) 100 mm x 50 mm trunking
carry out RCC Core cutting- up to 100 mm dia./200mm Rupees One
thick Wall/beam/slab with providing PVC pipe of 3 mm Thousand One
thick inside and necessary finishing on both ends of wall . Hundred Ninety
9 3 Nos. 1199.88 Each
Replacing Old u/s by new Providing and erecting Air
Cooled Condenser unit having face area of 0.235 Sq.Mtr. Rupees Four
made out of 27 / 30 gauge copper tube and cover with Thousand Six
10 2 Nos. 4006.67 Each
Aluminium fins of12-13FPI . For Split AC Machine And Paise Sixty
(B) For 1.5 TR A.C. Machine with 3/4 Row Deep coil Seven Only
repairing of PCB of remote control of split ac machine
11 5 Nos. 985.76 Each
Seventy Six Only
Replacing old and unserviceable Indoor unit Fan Blower
motor by new 12 watt to 30 Watt capacity suitable for
Thousand Eighty
Split AC machine.
12 2 Nos. 1087.77 Seven And Each
Replacing Old u/s by new Supplying and erecting Rupees Twelve
approved make Reciprocating compressor suitable for Thousand Five
operation on 220 / 230 V 50 c/s. A.C. supply for One- Hundred
13 2 Nos. 12514.91 Each
Two Ton capacity window/ Split type Air conditioner or Fourteen And
water coolers of 150 Litre capacity Paise Ninety
Replacing old and unserviceable fan motor by new 1/6 Rupees Two
H.P. two speed Fan motor, fan of 350 to 1200 CFM flow Thousand One
14 2 Nos. suitable for A.C. machine. 2136.15 Hundred Thirty Each
Replacing unserviceable running capacitor of 36 MFD to
50 MFD upto 2.5H.P. compressor motor for A.C.
15 2 Nos. 506.01 Hundred Six And Each
machine upto 2 Ton. And for Single Phase Motor
Flushing the line, leak testing, leak stopping, vacuuming, Rupees One
dehydrating and charging the gas in the refrigeration Thousand Four
system for A.C. machine up to 2 TR Hundred
16 2 Nos. 1473.59 Each
And Paise Fifty
Supplying colourless non inflammable refrigerant Gas R-
RUPEES IN WORDS Rupees Two Lakh(s) Ninety Seven Thousand One Hundred Seventy Three And Paise Thirty One Only
I/We am/are willing to carry out the work at(No above rates allowed) ____________% below ___________________________________
__________________percent (Should be written in figures and words) below the tendered rates mentioned above.
Amount of my/our tender works out as under :
Estimated amount put to tender Estimated amount put to tender
Deduct……………………….. % Below Add……………………….. % Above
In words In words
1 I/We hereby declare that I/We have visited the site, fully exquisite myself/ourselves with the local situation regarding materials and
2 I/we hereby declare that I/We carefully studied the conditions of specifications and other tender documents of this work and agree
3 A tender with any overwriting in percentage (should both in word and figures) rejected out right.
4 Insertions and/or corrections in the percentage quoted ( both in word and figures) resulting into increase in the value of the work
5 Dismentaling the existing material taken by contractor as mention rates.
Signature of Contractor Deputy executive Engineer
C.P Electrical R & B Sub Dn
Less for the D.M
Name of work:- Reparing & All In Comprehensive Maintenance Contract For AC Machine Installed At
Directorate of Economics and Statistics Office and CPL Building At Sector 18, Gandhinagar
Sr.no Item Qty. Per DM rate Total
1 Cost Of Old & u/s Copper Tube 10 Rmt. 76.86
2 Cost Of Old & u/s Stand 3 Nos. 24.44
3 Cost Of Old & u/s Remote Control Panel 5 Nos. 93.24
4 Cost Of Old & u/s Condensor 2 Nos. 337.95
5 Cost Of Old & u/s Fan Blower 2 Nos. 50.85
6 Cost Of Old & u/s Compressor 2 Nos. 1073.16
7 Cost Of Old & u/s Fan Motor 2 Nos. 102.55
8 Cost Of Old & u/s Capacitor 2 Nos. 29.77
Dy.Executive Engineer Exe.Engineer
Sign of Contractor Cap.Proj. Elect.sub.Div-21 C.P.Electrical Division
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
G S T LTR.pdf
GR.pdf
Notice 16 ONLINE.pdf
PQ.pdf
SCHEDULE A B AND DM.pdf
STANDARD BIDDING DOCUMENT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .