| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.1 LAccepted-AOC RAHMATH MANZIL BEVINJE THEKKIL FERRY 671541 | THEKKIL FERRY | KASARAGOD | KERALA | 671541 | ₹50.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹52.3 LRejected-Finance | ₹52.3 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | DILEEP KUMAR K V L1 | RAMSHEED M.B | DILRAJ K DILEEP L2 |
|---|---|---|---|---|---|---|
| 1.00Compound wall | ||||||
| 1.00 | 15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar | 69.13 | cum | 858.25 ₹59,327.39 | - | 890 ₹61,522.14 |
| 1.00 | OD338526/2025-2026:DISMANTLING DR - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. ( OD based on 60.7.3 ) | 21.81 | cum | 738.58 ₹16,106.95 | - | 760 ₹16,574.08 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 250.59 | cum | 350.72 ₹87,887.63 | - | 360 ₹90,213.12 |
| 1.00 | OD301586/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(60.7.1) | 13.39 | cum | 3,893.62 ₹52,127.78 | - | 4,000 ₹53,552 |
| 1.00 | OD338463/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble (departmental) including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 17.45 | cum | 1,672.98 ₹29,186.81 | - | 1,720 ₹30,007.12 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 15.99 | cum | 8,134.9 ₹1,30,060.78 | - | 8,350 ₹1,33,499.8 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.27 | cum | 7,734.56 ₹1,10,348.97 | - | 7,940 ₹1,13,279.98 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 86.74 | sqm | 395.81 ₹34,332.56 | - | 390 ₹33,828.6 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 311.1 | sqm | 818.61 ₹2,54,669.57 | - | 840 ₹2,61,324 |
Tender Value
₹53.6 L
EMD Value
₹50,000
Closing Date
23 Oct 2025, 4:00 pmClosed
Executive Engineer Thrissur corporation
Executive Engineer Thrissur corporation
Thrissur Corporation Tagore Centenary Hall Side protection and compound wall construction-Thrissur Corporation Tagore Centenary Hall Side protection and compound wall construction
2025_LSGD_808723_23
PW2-17409/18,23.10.25,EE2
Open Tender
Civil Works - Buildings
360 days
Superintending Engineer Thrissur corporation
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
24 Jan 2026
17 Oct 2025
25 Oct 2025
17 Oct 2025
23 Oct 2025
17 Oct 2025
17 Oct 2025 - 21 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1354760.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_1354760.xls
BOQ • 0.31 MB
NIT.pdf
Other Document • 0.03 MB
SBD.pdf
Other Document • 1.72 MB
Download all tender documents and submit your bid