Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹5,000
Closing Date
16 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Deputy Executive Engineer, Irrigation Sub Division, Chotila
Annual Maintenance of earthen dam of Saburi Irrigation Scheme for year 2025-26.
292767
01 of 2026-27 ISD Chotila
Open
Civil Works - Others
Surendranagar
6 documents required · 5 mandatory · 1 optional
₹600
Deputy Executive Engineer, Irrigation Sub Division, Chotila
₹5,000
1 Apr 2026
1 Apr 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
SURENDRANAGAR IRRIGATION DIVISION - SURENDRANAGAR
IRRIGATION SUB DIVISON - CHOTILA
Name of Work : Annual Maintenance of earthen dam of Saburi Irrigation Scheme for year 2025-26.
Memorandum showing Items of Woks to be carried out
Item No Quantities Item of work ESTIMATED RATES Unit Total amount
Item No Quantities Item of work ESTIMATED RATES Unit Total amount
estimated but In Figures In words according to
may be more or estimated
less quantities
1 105920.00 Maintenance of earthan dam by Clearing the slope of dam within the dam boundry by 3.80 Three Rupees and Sqmt Per
removing the bushes, shrubs,girth and small trees including depositing the materials Eighty Paisa Year
as and where directed up to 50 mt. lead and all lift etc.complete. (Throughout the
2 11060.00 3.80 Three Rupees and Sqmt Per
Jungle clearence (Ganda baval etc) Light/Heavy dence (work done by Manually or by
Eighty Paisa Year
machinary) including grabbing of & removing the roots & grith completely from the
ground & back fill with earthe & macking surtface good away from the site of work at
own risk and cost as and where directed etc completely for following.
In Words Rs. (Four Lack Fourty Four Thousand Five Hundred Twenty Four Rupees Only)
I/We am/are willing to carry out the work at % above/ below present (should be written in figures and words)
of the estimated rates mentioned above. An amount of my/our tender works out as under:
* Estimated Amount * Estimated Amount
Put to tender Rs_____________________________ Put to tender Rs_________________
In Words (Rs. ) In Words Rs.( )
(Pease strike out whichever is not applicable)
Note-1: The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no extra payment shall bemade.
Note-2: Thel abour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note-3: GST and Incometax TDS will be deducted at a source while making payments of bills
Note-4: In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Deputy Executive Engineer
Signature of Contractor. Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 TITLE PAGE.pdf
2 E-Tender Notice.pdf
3 Invitation For Bid P 1 to 6.pdf
4 SECTION-1 Instruction to Bidders P 7 to 27.pdf
5 SECTION-2 Qualification Information P 28 to 35.pdf
6 SECTION-3 Conditions of Contract P 36 to 64.pdf
7 SECTION-4 Contract Data P 65 to 74.pdf
8 SECTION-5 to 10 Annexure P 75 to 96.pdf
9 Annexure-1 Section-5 Tech Spec P 97 to 121.pdf
10 Annexure-2 Sec-7 Bill of Quantities Schedule B.pdf
Download all tender documents and submit your bid