Executive Engineer, N.P.Main Canal Dn.No.2, Gandhinagar-382010
Resurfacing Approach road of Limbadiya-Ranasan (UVRB) by laying WMM, BM and SDBC and Installation of Crash Barrier at in approaches Ch. 225.875 km of Narmada Main Canal.
275735
19 of 2025-26 (2nd Attempt)
Open
Civil - All
Works
Gandhinagar
6 documents required · 6 mandatory
₹1,062
Yes
Executive Engineer, N.P.Main Canal Dn.No.2, Gandhinagar
₹14,900
Yes
12 Feb 2026
12 Feb 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
8 Section -7 Bill of Quantities 108-112
9 Section -8 Securities and Other Forms 113-124
10 Section -9 Drawing 125-126
11 Section -10 Documents to be furnished by Bidder 127-128
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer, Narmada Project Main Canal Dn.No.2, Gandhinagar invites
bids for the works detailed in the table.
The bidders may submit bids for any or all of the following works.
Sr. Name of work Approximate Bid Cost of Period of #Class of
No. value of security document completion Registration /
works (Rs.) (Rs.) (Rs.) Category of
1 Resurfacing Approach road of 14,89,548=40 14,900/- Rs.900/- + 02 Months Class-A” and
Limbadiya-Ranasan (UVRB) by Rs.162/- above
laying WMM, BM and SDBC and (18% GST)
Installation of Crash Barrier at in
approaches Ch. 225.875 km of
Narmada Main Canal (2nd
2. Prospective / Interested bidder may download the Bid Documents from website
https://tender.nprocure.com free of cost till the Time and Date as mentioned on
online NIT at website https://tender.nprocure.com
(A) The concerned Contractor/bidder shall submit the certificate of registration or
renewal receipt as approved contractor in "A & above" Class in SSNNL/NWRWS & K
Dept / R & B Dept of Gujarat State or equivalent class in CPWD/ Railway /other State
(B) The Contractor registered outside Gujarat shall apply for getting registered himself
in "A & above" class either with the Sardar Sarovar Narmada Nigam Limited or with
the state of Government of Gujarat before the date of submission of Tender. The
proof of the application for the registration shall have to be attached with the Tender
(C) The Contractor registered in CPWD / Railway and other State Govt. equivalent to
class of Gujarat mentioned above, will be eligible to quote for the Tender with the
condition that concerned Contractor shall get themselves registered in "A & above"
class in the Sardar Sarovar Narmada Nigam Limited or in the State of Gujarat on or
before the date of acceptance (approval) of his Tender.
Failure of such bidders to get themselves registered in “A & above" class either
with the Sardar Sarovar Narmada Nigam Limited or with the state of Government
of Gujarat before the date of submission of Tender, the bid of such concerned
contractor/bidder shall be rejected, and he shall be considered nonresponsive/
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document
Fee / Tender Fee through Demand Draft only of any Schedule Bank payable at
Gandhinagar and in favour of ‘Executive Engineer, Narmada Project Main Canal
Division No.2, Gandhinagar’. Once the Bid is received online, Bid Document / Tender
Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against
Bid Security / EMD shall be submitted in electronic format through online (by
scanning) while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security / EMD has been received. Accordingly, the offer of only
those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD
have been received electronically. However, for the purpose of realization of
Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original
through R.P.A.D./Speed Post/Courier only so as to reach to Engineer, Narmada
Project Main Canal Division No.2, Gandhinagar within 07 days from the last day of
bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Executive Engineer / Tender Inviting Authority by bidder shall be
4. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://tender.nprocure.com in the presence of the bidders or their
authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on …………. at … … . . hrs. at 5th Floor, Committee
Room, Block No.12, SSNNL, New Sachivalaya, Gandhinagar to clarify the issues and to
answer questions on any matter that may be raised at that stage as stated in clause
9.2 of ‘instructions to Bidders’ of the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees. (The Validity of EMD should be 165 days
from the date of uploading of BG/FDR documents on e-tendering website.).
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No written
or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender
are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the
bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly
in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past,
it shall not be deemed to be a ground / reason for not giving required information for
this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation of
this bid. The Government will not ask for any other information, unless it is found
absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
The threshold limit for the pre-qualification criteria shall be adopted as per SSNNL
circular issued vide letter No.CPC/Model Tender/Revision/2011/ 648 Pt-IIIA,
dtd.21-05-2019 which is as under
-Works of Water Resources
Above Rs.7.5 Crores
-Roads/Bridge/Building work Above Rs.7.0 Crore
-Electrical Work * Above Rs.0.5 Crore
(*) includes any or combination of providing AC plants, lifts, sound systems
of Auditorium refrigeration
For the works costing below Rs.7.5 crore for Water Resources department Works and
above Rs.7.0 crore for Road, Building and Bridge Works documents mentioned in
Section-10 shall be submitted in electronic format only through online by scanning
and also the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD should be sent
in original to the Tender opening authority through RPAD/Speed Post/ Courier) only,
so as to reach the Executive Engineer N.P.Main Canal Dn.No.2, Gandhinagar within
days from last day of submission of Bid.
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 8 19. Sealing & Marking of Bids
2. Source of Funds 8 20. Deadline for Submission of
3. Eligible Bidders 8 21. Late Bids
4. Qualification of the 8 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 12 E. Bid Opening and Evaluation
7. Site Visit 12 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 13 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 13 27. Correction of Errors
10. Amendment of Bidding 14 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 15 F. Award of Contract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 16 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 16 33. Notification of Award and
Signing of Agreement
16. Bid Security 16 34. Performance Security
17. Alternative Proposals By 17 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 17 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works
(as defined in these documents and referred to as ‘the works”) detailed in the table
given in IFB. The bidders may submit bids for any or all of the works detailed in the
table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat /
Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
4.5 QUALIFICATION CRITERIA:
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5 Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment
to attain the completion of works in accordance with the prescribed construction schedule
are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid, a
detailed construction planning and methodology supported with layout and necessary
drawings and calculations to allow the employer to review their proposals. The numbers,
types and capacities of each plant/equipment shall be shown in the proposals along with
the cycle time for each operation for the given production capacity to match the requirements
4.5.7. Deleted.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration
resulting from contracts completed or under execution by him over the last five
years. A consistent history of awards against the Applicant or any partner of a joint
venture may result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due
to bankruptcy. The rescinding of contract of a joint venture on account of reasons
other than non – performance, such as Most Experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before the start
of work, which are not attributable to the poor performance of the contractor will,
however, not affect the qualification of the individual partners.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if
their available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as
Assessed Available Bid Capacity = ( A*N*2-B), where
A= Maximum value of works executed in any one year during the last five
years (updated to the price level of the year indicated in appendix) taking
into account the completed as well as works in Progress. As per the
Certificate (regarding Annual Turnover i.e Total Value of Civil engineering
construction works), issued by Chartered Accountant (in prescribed
format as Form-E)
B= Value at current price level of the existing commitments and ongoing
works to be completed during the next 02 months ( period of completion
of work for which bids are invited ) as on 30 days prior to the last date
of online submission of tender; and
N= Number of years prescribed for completion of the works for which the
bids are invited.
Note :- In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of the
For Value of B in Bid capacity, bidder must submit online a self-certified
copy of statement for existing commitments and ongoing works in
prescribed format.
4.8 Even though the bidders meet the above qualifying criteria, they are subject
to be disqualified if they have:
- Made misleading or false representation in the forms, statements
and Attachments the submitted in proof the qualification requirements; and
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his
Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids I
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents
shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address indicated
in the invitation to bid. The Employer will respond to any request for clarification
which he received earlier than 15 days prior to the deadline for submission of bids.
Employer’s response will be published on website including a description of the
enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting
which will take place at the address, venue, time and date as indicated in the
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach
the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the
source of enquiry) and the responses given will be published without delay on the
tender website i.e. www.tender.nprocure.com. Any modification of the
bidding documents listed in sub-Clause 8.1 which may become necessary as a
result of the pre-bid meeting shall be made by the Employer exclusively through
the issue of an Addendum pursuant to Clause 10 and not through the minutes of
the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Preliminary Stage” and shall comprise
(i) Bid Security in the form specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section-2
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
preliminary as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder
will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid
Price submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing
to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his security for a period of the extension, and in
compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in
favor of Executive Engineer, Narmada Project Main Canal Dn.No.2, Gandhinagar
in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in
Volume III. (Bank Guarantee is applicable only for Bid Estimated Amount of
Crore and above) and Bank Guarantee of Schedule and Private Banks shall be
considered as per GoG Finance Department’s Circular No. FD/MSM/e-
file/4/2024/2859/D.M.O. Date 01/05/2025 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar
Department of Govt of Gujarat. Exemption Certificate is applicable only when
Registration Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as
non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end
of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and his
tender will be rejected. Punitive action will be taken on such contractors. (As per GoG
R&B Dept’s Gr. No. S/22/2017/639/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further
in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Preliminary Stage “and “Financial Bid” in separate parts to
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid
security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant
to Clause 22, in the presence of the Bidders or their representatives who choose to
attend at time, date and the place specified in Appendix in the manner specified in
Clauses 20 and 23.3, In the event of the specified date of Bid opening being declared
a holiday for the Employer, the Bids will be opened at the appointed time and
location on the next working day.
23.3 The “Preliminary Stage” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished does
not conform to the amount and validity period as specified in the invitation for bid
(ref. Column 4 and paragraph 3), and has not been furnished in the form specified in
Clause 16, the financial bid will not be opened.
23.4 (i) Deleted.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.3 will be announced. The bids of only these bidders will be
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.7 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.3 will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation,
bid comparison or contract award decision may result in the rejection of the Bidders’
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Preliminary Stage", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly
signed; (c) is accompanied by the required securities and; (d) is substantially responsive to
the requirements of the Bidding document. During the detailed evaluation of the “Financial
Bid”, the responsiveness of the bids will be further determined with respect to the
remaining bid conditions, i.e., priced bill of quantities, technical specifications, and
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially
responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements
of the Bidding documents or otherwise result in unsolicited benefits for the
Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not
be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the price
analyses, the Employer may require that the amount of the performance security set
forth in Clause 34 be increased at the expense of the successful /bidder to a level
sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest bidder
at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the
award of contract, without thereby incurring any liability to the affected bidder or
Bidder or any obligation to inform the affected Bidder or Bidders of the grounds for
the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer will
pay the Contractor in consideration of the execution, completion, and maintenance of
the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the Agreement
and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee from a
Bank in the form set forth in Section 8 (the “Performance Security”) for an
amount equal to 5% (five percent) of its Contract Price. In case of bids
mentioned below, the successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but
upto 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the
Estimated Project Cost and (ii) Contract Price offered by the selected
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of
the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 30% of the difference in the (i) Estimated Project
Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid
beyond 28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e- file/4/2024/2859/D.M.O. Date 01/05/2025 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of
the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated
in the Conditions of Contract, subject to maximum amount, as stated in the
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in completing for the
contract in question and will declare the firm ineligible, either indefinitely or for a
stated period of time, to be awarded a contract with National Highways Authority of
India/ State PWD and any other agencies, if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in completing for the contractor, or
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of
the Conditions of Contract.
APPENDIX TO ITB
Clause Reference With
respect to Section –I
1. The Name of the Employer is Executive Engineer, Narmada [ Cl.1.1]
Project Main Canal Dn.No.2, Gandhinagar
2. The last five financial years.
3. Deleted [Cl.4.5.3 (a)]
4. Value of Work is Rs.14,89,548=40
6. The cost of electric work is Rs……………
7. The cost of water supply / sanitary works is Rs…….
8. Deleted [Cl.4.5.6 ]
9. Price level of the financial year 2025-2026 [Cl. 4.5.2]
10. The pre-bid meeting will take place : 5th Floor, Committee Room, [Cl. 9.2.1]
Block No.12, SSNNL, New Sachivalaya, Gandhinagar
12. Address of the Employer: Block No.12, 9th Floor, New
Sachivalaya, Gandhinagar
14. The bid should be submitted latest by [Cl. 20.1 & 20.2]
As stated on online NIT
15. The bid will be opened at Executive Engineer, N.P.Main Canal [Cl. 23.1 ]
Dn.No.2, Gandhinagar
The Bank on online
Draft NIT of Executive Engineer, N.P.Main Canal
Dn.No.2, Gandhinagar.
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base
value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed
is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum Two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs
but more than Rs.5 lakhs.
4. Minimum One Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty
except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the
Deputy Executive Engineer-in-charge of the work the Name, Qualifications, copy of
marksheet, Color Photograph and the appointment order issued such engineers
engaged for this contract work. If 15 days after issue of work order such designated
Site Engineers do not resume or do not remain present on site of work, the recovery at
the rate of Rs.15,000-00 per month per Engineer will be made from the
bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for
the purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2020-2021
Works performed in the last five years (in Rs.
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Descriptio Place Contract Name & Address Value Contract Stipulated Value of Anticipated
n of works & State No. of (Rs. Cr) Period of Works* of
Employer Completio remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Experience
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Experience in
works Contractor similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is * ........................... )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
* Fill the name of Consultant
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for
such works have been rescinded, during last five years prior to the date of this
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by
the Department to verify this statement or regarding any (our) competence and
general reputation.
4. The Undersigned understands and agrees that further qualifying information
may be requested, and agrees to furnish any such information at the request of
the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
SAMPLE FORMAT FOR ANNUAL TURNOVER CERTIFICATE
(REGARDING TOTAL VALUE OF CIVIL ENGINEERING CONSTRUCTION WORKS
PERFORMED IN THE LAST FIVE YEARS)
(CLAUSE 4.5.3 (a) OF ITB & Clause 1.2 of Q.1)
This is to certify that we have verified Books of Account of M/s. __________________________
has registered as Civil Construction Firm and achieved the following Gross Annual
Turnover from Construction Activity for Last five financial years is as under:
Civil Engineering
Other Business Add GST Turnover
Sr.No. FinancialYear Construction works
Turnover (in Rs) Value(in Rs) including GST
Turnover(in Rs)
We have verified the above facts and figures from the Audited Books of the Firm or the
Audited Balance sheet and other relevant authentic records of the firm, for the last five
financial years and certify the same as True.
(Signature & stamp of the Chartered Accountant)
In above Form, the details given in above form is given in any other format but
containing a, b & c in same wording then the format shall be considered for
If any tender is to be opened between 1st April and 30th September, then their
provisional certificate of previous financial year shall be considered for
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s & Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions
of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by
the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of
the Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing Variations
to the Contract, awarding extensions of time, and valuing the Compensations
While dealing with the financial approval and items like extra items, quantity
variations and other such proposals involving the finance where the terms should
mean the competent authority under the organization having competency to deal
with and approve such cases.
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in
the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily coincide
with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male
also means female or neuter and the other way around. Heading have no
significance. Words have their normal meaning under the language of the
Contract unless specifically defined. The Engineer will provide instructions
clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to
the Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in
the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer. The Engineer shall obtain approval of competent
authority if needed as per delegation of powers of SSNNL.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in the
Schedule of other Contractor. The Contractors shall as refer to in the Contract
Data, also provide facilities and services for them as described in the
Schedule. The employer may modify the schedule of other contractors and
shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer
will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or
better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor shall
ensure that the person leaves the Site within seven days and has no further
connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as
they directly affect the execution of the Works, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or military
or usurped power, civil war, riot commotion or disorder (unless restricted to
the Contractor’s employees), and contamination from any nuclear fuel or
nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to
the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor should
have provided and recover the premiums the Employer has paid from
payments otherwise due to the Contractor or, if no payment is due, the
payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programme submitted by
the Contractor, as updated with the approval of the Engineer, and complete
them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary
or permanent work are subject to prior approval by the Engineer before their
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and
this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is
not handed over to the Contractor, then contractor/ Employer may fore-close
the contract. Contractor/Employer has to foreclose the work within 30 days
after lapse of 25%-time limit and after 30 days foreclosure option will be
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required by
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that the
decision was wrongly taken, the decision shall be referred to
COMPETENT AUTHORITY OF SSNNL within 14 days of the notification of the
Engineer's decision. If the issue is not resolved, any party can refer the
matter for conciliation within 15 days from the decision given by
such competent authority.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the COMPETENT AUTHORITY, both the parties have to
refer to the Director (CAD/Civil/Canal) SSNNL concern for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the COMPETENT AUTHORITY, both the parties
have to refer to the M.D., SSNNL for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If
the Contractor fails to refer a claim / dispute to the Higher Authority within
14 days of the notification of the Engineer's decision, the Contractor shall not
be entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with
monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved on
the timing of the remaining work including any changes to the sequence of
the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period,
the Engineer may withhold the amount stated in the Contract data from the
next payment after the date on which the overdue programme has been
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting
full supporting information. If the Contractor has failed to give early warning
of a delay or has failed to cooperate in dealing with a delay, the delay by this
failure shall not be considered in assessing the new Intended Completion
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the
extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of
the work, increase the Contract price or delay the execution of works. The
Engineer may require the contractor to provide an estimate of the expected
effect of the future event or circumstance on the contract price and
completion date. The estimate is to be provided by the Contractor as soon as
reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided
or reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 : Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion.
The Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of receipt
of the notice. In the case of failure on the part of the contractor, the Engineer-
in-charge may rectify or remove or re-execute the work at the risk & cost of
the contractor. The Engineer-in-charge shall be entitled to appropriate the
whole or any part of the amount of security deposit towards the expenses, if
any, Incurred by him in rectification, removal or re- execution. The Defects
Liability period shall be as under....
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or elapse
of 4 monsoon period following date of possession of building taken over by
user agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treate as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge
(a) For resurfacing work of road free maintenance guarantee period one
year from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee
from the certified date of completion. During this period the contractor
shall visit the site every three months along with the concerned
Section Officer / Deputy Executive Engineer and will examine the work
already carried out in this contract like road work, jungle cutting, side
shoulders, side gutter, road furniture, patta etc. and will prepare Km.
wise inspection report duly signed by all concerned and any defect
observed shall be done within 15 days by the contractor at his risk and
cost as per the direction of Engineer in charge. The contractor needs to
do videography of these visits and require to submit at the time of
release of FMG. If the B.T. surface during the maintenance period of
years is worn out then agency shall have to provide renewal coating as
per tender item as directed by the Engineer-in- charge. The amount
equivalent to 5% of each running bill shall be withheld and will be
released after the free maintenance guarantee period (i.e. 4 years) is
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
33.2.1 The flakiness and elongation index (combined) for coarse aggregates
under no circumstances shall exceed the allowable limit set forth in the
relevant clause for the material in question.
33.2.2 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard
stones, sign boards etc. are completed in all respect by the contractor.
After completion of the miscellaneous items, the above said 2%
withheld amount shall be released.
33.2.3 Videography for the surface under Maintenance Guarantee is to be
done as per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for
the work costing more than Rs. 5.00Crore.
33.2.4 Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by
engineer’s representative) by contractor in writing, Rs.2,00,000/- shall
be withheld. The qualified quality Engineer shall be deployed
exclusively for this contract by the contractors. If quality Engineer is not
deployed by contractor within one month after the date of work order,
the amount equivalent to Rs.20,000 per month shall be recovered till
the actual deployment of quality engineer. The amount so recovered
towards the deployment of quality engineers shall not be refunded.
33.2.5 Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
33.2.6 Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his
own risk and cost, the existing lane(s) of the road so that the traffic
worthiness and safety thereof are at no time materially inferior as
compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and maintenance
works for this purpose; provided that the Contractor may, at his cost,
interrupt and divert the flow of traffic if such interruption and diversion
is necessary for the efficient progress of works and conforms to Good
Industry Practice; provided further that such interruption and
diversion shall be undertaken by the Contractor only with the prior
written approval of the Executive Engineer which approval shall not be
unreasonably withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe operation
33.3 The Engineer shall check the Contractor’s work and notify the
Contractor of any defects that are found. Such checking shall not affect
the Contractor’s responsibilities the Engineer may instruct the
Contractor to search for a Defect and to uncover and test any work that
the Engineer considers may have a Defect.
33.4 Free maintenance guarantee period for works of construction of
Canals (including UGPL). Canal Structures, Canal Roads. Hydro
Electrical & Mechanical works, Solar, Building works and
Maintenance & Operations.
(a) For the work of Canals(including UGPL), Canal Structures, Canal
Roads, Hydro Electrical & Mechanical works, Solar, Building
works and Maintenance & Operations free maintenance
guarantee period one year from the date of completion
(b) During this period the contractor shall visit the site every three
months along with the concerned Section Officer/ Deputy
Executive Engineer and will examine the work already carried
out in this contract and attend all defects such as filling rain cuts
in banks. Jungle cutting, side gutter and all other defects in all
structures and its components etc. and will prepare reach wise
inspection report duly signed by all concerned and any defect
observed shall be done within 15 days by the contractor at his
risk and cost as per the direction of Engineer in charge. The
contractor needs to do videography of these visits and require to
submit at the time of release of Performance Bond/Performance
Security related to Free Maintenance Guarantee. The amount
equivalent to 5% of each running bill shall be withheld and will
be released after the free maintenance guarantee period (i.e.
years) is over.
However, this amount shall be released against fixed deposit or
bank guarantee pledged in the name of Executive Engineer after
completion certificate of work is issued,
(1) The materials used for the works during construction shalt be as
per Indian standards/Technical Specifications of the respective
item and all the test as per respective Indian Standards/
Technical Specifications of the respective item shall be conducted
and ensured that the test results shall be meet the criteria
specified in the relevant clause/specifications for the maternal in
(2) 2% of the amount shall be withheld till the miscellaneous items
like WBM road, testing of canals, side gutters, km stones, canal
data board, marble data plates, gauge plates, gate work etc. and
in case of UGPL, works, trial run, other ancillary work viz,
strainer, ladder, pump, well-cover, performance test trial run of
Hydro Mechanical and Electrical works etc. are completed in all
respect by the contractor. After completion of the miscellaneous
items, the above said 2% withheld amount shall be released.
(3) Videography for the works under Maintenance Guarantee is to
be done as per Govt. letter No.: SSR/10/2015-16/26/C, Dtd
26/11/15 for the work costing more than estimated cost of Rs.
(4) Setting up of adequate laboratory & deployment of quality
engineers. The contractor shall have to set up the laboratory with
adequate equipment. Till the setting up of adequate laboratory is
completed & reported of this to the engineer (subject to due
verification by engineer's representative) by contractor in
writing Rs 2,00,000/- shall be withheld. The qualified quality
Engineer shall be deployed exclusively for this contract by the
contractors. If quality Engineer is not deployed by contractor
within one month after the date of work order, the amount
equivalent to Rs 20,000 per month shall be recovered till the
actual deployment of quality engineer. The amount so recovered
towards the deployment of quality engineers shall not be
(5) For finalizing the work, the work carried-out shall be randomly
checked by core test for the canal lining works and density tests
for embankment works will have performed randomly as per
SSNNL G.R. No. મ.ુ ઇ/ગનુ િ/િર્મદા ગ.ુ નિ/પીબી-૨/૬૮/૨૦૧૧ તારીખ: ૨/૬/૨૦૧૧
before final bill is paid
(6)Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain; at
his own risk and cost; works for safety are at no time materially
inferior as compared to their condition 10 (ten) days prior to the
date of the Agreement, and shall undertake the necessary repair
and maintenance works for this purpose, provided that the
Contractor may at his cost is necessary for the efficient progress
of works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken
by the Contractor only with the prior written approval of the
Executive Engineer which approval shall not be unreasonably
withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe
operation of the work.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that
it does, the Contractor shall pay for the test and any samples. If there is no
defect the test shall be a Compensation Event.
34.2 For Confirmatory tests of the testing done by the agencies 1% of the amount of
work done should be deducted from R.A. bill of the contractor for testing
the quality of material workmanship, irrespective of actual charges.
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the
engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined in
the contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on
the same conditions in all respects on which he agreed to do the main work
and at the same rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out as
(i) At the rate derived from the item within the contract which is comparable to
the one involving additional or altered class of work; where there are more
than one comparable items, the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the
year in which the tender was received. If the Schedule of rates of the Division
does not contain all the items, the percentage increase or decrease of the
tender shall be calculated considering such items which were included in the
“Scheduled Rates” of the division for the year and for materials consumed on
such item the rate to be charged would be the basic rate taken into account
for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities on
the basis of detailed rate analysis after hearing the contractor before a
Committee of two Superintending Engineers stationed at the same place or
the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon,
then the contractor shall within seven days of the date of receipt by him of the
order to carry out the work, inform the Engineer-in-charge of the rate, which it is
his intention to charge for such class of work and if the Engineer in charge does
not agree to this rates, he shall by notice in writing be at liberty to cancel his order
to carry out such class of work and arrange to carry it out in such manner as he may
consider it advisable, provided always that if the contractor shall commence work
or incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate
or rates as shall be fixed by the Engineer-in-charge after obtaining approval of
the Competent Authority if needed as per delegation of Powers of SSNNL. In
the event of the dispute, the decision of the Competent Authority of SSNNL
shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by
the competent authority, the alternation above referred to shall be within the
scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to
such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days
and certify the amount to be paid to the Contractor after taking in to account
any credit or debit for the month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in the
light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts certified
by the Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract
to the Contractor will be made by the Employer. Hence, it is the responsibility
of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and prices
in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will approve
EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in
the tax structure by Government after due date of bid submission will be
compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the
tax structure after bid submission. If the contractor fails to provide such
information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date
or extensions granted by the Engineer and shall not apply to the work
carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month. It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed to
include amounts to cover the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed
and the Engineer has certified that all Defects notified by the Engineer to the
Contractor before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer shall
consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of the
Contract Price and Contractor furnishes an irrevocable and unconditional
Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to
day beyond the scheduled / extended Defects Liability Period. On completion
of the whole works, the contractor has however an option to submit a fresh
irrevocable and unconditional Bank Guarantee for an amount equal to 5% of
the total value of work executed substantially in the format of Bank Guarantee
for Performance Guarantee enclosed with SBD and valid up to 60 days beyond
the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per
day stated in the Contract Data for each day that the Completion Date is later
than the Intended Completion Date (for the whole works or the milestone as
stated in the contract data). The total amount of liquidated damages shall not
stated in the contract data). The total amount of liquidated damages shall not
exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment of
liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages
by the Contractor by adjusting the next payment certificate. The Contractor
shall not be entitled for any interest on the over payment calculated from the
date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in
the tender, then the contractor shall pay to the employer the relevant sum
stated in the Contract Data as Liquidated damages for such default and not as
penalty for everyday or part of day which shall elapse between relevant time
for completion and the date stated in the taking over certificate of the whole
of the works on the relevant section, subject to the limit stated in the contract
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the
Works or of a Section, the liquidated damages for delay in completion of the
remainder of the Works or of that Section shall, for any period of delay after
the date stated in such Taking-Over-Certificate, and in the absence of
alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or
Section, as applicable. The provisions of this Sub-clause shall only apply to the
rate of liquidated damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall
pay to the contractor a sum stated in Contract Data as bonus for every
completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all
items of works as stipulated in the contract, including variations ordered by
the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time
limit of the works is equal or more than 6 months. The bonus would be paid
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the Contract
Date by the date stated in the Contract Date, against provision by the
Contactor of an Unconditional Bank Guarantee in a form and by a bank
acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until the
advance payment has been repaid, but the amount of the guarantee shall be
progressively reduced by the amounts repaid by the Contractor. The
Mobilization advance would be deemed as interest bearing advance at an
interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall be
taken of the advance payment or its repayment in assessing valuations of
work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids)
shall be provided to the Employer no later than the date specified in the
Letter of Acceptance and shall be issued in an amount and form and by a bank
or surety acceptable to the Employer, and denominated in Indian Rupees. The
performance Security shall be valid until a date 60 days from the date of
expiry of Defects Liability Period and the additional security for unbalanced
bids shall be valid until a date 28 days from the date of issue of the certificate
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion
of the works and the Engineer will do so upon deciding that the work is
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final settlement
total amount that the Contractor considers payable as full and final settlement
of all claims under the Contract for items before the end of the Defects
Liability Period. The Engineer shall issue a Defect Liability Certificate and
certify any final payment that is due to the Contractor within 56 days of
receiving the Contractor's account if it is correct and complete. If it is not, the
Engineer shall issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is still
unsatisfactory after it has been resubmitted, the Engineer shall decide on the
amount payable to the Contractor and issue a payment certificate, within
days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at
liberty to restrict the final payment of BOQ items to the lowest amount
evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be
made at the rates approved by the Employer, within 90 days from the
physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the Contract
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from
payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence
a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by
the Contractor, the Engineer shall issue a Certificate for the value of the work
done less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to
the work not completed as indicated in the Contract data. Additional
Liquidated Damages shall not apply. If the total amount due to the Employer
Liquidated Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor the difference shall be a debt
payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought
by the contractor and available at site, the reasonable cost of removal of
equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and
less advance payment received up to the date of the certificate, less other
recoveries due in terms of the contract and less taxes due to deducted at
source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because
of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving
this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make
his own arrangements for the engagement of all staff and labour, local or
other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the Engineer
may prescribe, showing the staff and the numbers of the several classes of
labour from time to time employed by the Contractor on the site and such
other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-contractor shall
abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or
local authority and any other labour law (including rules), regulations, bye
laws that may be passed or notifications that may be issued under any labour
law in future either by the State or the Central Government or the local
authority. Salient features of some of the major labour laws that are
applicable to the construction industry are given below. The Contractor shall
keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of
the provisions of any Act or rules made thereunder, regulations or
notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money
due to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any
sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in
case of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing
10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for
certain welfare measures to be provided by the Contractor to contract labour and
in case the Contractor fails to provide, the same are required to be provided, by
the Principal Employer by Law. The principal Employer is required to take
Certificate of Registration and the Contractor is required to take license from the
designated Officer. The Act is applicable to the establishments or Contractor of
Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if
the employment is a scheduled employment. Construction of Building, Roads,
Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to
be paid, when it will be paid and what deductions can be made from the wages
of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not making
discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages
to employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted
for five years in certain circumstances. Some of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on
matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the Act
have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in Building
and Construction Industry.
N) Inter – St at e M igra nt wo rkmen’s (Regul a t ion of Emp lo yment &
Conditions of service) Act 1979:- The Act is applicable to an establishment
5 or more inter-state migrant workmen through an intermediary (who has
recruited workmen in one state for employment in the establishment situated in
another state).The inter-state migrant workmen, is an establishment to which
this Act becomes applicable, are required to be provided certain facilities such as
housing, medical aid, traveling expenses from home upto the establishment and
O) The Building and Other Construction workers (Regulation of employment
and Conditions of Service) Act 1996 and the Cess Act of 1996:- All the
establishments who carry on any building or other constructions work and
employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of
the cost of construction as may be modified by the government. The Employer of
the establishment is required to provide safety measures at the Building or
construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace
etc. The Employer to whom the Act applies has to obtain a registration certificate
from the Registering Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof
from time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental
management plan for best energy use, waste management, the reduction
of pollution as in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
65.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to COMPETENT
AUTHORITY OF SSNNL within 14 days of the notification of the Engineer's
decision. If the issue is not resolved, any party can refer the matter for
conciliation within 15 days from the decision given by such Competent
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the COMPETENT AUTHORITY, both the parties have to
refer to the Director (CAD/CIVIL/CANAL), SSNNL concerned for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the COMPETENT AUTHORITY, both parties have to
refer to the MD,SSNNL, Government of Gujarat for the conciliation
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract
Dispute Arbitration Tribunal. If the Contractor fails to refer a claim /
dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any
additional payment/claim if he doesn’t follow the above sequence in
stipulated time. However, during such period, he would not stop the
work in any case.
Clause Reference With
respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Executive Engineer
Address: Block No.12, 9th Floor, New Sachivalaya, Gandhinagar
Name of authorized Representative (will be intimated later)
2. The Engineer is Executive Engineer, N.P.Main Canal Dn.No.2,
Name of Authorized Representative: Shri N.V.Bhavsar
3. The Defects Liability Period is 12 months from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice [CL.1.1]
to proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
02 Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e. 25 %15 days.
Milestone 2 i.e. 50 % 30 days.
Milestone 3 i.e. 75 % 45 days.
Milestone 4 i.e. 100 % 60 days.
6. The Site is located at Narmada Main Canal, Vill. Limbadiya, Ta. & Dist. [CL.1.1]
7. The name and identification number of the Contract is: As per tender [CL.1.1]
8. The works consist of Resurfacing Approach road of Limbadiya- [CL.1.1]
Ranasan (UVRB) by laying WMM, BM and SDBC and Installation of
Crash Barrier at in approaches Ch. 225.875 km of Narmada Main
Canal with items as per B.O.Q. The works shall, inter alia, include the
following, as Specified or as directed:
(A) Road Works :
Site clearance; setting out and layout widening of existing carriageway and
strengthening including camber corrections; construction of new road/ Parallel
service road; bituminous pavements remodeling/construction of Junctions,
intersections, bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items; construction/extension of cross
drainage works, bridge, approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of various components of the
works; rectification of The defects in the completed works during the Defects
Liability Period; submission of “As- built’’ drawings and any other related
documents; and other item of work as may be required to be carried out for
completing the work in accordance with the drawings and the provisions of the
contract and to ensure safety.
( B ) Bridge Works
provision of foundations, piers abutments and bearing; prestressed/reinforced
cement concrete superstructure; wearing coat, hand railings, expansion joints,
approach slabs, drainages spouts/ downtake pipes, arrangements for fixing light
posts, water mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.; all aspects
of quality assurance; clearing the site and handing over the works on
completion; rectification of the defects during the Defects Liability Period and
submission of “As-built” drawings and other related documents; and other items
of work as may be required to be carried out for completing the works in accordance
with the drawings and the provisions of the contract and to Insure safety
(C) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the Bid
10. The following documents also form part of the Contract: [CL.2.3(9)]
As per clause 2-3
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be 2nd day from Letter of Acceptance [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 01 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs 0.50 lakhs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the
course of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil
to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps,
etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures, monuments
interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the
month under consideration due to changes in rates for
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published by
the Labour Bureau, Ministry of Labour, Government of
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for
Ordinary Portland Cement for the month under
consideration as published by Office of the
Economic Adviser, Department for Promotion
of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pc = Percentage of cement component of
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi = The official retail price of bitumen of IOC depot at the nearest
centre for the 15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to
the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of
IOC at the nearest centre for the 15th day of the month of the under
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has
been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts
has been chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the contractor
shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than
cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
1. Labour - Pl . 10.19 %
2. Cement – Pc 0.00 %
3. Steel - Ps 0.00 %
4. Bitumen - Pb 13.52 %
6. Plant & Machinery Spares Pp. 8.26 %
7. Other Materials - Pm. 68.03 %
25. The proportion of payments retained (retention money) shall be 6% {CL. 48}
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
Completion (wherever specified In
item 6 of Contract data) (1/2000)th of
initial contract price for #5 km
Section, rounded off to the nearest
thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given
as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions to
i Mobilization 10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor
may furnish four bank guarantees of
2.5 % of each valid for the full
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is
equipment. Total amount satisfied That the equipment is
equipment. Total amount satisfied That the equipment is
will be subject to a required for performance of the
maximum of 5% of the contract) and on submission of
Contract Price unconditional Bank Guarantee for
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall
commence in the next Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than 20 percent
of the Contract Price or 6 (six) months from the date of payment of first
installment of advance, whichever period concludes earlier, and shall be made at
the rate of 20 percent (collectively for both Mobilization Advance and
Equipment Advance) of the amounts of all Interim Payment Certificate until
such time as the loan has been repaid, always provided that the loan shall be
completely repaid prior to the expiry of the original time for completion pursuant
to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL. 52}
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be
an unconditional Bank Guarantee of the type as presented in Section 8 of the
Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58}
are required within 28 days of the issue of certificate of completion of the whole
or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by
the Date of completion required is Rs 5.0 Lakhs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60}
the Employer’s additional cost for completing the Works shall be 20 percent.
TECHNICAL SPECIFICATION
Technical Specification
Dismantling the existing road surface including disposing off the dismantled
materials and stacking the useful material as directed
Cement concrete road
The work to be done under this item shall consist of dismantling of one or more
patches/damaged panels of road slab / C.C. lining in canal bed/slope having
different thickness. The work also includes to dismantling the concrete other than
lining work as directed by Engineer-in-charge. The work consists of breaking up of
C.C. lining work including all relevant items.
Before dismantling is taken up the patches of damaged panels required to be
dismantled shall be marked in bed and slope and proper shoring and under-
pinning shall be provided for the safety of the adjoining C.C. lining. The work shall
be carried out in such a way that no damage is caused to the adjoining
property/adjoining lining.
Dismantling shall be commenced in a systematic manner. All materials, which are
likely to be damaged, shall be dismantled first. The dismantled materials shall be
disposed off outside the canal bank as directed by Engineer-In-Charge.
Any serviceable material obtained during dismantling shall be separated out and
stacked properly as directed.
On completion of the work, the site shall be cleared off all debris, rubbish and
cleaned as directed.
No explosives shall be allowed for dismantling.
Contractor shall have to note that the NMC may be in a flowing condition. So the
proper care shall be required to be taken during dismantling.
2 Measurement and Payment (Item No.1)
Measurement of dismantling of C.C. / R.C.C. shall be made on square metre
basis. The rate includes cost of all labours and tools used for dismantling,
disposing off of all stuff as directed.
Providing & laying 50 mm thick compacted bituminous macadam using B.T. chips (As
per MORT&H required gradation) and mixing binder asphalt of grade (VG 30) at rate of
3.40 % by total weight of premix and using emulsion asphalt (RS - 1) for tack coat @
kg / 10 m2 and mixing by contractor’s own drum mix plant & machinery process and
laying by paver finisher including consolidation with vibratory roller 8 to 10 tonne. and
providing and operating plant & machinery fuel, oil, lubricant, cost of all materials and
labour charges including flushing stone dust etc. complete.
MORTH Specification Clause No. 504 (Fifth revision)
504 BITUMINOUS MACADAM
This work shall consist of construction in a single course having 50mm thickness
compacted crushed aggregates premixed with a bituminous binder or a previously
prepared base to the requirements of these Specifications. Since the Bituminous macadam
is an open graded mix, there is a potential that it may trap water or moisture vapour
within the pavement system. Therefore, adjacent layer (Shoulders) should have proper
drainage quality to prevent moisture- induced damaged to the BM.
504.2 Materials
504.2.1 Bitumen:
The bitumen shall be viscosity graded VG-30, paving bitumen complying with Indian
Standard Specifications for “Paving Bitumen” IS:
504.2.2 Coarse aggregates:
The coarse aggregates shall consist of crushed rock, or other hard material retained on
the 2.36 mm sieve. It shall be clean, hard, durable and soft organic and cubical shape, free
from dust and soft organic and other deleterious matter. The aggregated shall satisfying
the physical requirements set forth in Table 500.6. Where crushed gravel is proposed for
use as aggregate, not less than 90 percent by weight of the crushed material retained on
4.75 mm sieve shall have at least two fractured faces resulting from crushing operation.
Before approval of the source, the aggregates shall be tested for stripping. Where the
Contractor’s selected source of aggregates have poor affinity for bitumen, as a condition
for the approval of that source, the bitumen shall be treated with approved anti-Stripping
agents, as per the manufacturer’s recommendations, without additional payment.
504.2.3 Fine aggregates:
Fine aggregates shall consist of crushed or naturally occurring mineral material, or a
combination of the two, passing 2.36 mm sieve and retained on 75 micron sieve. It shall
be clean, hard, durable and free from dust, and soft organic and other deleterious matter.
Natural sand shall not be used in the binder cost.
TABLE 500-6 PHYSICAL PROPERIES OF COARSE AGGREGATES
Property Test Requirement Test Method
Cleanliness Grain size analysis Max 5% passing 75 IS : 2386 Part
Particle shape Combined Flakiness and Max 35% IS : 2386 Part
Elongation Indices
Strength Los Angeles Abrasion Value or Max 40% IS : 2386 Part IV
Aggregate Impact Value Max 30% IS : 2386 Part IV
Durability Soundness: (Sodium or 5 Cycles
Magnesium ) Max 12% IS : 2386 Part V
Sodium Sulphate
Magnesium Sulphate Max 18% IS : 2386 Part V
Water Water absorption Max 2% IS : 2386 Part III
Stripping Coating and Stripping of Minimum retained IS :
Bitumen Aggregate. coating 95%
Water Retained Tensile Strength Min 80% AASHTO
If the minimum retained Tensile Strength falls below 80%, use of anti-striping agent is
recommended to meet the minimum requirements.
504.2.4 Aggregate Grading and binder content
The combined grading of the coarse aggregates and fine aggregates, when tested in
accordance with IS:2386 Part 1, wet sieving method, shall conform to limits given in Table
500-7. The type and quantity of bitumen and appropriate thickness is also given in Table
504.2.5 Proportioning of Material
The combined aggregate grading shall not vary from the lower limit on one sieve to the
higher limit on the adjacent sieve to avoid gap grading. The aggregate may be
proportioned and blended to produce a uniform mix complying with the requirements in
Table 500-7. The blindercontent shall be within a tolerance of ± 0.3 percent by weight of
total mix when individuals specimens are taken for quality control tests in accordance
with the provisions of Section
504.3 Construction Operation
Table 500-7 : Aggregate Grading & Bitumen Content
Nominal maximum 40 mm 19 mm
aggregate size*
Layer thickness 80-100 mm 50-75 mm
IS Sieve size (mm) Cumulative % by weight of total aggregate passing
Bitumen content ** 3.3** 3.4**
percent by mass of total
*Nominal maximum aggregate size is the largest specified sieve size upon which any of
the aggregate material is retained.
** Corresponds to specific gravity of the aggregate being 2.7. In case aggregates have
specific gravity more than 2.7, bitumen content can be reduced proportionately. Further,
for regions where highest daily mean air temperature is 30ºC or lower and lowest daily
mean air temperature is -100C or lower, the bitumen content may be increased by
To determine this combine proportion, the flaky stone from a representative sample
should first be separated out. flakiness Index is weight of flaky stone metal divided by
stone sample. Only the elongated particles be separated out from the remaining ( Non
Flaky ) stone metal. Elongation Index is weight of elongated particles divided by total non
flaky particles. The values of Flakiness Index and Elongation Index so found are added up.
If the minimum retained Tensile Strength falls below 80%, use of anti-striping agent is
recommended to meet the minimum requirements.
504.3.1 Weather and seasonal limitations:
Laying shall be suspended:
i. In presence of standing water on the surface;
ii. When rain is imminent, and during rains, fog or dust storm;
iii. When the base/binder course is damp;
iv. When the air temperature on the surface on which it is to be laid is less than 100C
for mixes conventional bitumen and is less than 150C for mixes with modified bitumen;
v. When the wind speed at any temperature exceeds the 40 km per hour at 2 m
504.3.2 Preparation of the base:
The base on which bituminous macadam course is to be laid shall be prepared, shaped
and compacted to the required profile in accordance with Clauses 501.8 and 902.3 as
appropriate, and a prime coat, shall be applied in accordance with Clause 502 where
specified, or as directed by the Engineer-in-charge.The surface shall be thoroughly swept
clean by a mechanical broom, and the dust removed by compressed air. In locations
where mechanical broom cannot get access, other approved methods shall be used as
directly by the Engineer-in-charge.
504.3.3 Tack coat:
A tack coat in accordance with Clause 503 shall be applied as required under the Contract,
or as directed by the Engineer-in-charge.
The work shall consist of the application of a single coat of low viscosity liquid bituminous
material to existing bituminous, cement concrete or primed granular surface preparatory
to the superimposition of a bituminous mix, when specified in the Contract or as
instructed by the Engineer. The work shall be carried out on a previously prepared
surface in accordance with Clause 501.8.
503.2 Materials
The binder used for tack coat shall be either Cationic bitumen emulsion (RS 1) complying
with IS:8887 or suitable low viscosity paving bitumen of VG 30 grade conforming to IS:73.
503.3 Weather and Seasonal Limitations
Bituminous material shall not be applied during a dust storm or when the weather is
foggy, rainy or windy or when the temperature in the shade is less than 10oC. Where the
tack coat consists of emulsion, the surface shall be slightly damp, but not wet. Where the
tack coat is of cutback bitumen, the surface shall be dry.
503.4 Construction
503.4.1 Equipment
The tack coat shall be applied by a self-propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a specified rate. Hand spraying shall not
be permitted except in small areas, inaccessible to the distributor, or narrow strips, shall
be sprayed with a pressure hand sprayer, or as directed by the Engineer.
503.4.2 Preparation of Base
The surface on which the tack coat is to be applied shall be clean and free from dust, dirt,
and any extraneous material, and be otherwise prepared in accordance with the
requirements of Clauses 501.8. The granular or stabilized surfaces shall be primed as per
Clause 502. Immediately before the application of the tack coat, the surface shall be
swept clean with a mechanical broom, and high pressure air jet, or by other means as
directed by the Engineer.
503.4.3 Application of Tack Coat
The application of tack coat shall be at the rate specified in Table 500-5, and it shall be
applied uniformly. If rate of application of Tack Coat is not specified in the contract, then
it shall be the rate specified in Table 500-5. No dilution or heating at site of RS1 bitumen
emulsion shall be permitted. Paving bitumen if used for tack coat shall be heated to
appropriate temperature in bitumen boilers to achieve viscosity less than 2 poise. The
normal range of spraying temperature for a bituminous emulsion shall be 20oC to 70oC
and for cutback, 50oC to 80oC. The method of application of tack coat will depend on the
type of equipment to be used, size of nozzles, pressure at the spray bar, and speed or
forward movement. The Contractor shall demonstrate at a spraying trial, that the
equipment and method to be used is capable of producing a uniform spray, within the
tolerances specified.
Table 500-5: Rate of Application of Tact Coat
Type of Surface Rate of Spray of Binder in Kg per sq.m
Bituminous surfaces 0.20 –
Granular surfaces treated with primer 0.25 –
Cement concrete pavement 0.30 –
503.4.4 Curing of Tack Coat
The tack coat shall be left to cure until all the volatiles have evaporated before any
subsequent construction is started. No plant or vehicles shall be allowed on the tack coat
other than those essential for the construction.
503.5 Quality Control of Work
For control of the quality of materials and the works carried out, the relevant provisions
of Section 900 shall apply.
503.6 Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance
with the provisions of Clause
504.3.4 Preparation and transportation of the mix:
The provisions of Clauses 501.3 and 501.4 shall apply.
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity
and capable of yielding a mix of proper and uniform quality with thoroughly coated
aggregates. Appropriate mixing temperature are given in Table 500–2 of these
Specifications. The difference in temperature between the binder and aggregate shall at
no time exceed 140 C. in order to ensure uniform quality of the mix and better coating of
aggregates, the hot mix plant shall be calibrated from time to time. The essential features
of the hot mix plant are given in Annexure A of IRC:
Table 500- 2: Mixing, Laying and Rolling Temperatures for Bituminous Mixes
(Degree Celsius)
Bitumen Bitumen Aggregate Mixed Laying *Rolling
Viscosity Temperature Temperature Material Temperature Temperature
Grade Temperature
*Rolling must be completed before the mat cools to these minimum temperatures.
If a continuous type mixing plant is used, the Contractor must demonstrate by laboratory
analysis that the cold feed combined grading is within the grading limits specified for that
bituminous bound material. In the case of a designed job mix, the bitumen and filler
content shall be derived using this combined grading.
501.4 Transporting
Bituminous materials shall be transported in clean insulated and covered vehicles. An
asphalt release agent, such as soap or lime water, may be applied to the interior of the
vehicle to prevent sticking and to facilitate discharge of the material.
504.3.5 Spreading:
Prior to spreading the mix, the base shall be prepared by carrying out the required
operations as per Clause 501.8 depending upon the site conditions. Except in areas where
paver cannot get access, bituminous materials shall be spread, levelled and temped by an
approves self-propelled paving machine equipped with an electronic sensing device. The
essentials features of the paver finisher shall conform to Annex A of IRC :27. As soon as
possible after arrival at site, the materials shall be supplied continuously to the paver and
laid without delay.
The rate of delivery of material to the paver shall be regulated to enable the paver to
operate continuously. The travel rate of the paver, and its method of operations, shall be
adjusted to ensure an even and uniform flow of bituminous material across the screed,
free from dragging, tearing and segregation of the material. In areas with restricted
space(such as confined space, footways, of irregular shape and varying thickness,
approaches to expansion joints etc.) where paver cannot be used, the material shall be
spread, raked and leveled with suitable hand tools by trained staff.
The minimum thickness of material laid in each paver pass shall be in accordance with the
minimum values given in the relevant parts of these Specifications. When laying binder
course or wearing course approaching an expansion joint of a structure, machine laying
shall stop 300mm short of the joint. The remainder of the pavement up to the joint, and
the corresponding area beyond it, shall be laid by hand, and the joint of joint cavity shall
be kept clear of surfacing material.
Bituminous material, with temperature greater than 145oC, shall not be laid or deposited
on bridge deck waterproofing systems, unless precautions against heat damage have been
approved by the Engineer.
.504.3.6 Rolling:
Bituminous materials shall be laid and compacted in layers which enable the specified
thickness, surface level, regularity requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying.
Compaction shall be substantially completed before the temperature falls below the
minimum rolling temperatures stated in the relevant part of these Specifications. Rolling
of the longitudinal joints shall be done immediately behind the paving operation. After
this, rolling shall commence at the edges and progress towards the centre longitudinally
except that on super elevated and unidirectional cambered portions, it shall progress
from the lower to the upper edge parallel to the centre line of the pavement. Rolling shall
continue until all roller marks have been removed from the surface. All deficiencies in the
surface after laying shall be made good by the attendants behind the paver, before initial
rolling is commenced. The initial or breakdown rolling shall be done with 8-10 tonnes
dead weight smooth-wheeled rollers. The intermediate rolling shall be done with 8-10
tonnes static weight or vibratory roller or with a pneumatic tyre roller of 12 to 15 tonnes
weight, with a tyre pressure of at least 0.56MPa. The contractor shall demonstrate the
efficiency of the equipment propose to be used by carrying compaction trials. The
procedure for side trial shall be submitted to the Engineer for approval. The finish rolling
shall be done with 6 to 8 tonnes smooth wheeled tandem rollers. The rolling shall be
continuous until the specified compaction is achieved.
Where compaction is to be determined by density of cores the requirements to prove the
performance of rollers shall applying order to demonstrate that the specified density can
be achieved. In such cases the Contractor shall specified the plant, and the method by
which he intends to achieve the specified level of compaction and finish at temperatures
above the minimum specified rolling temperature. Laying trials shall then demonstrate
the acceptability of the plant and method used.
Bituminous materials shall be rolled in a longitudinal direction, with the driven rolls
nearest the paver. The roller shall first compact material adjacent to joints and then work
from the lower to the upper side of the layer, overlapping on successive passes by at least
one-third of the width of the rear roll or, in the case of a pneumatic tyre roller, at least the
nominal width of 300 mm.
In portions with super-elevated and uni-directional camber, after the edge has been
rolled, the roller shall progress from the lower to the upper edge.
Rollers should move at a speed not more than 5 km per hour. The roller shall not be
permitted to stand on pavement which has not been fully compacted, and necessary
precautions shall be taken to prevent dropping of oil, grease, petrol/diesel or other
foreign matter on the pavement either when the rollers are operating or standing. The
wheels of roller machine shall be in good working order to prevent the mix from adhering
to the wheels. Only sufficient moisture to prevent adhesion between the wheels of rollers
and the mix should be used. Surplus water shall not be allowed to stand on the partially
compacted pavement.
504.4 Surface Finish and Quality Control of Work
The surface finish of the completed construction shall conform to the requirements of
Clause 902. For control of the quality of materials and the works carried out, the relevant
provisions of Section 900 shall apply.
504.5 Protection of the Layer
The bituminous macadam shall be covered with either the next pavement course or
wearing course, as the case may be, within a maximum of forty-eight hours. If there is to
be any delay, by the contractor the course shall be covered by a seal coat to the
requirement of clause 511 before opening to any traffic. The seal coat (Type-B) in such
cases shall be considered incidental to the work and shall not be paid for separately.
504.6 Measurement for Payment
Bituminous macadam shall be measured as finished work in metric tonnes.
The contract unit rate for bituminous macadam shall be payment in full for carrying out
the required operations as specified.
(i) Preparation of the surface to receive the material.
(ii) Providing all materials to be incorporated in the work including arrangement for
stock yards, all royalties, fees, rents where necessary and all leads and lifts;
(iii) Mixing, transporting, laying and compacting the mix, as specified.
(iv) All labour, tools, equipment, plant including installation of hot mix plant, power
supply units and all machinery, incidental to complete the work to these
Specifications;
(v) Carrying out the work in part width of the road where directed;
(vi) Carrying out all tests for control of quality; and
(vii) The rate shall cover the provision of bitumen, with the provision that the increase
in actual percentage of bitumen used will not be entertained for the payment.
(viii) The rates for premixed material are to include for all wastage in cutting of joints
(ix) The rates are to include for all necessary testing, mix design, transporting and
testing of samples, and cores. The Contractor can arrange to carry out necessary
testing except field test at an outside Laboratory, approved by the Engineer-in-
charge, and all costs incurred are deemed to be included in the rate quoted after
obtaining permission of Engineer-in-charge.
(x) The quoted rate is inclusive of the cost of tack coat.
Providing &laying 25 mm thick Semi Dense Bituminous Concrete using B.T. chips as per
MORT&H required gradation by drum mix hot laid process using asphalt of grade VG-30
@ 50 kg/MT for mixing 5% by total weight of mix and laying emulsion (RS -1) tack coat @
2.50 kg / 10 m2 including heating the asphalt and aggregates by contractor’s own drum
mix plant and machinery, transporting the mix and spreading the same with paver
finisher and consolidation with power roller of 8 T to 10 T including providing and laying
uniformly tack coat, operating plant & machinery equipment including cost of all
materials asphalt, aggregate, fuel, oil, lubricants, labour charges and flushing of stone dust
MORTH Specification 508 Fourth Revision.
508 SEMI DENSE BITUMINOUS CONCRETE
This clause specifies the construction of Semi Dense Bituminous Concrete, for use in
wearing / binder and profile corrective courses. This work shall consist of construction in
a single layer of semi dense bituminous concrete on a previously prepared bituminous
bound surface. A single layer shall be 25 mm in thickness.
508.2 Materials
508.2.1 Bitumen:
The bitumen shall be paving bitumen of grade VG-30 complying with Indian Standard
Specification for paving Bitumen IS:73 and of the penetration indicated in Table 500-15,
for semi dense bituminous concrete, or as otherwise specified in the contract. Guidance on
the selection of an appropriate grade of bitumen is given in The Manual for Construction
and Supervision of Bituminous Works.
Viscosity Grade (VG) Bitumen Specification IS 73:2006
Characteristics VG-30
Absolute Viscosity 60oC, poises, min
Kinematics Viscosity 135oC CSI, min
Flash point, C, min
Solubility in trichloroethyiene, % min
Penetration at 25oC 50-70
Softening point, C min
Test on residue from thin film oven test / RTFOT --
(A) Viscosity ratio at 60oC, max
(B) Ductility at 25oC, cm, min after thin film over test
508.2.2 Coarse aggregates
The coarse aggregates shall consists of crushed rock, crushed gravel or other hard material
retained on the 2.36 mm sieve. They shall be clean, hard, durable of cubical shape, free
from dust and soft or friable matter, organic or other deleterious substances. Where the
Contractor’s selected source of aggregates have poor affinity for bitumen, as a condition for
the approval of that source the bitumen shall be treated with an approved anti-stripping
agent, as per the manufacture’s recommendations, without additional payment. Before
approval of the sources, the aggregates shall be tested for stripping. The aggregates shall
satisfy the physical requirements specified in Table 500-14, for Semi dense bituminous
Where crushed gravel is proposed for use as aggregate, not less than 90% by weight of the
crushed material retained on the 4.75 mm sieve shall have at least two fractured faces.
508.2.3 Fine aggregates:
Fine aggregates shall consist of crushed or naturally occurring mineral material, or a
combination of the two, passing the 2.36 mm sieve and retained on the 75 micron sieve.
They shall be clean, hard, durable, dry and free from dust, and soft or friable matter,
organic or other deleterious matter.
The fine aggregate shall have a sand equivalent value of not less than 50 when tested in
accordance with the requirement of IS: 2720 (Part 37).
The plasticity index of the fraction passing the 0.425 mm sieve shall not exceed 4. When
tested in accordance with IS: 2720 (Part 5).
508.2.4 Filler:
Filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or
cement approved by the Engineer-in-charge.
The filler shall be graded within the limits indicated in Table 500-9.
TABLE 500-9. GRADING REQUIREMENTS FOR MINERAL FILLER
IS Sieve Cumulative per cent passing by weight of
(mm) total aggregate
The filler shall be free from organic impurities and have a Plasticity Index not greater than
4. The Plasticity Index requirement shall not apply if filler is cement or lime. When the
coarse aggregate is gravel, 2 per cent by weight of total aggregate, shall be Portland
cement or hydrated lime and the percentage of fine aggregate reduced accordingly.
Cement or hydrated lime is not required when the lime stones aggregates is used. Where
the aggregates fail to meet the requirements of the water sensitivity test in Table 500-14,
then 2 per cent by total weight of aggregate, of hydrated lime shall be added without
additional cost.
508.2.5 Aggregate grading and binder content:
When tested in accordance with IS: 2386 Part-I (Wet sieving method), the combined
grading of the coarse and fine aggregates and added filler shall fall within the limits
shown in Table 500-15 for grading 1 or 2 specified in the Contract.
508.3 Mixture Design
508.3.1 Requirement for the mixture:
Apart from conformity with the grading and quality requirements for individual
ingredients the mixture shall meet the requirements set out in Table 500-16.
TABLE 500-14. PHYSICAL REQUIREMENTS FOR COURSE AGGREGATE FOR
SEMI DENSE BITUMINOUS CONCRETE PAVEMENT LAYERS
Property Test Specification
Max 5% passing 0.75 mm
Cleanliness (dust) Grain size analysis1
Flakiness and elongation Index
Particle shape Max 30%
Los Angeles Abrasion Value3 Max 35%
Aggregate Impact value4 Max 27%
Polishing Polished stone Value5 Min
Durability Sodium Sulphate Max 12%
Magnesium Sulphate Max 18%
Water absorption Water absorption7 Max 2%
Coating and stripping of
Stripping Minimum retained
bitumen aggregate mixtures9
Water sensitivity** Retained tensile strength8 Min 80%
1. IS:2386 Part 1 6. IS: 2386 Part
2. IS:2386 Part 1 7. IS: 2386 Part
(the elongation test may be done only on non-flaky aggregates in the samples)
3. IS: 2386 Part 4* 8. AASHTO T 283**
4. IS: 2386 Part 4* 9. IS:
5. BS: 812 Part
* Aggregate may satisfy requirements of either of these two tests
** the water sensitivity test is only required if the minimum retained coating in the
stripping test is less than 95%.
The requirement for minimum per cent voids in mineral aggregate (VMA) are set out in
TABLE: 500-12 Minimum percent voids in mineral aggregates ( VMA )
Nominal Minimum VMA Percent Related to Design Air Voids Per cent2
Maximum 3.0 4.0
Note : 1) The nominal maximum particle size is one size larger than the first sieve to retain
2)Interpolate minimum voids in the mineral aggregate (VMA) for design air voids
values between those listed.
508.3.2 Binder content:
The binder content shall be optimised to achieve the requirements of the mixture set out in
Table 500-16 and the traffic volume as specified in the Contract. The Marshall method for
determining the optimum binder content shall be adopted as described in the Asphalt
Institute Manual MS-2, replacing the aggregates retained on the 26.5 mm sieve and
retained on the 22.4 mm sieve, where approved by the Engineer-in-charge.
TABLE 500-15. COMPOSITION OF SEMI DENSE BITUMINOUS CONCRETE PAVEMENT
Nominal aggregate size 13 mm 10 mm
Layer Thickness 35 – 40 mm 25 – 30 mm
IS Sieve1 (mm) Cumulative % by weight of total aggregate passing
Bitumen content % by
mass of total mix2 Min 4.5 Min
Bitumen Grade 65* VG-30
1. The combined aggregate grading shall not vary from the low limit on one sieve to
the high limit on the adjacent sieve.
2. Determined by the Marshall method.
TABLE 500-16. REQUIREMENTS FOR SEMI DENSE BITUMINOUS PAVEMENT LAYERS
Minimum stability (kN at 600C)
Minimum flow (mm)
Maximum flow (mm)
Compaction level (Number of 75 blows on each of the two faces of the
blows) specimen
Percent air voids 3–5
Percent voids in mineral
See Table 500-12
aggregate (VMA)
Percent voids filled with bitumen
508.3.3 Job Mix Formula:
The procedure for formulating the job mix formula shall be generally as specified in Clause
507.3.3 and the results of tests enumerated in Table 500-16 as obtained by the
The contractor shall inform Engineer-in-charge in writing, at least 20 days before start
of work, of the job mix formula proposed for use in the works,shall give the following
(i) Source and location of materials
(ii) proposition of all materials express as follows where each is applicable:
(a) Binder Type, and percentage by weight of total mix
(b) Course aggregates/Fine aggregates/Mineral filler as percentage by weight of total
aggregate including mineral filler
(iii) A single definite percentage passing each sieve for mixed aggregates
(iv) The individual grading of individual aggregate fractions, and proposition of each in
the combined grading.
(v) The result of tests enumerated in Table 500-16 as obtained by the contractor.
(vi) Where the mixer is a batch mixer, the individual weights of each type of aggregates,
and binder per batch.
(vii) Test results of physical characteristics of aggregates to be used.
(viii) Mixing temperature and compacting temperature.
While establishing the job mix formula, the contractor shall ensure that it is based on a
correct and truly representative sample of materials that will actually be used in the work
and that the mixture and its different ingredients satisfy the physical and strength
requirements of these specifications.
Approve job mix formula shall be based on independent testing by the Engineer-in-charge
for which samples of all ingredients of the mix shall be furnished by the contractor as
required by the Engineer-in-charge.
The approve job mix formula shall remain effective unless and until a revised job mix
formula is approved. Should change in the source of materials be proposed, anew job mix
formula shall be forwarded to the Engineer-in-charge for approval.
508.3.4 Plant Trials – permissible variation in job mix formula:
Once the laboratory job mix formula is approved, the Contractor shall carry out plant trials
at the mixer to establish that the plant can be set up to produce a uniform mix conforming
to the approved job mix formula. The permissible variations of the individual percentages
of the various ingredients in the actual mix from the job mix formula to be used shall be
within the limits as specified in Table 500-13. These variations are intended to apply to
individual specimens taken for quality control tests in accordance with Section
TABLE 500-13. PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA
Description Permissible variation
Base/binder Wearing
Aggregate passing 19mm sieve or larger 8% 7%
Aggregate passing 13.2 mm, 9.5 mm 7% 6%
Aggregate passing 4.75 mm 6% 5%
Aggregate passing 2.36 mm, 1.18mm, 0.6mm 5% 4%
Aggregate passing 0.3mm, 0.15mm 4% 3%
Aggregate passing 0.075 mm 2% 1.5%
Binder content 0.3% 0.3%
Mixing temperature 10 C
Once the plant trials have demonstrated the capability of the plant, and the trials are
approved, the laying operation may commence. Over the period of the first month of
production for laying on the works, the Engineer-in-charge shall require additional testing
of the product to establish the reliability and consistency of the plant.
508.3.5 Laying Trials:
Once the plant trials have been successfully completed and approved, the Contractor shall
carry out laying trials, to demonstrate that the proposed mix can be successfully laid, and
compacted all in accordance with clause 501 the laying trial shall be carried out on a
suitable area which is not to form part of the work, unless specifically approved in writing,
by the Engineer-in-charge. The area of the laying trials shall be a minimum of 100 sq.m. of
construction similar to that of the project road, and it shall be in all respects, particularly
compaction, the same as the project construction, on which the bituminous material is to
The Contractor shall previously inform the the Engineer-in-charge of the proposed method
for laying and compacting the material. The plant trials shall then establish if the proposed
laying plant, compaction plant, and methodology is capable of producing satisfactory
results. The density of the finished paving layer shall be determined by taking core no
sooner than 24 hours after laying, or by other approved method.
Once the laying trials have been approved, the same plant and methodology shall be
applied to the laying of the materials on the project, and no variation of either shall be
acceptable, unless approved in writing by the the Engineer-in-charge, who may at his
discretion require further laying trials.
508.4 Construction Operations
508.4.1 Weather and seasonal limitations:
Laying shall be suspended:
i. In presence of standing water on the surface;
ii. When rain is imminent, and during rains, fog or dust storm;
iii. When the base/binder course is damp;
iv. When the air temperature on the surface on which it is to be laid is less than 100C
for mixes conventional bitumen and is less than 150C for mixes with modified
v. When the wind speed at any temperature exceeds the 40 km per hour at 2 m
508.4.2 Preparation of base:
The surface on which the Semi Dense Bituminous material is to be laid shall be prepared in
accordance with Clauses 501 and 902 as appropriate or as directed by the Engineer-in-
charge. The surface shall be thoroughly swept clean by mechanical broom and dust
removed by compressed air. In locations where a mechanical broom cannot access, other
approved methods shall be used as directed by the Engineer-in-charge.
508.4.3 Tack coat:
Where specified in the Contract, or otherwise required by the the Engineer-in-charge, a
tack coat shall be applied in accordance with the requirements of Clause
The work shall consist of the application of a single coat of low viscosity liquid bituminous
material to existing bituminous, cement concrete or primed granular surface preparatory
to the superimposition of a bituminous mix, when specified in the Contract or as
instructed by the Engineer. The work shall be carried out on a previously prepared
surface in accordance with Clause 501.8.
503.2 Materials
The binder used for tack coat shall be either Cationic bitumen emulsion (RS 1) complying
with IS:8887 or suitable low viscosity paving bitumen of VG 30 grade conforming to IS:73.
503.3 Weather and Seasonal Limitations
Bituminous material shall not be applied during a dust storm or when the weather is
foggy, rainy or windy or when the temperature in the shade is less than 10oC. Where the
tack coat consists of emulsion, the surface shall be slightly damp, but not wet. Where the
tack coat is of cutback bitumen, the surface shall be dry.
503.4 Construction
503.4.1 Equipment
The tack coat shall be applied by a self-propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a specified rate. Hand spraying shall not
be permitted except in small areas, inaccessible to the distributor, or narrow strips, shall
be sprayed with a pressure hand sprayer, or as directed by the Engineer.
503.4.2 Preparation of Base
The surface on which the tack coat is to be applied shall be clean and free from dust, dirt,
and any extraneous material, and be otherwise prepared in accordance with the
requirements of Clauses 501.8. The granular or stabilized surfaces shall be primed as per
Clause 502. Immediately before the application of the tack coat, the surface shall be
swept clean with a mechanical broom, and high pressure air jet, or by other means as
directed by the Engineer.
503.4.3 Application of Tack Coat
The application of tack coat shall be at the rate specified in Table 500-5, and it shall be
applied uniformly. If rate of application of Tack Coat is not specified in the contract, then
it shall be the rate specified in Table 500-5. No dilution or heating at site of RS1 bitumen
emulsion shall be permitted. Paving bitumen if used for tack coat shall be heated to
appropriate temperature in bitumen boilers to achieve viscosity less than 2 poise. The
normal range of spraying temperature for a bituminous emulsion shall be 20oC to 70oC
and for cutback, 50oC to 80oC. The method of application of tack coat will depend on the
type of equipment to be used, size of nozzles, pressure at the spray bar, and speed or
forward movement. The Contractor shall demonstrate at a spraying trial, that the
equipment and method to be used is capable of producing a uniform spray, within the
tolerances specified.
Table 500-5: Rate of Application of Tact Coat
Type of Surface Rate of Spray of Binder in Kg per sq.m
Bituminous surfaces 0.20 –
Granular surfaces treated with primer 0.25 –
Cement concrete pavement 0.30 –
503.4.4 Curing of Tack Coat
The tack coat shall be left to cure until all the volatiles have evaporated before any
subsequent construction is started. No plant or vehicles shall be allowed on the tack coat
other than those essential for the construction.
503.5 Quality Control of Work
For control of the quality of materials and the works carried out, the relevant provisions
of Section 900 shall apply.
503.6 Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance
with the provisions of Clause
508.4.4 Mixing and transportation of the mixture:
The provisions as specified in Clauses 501.3 and 501.4 shall apply.
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity
and capable of yielding a mix of proper and uniform quality with thoroughly coated
aggregates. Appropriate mixing temperature are given in Table 500–2 of these
Specifications. The difference in temperature between the binder and aggregate shall at
no time exceed 140 C. in order to ensure uniform quality of the mix and better coating of
aggregates, the hot mix plant shall be calibrated from time to time. The essential features
of the hot mix plant are given in Annexure A of IRC:
Table 500- 2: Mixing, Laying and Rolling Temperatures for Bituminous Mixes
(Degree Celsius)
Bitumen Bitumen Aggregate Mixed Laying *Rolling
Viscosity Temperature Temperature Material Temperature Temperature
Grade Temperature
*Rolling must be completed before the mat cools to these minimum temperatures.
If a continuous type mixing plant is used, the Contractor must demonstrate by laboratory
analysis that the cold feed combined grading is within the grading limits specified for that
bituminous bound material. In the case of a designed job mix, the bitumen and filler
content shall be derived using this combined grading.
501.4 Transporting
Bituminous materials shall be transported in clean insulated and covered vehicles. An
asphalt release agent, such as soap or lime water, may be applied to the interior of the
vehicle to prevent sticking and to facilitate discharge of the material.
508.4.5 Spreading:
The general provisions of Clauses 501.5.3 and 501.5.4 shall apply.
508.4.6 Rolling:
The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved
laying trials. The compaction process shall be carried out by the same plant, and using the
same method, as approved in the laying trials, which may be varied only with the express
approval of the Engineer-in-charge in writing.
508.5 Opening to Traffic
The newly laid surface shall not be open to traffic for at least 24 hours after laying and
completion of compaction, without approval of the Engineer-in-charge in writing.
508.6 Surface Finish and Quality Control
The surface finish of the completed construction shall conform to the requirements of
Clause 902. All materials and workmanship shall comply with the provisions set out in
Section 900 of this Specification.
508.7 Measurement for Payment
Semi Dense Graded Bituminous concrete shall be measured as finished work by weight
in METRIC TONNE.
The contract unit rate for semi dense bituminous shall be payment in full for carrying out
the all required operations as specified include the provision of bitumen 5.0 per cent, by
weight of total mixture. The increase in actual percentage of bitumen used will not be
entertained for the payment. Rate is inclusive of :
(i) Preparation of the surface to receive the material.
(ii) Providing all materials to be incorporated in the work including arrangement for
stock yards, all royalties, fees, rents where necessary and all leads and lifts;
(iii) Mixing, transporting, laying and compacting the mix, as specified.
(iv) All labour, tools, equipment, plant including installation of hot mix plant, power
supply units and all machinery, incidental to complete the work to these
Specifications;
(v) Carrying out the work in part width of the road where directed;
(vi) Carrying out all tests for control of quality; and
(vii) The rate of premixed material is inclusive of all wastage in cutting of joints etc.
(viii) The rate is to include for all necessary testing, mix design, transporting and testing
of samples, and cores. The Contractor can arrange to carry out necessary testing
except field test at an outside Laboratory, approved by after obtaining permission
of Engineer-in-charge, and all costs incurred are deemed to be included in the rate
quoted and all cost incurred are deemed to be included in the rate quoted for the
(ix) The depth checking after completion or during execution of the work and to bring
the work in original position.
(x) The rate shall cover the provision of bitumen, with the provision that the increase
in actual percentage of bitumen used will not be entertained for the payment.
(xi) The quoted rate is inclusive of the cost of tack coat.
Wet mix macadam laying using Mechanical Paver (Providing, laying,
spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the material with water at OMC in
mechanical mix plant carriage of mixed material by tipper to site, laying in
uniform layers with paver in sub-base/base course on well prepared surface
and compacting with vibratory roller to achieve the desired density.
This work shall consist of laying and compacting clean, crushed, graded aggregate
and granular material, premixed with water, to a dense mass on a prepared sub
grade/sub-base/base or existing pavement as the case may be in accordance with
the requirements of these Specifications. The material shall be laid in, one or more
sub-layers as necessary to lines, grades and cross-sections shown on the approved
drawings or as directed by the Engineer-in-charge.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than
75 mm. When vibrating or other approved types of compacting equipment are
used, the compacted depth of a single layer of the sub-base course may be up to
125 mm with the approval of the Engineer-in-charge.
406.2 Materials
406.2.1 Aggregates
406.2.1.1 Physical requirements:
Coarse aggregate shall be crushed stone if crushed gravel/shingle is used not less
than 90 percent by weight of the gravel/shingle pieces retained on 4.75 mm sieve
shall have at least two fractured faces. The aggregates shall conform to the physical
requirements set forth in Table 400-12.
If the water absorption value of the coarse aggregate is greater than 2 percent, the
soundness test shall be carried out on the material delivered to site as per IS:2386
TABLE 400-12. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR WET
MIX MACADAM FOR SUB-BASE/BASE COURSES
Test Test Method Requirements
1 Los Angels Abrasion value Or
Aggregate Impact Value IS:2386(Part-4)
IS:2386(Part-4) or IS:5640 40 percent (Max.)
30 percent (Maxi.)
2 Combined Flakiness and Elongation indices (Total) IS: 2386 (Part-1)
per cent (Max.) *
* To determine this combined proportion, the flaky stone from a representative
sample should first be separated out. Flakiness index is weight of flaky stone metal
divided by weight of stone sample. Only the elongated particles be separated out
from the remaining (non-flaky) stone metal. Elongation index is weight of
elongated particles divided by total non-flaky particles. The value of flakiness
index and elongation index so found are added up.
406.2.1.2 Grading requirements:
The aggregates shall conform to the grading given in Table 400-13.
TABLE 400-13. GRADING REQUIREMENTS OF AGGREGATES FOR WET MIX MACADAM
IS sieve designation Per cent by weight passing the IS sieve
600.00 micron 8-22
75.00 micron 0-5
Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to
fine and shall not vary from the low limit on one sieve to the high limit on the
adjacent sieve or vice versa.
406.3 Construction Operations
406.3.1 Preparation of base:
The surface of the sub-grade/sub-base/base to receive the wet mix macadam
course shall be prepared to the specified grade and camber and cleaned of dust,
dirt and other extraneous material. Any ruts or soft yielding places shall be
corrected in an approved manner and rolled until firm surface is obtained.
Where the WMM is to be laid on an existing metalled road, damaged area including
depressions and potholes shall be repaired and made good with the suitable
material. The existing surface shall be scarified and re-shaped to the required
grade and camber before spreading the coarse aggregate for WMM
406.3.2 Provision of lateral confinement of aggregates:
While constructing wet mix macadam, arrangement shall be made for the lateral
confinement of wet mix. This shall be done by laying materials in adjoining
shoulders along with that of wet mix macadam layer and following the sequence of
operation as under:
For construction of WMM, arrangement shall be made for the lateral confinement
of aggregates. This shall be done by building adjoining shoulders along with WMM
layers. The practice of constructing WMM in a trench section excavated in the
finished formation must be completely avoided.
Where the WMM course is to be constructed in narrow widths for widening of an
existing payment, the existing shoulders should be excavated to their full depth
and width up to the sub-grade level except where widening specifications
envisages laying of a stablised sub-base using in-situ operations in which case the
same should be removed only up to the sub-base level. No extra payment shall be
made for the same.
406.3.3 Preparation of mix:
Wet Mix Macadam shall be prepared in an approved mixing plant of suitable
capacity having provision for controlled addition of water and forced/positive
mixing arrangement like pugmill or pan type mixer of concrete batching plant.
The plant shall have following features
i) For feeding aggregates- three/four bin feeders with variable speed motor.
ii) Vibrating screen for removal of oversize aggregates.
iii) Conveyor Belt
iv) Controlled system for addition of water
v) Force/positive mixing arrangement like pug-mill or pan type mixer
vi) Centralized control panel for sequential operation of various devices and precise
process control
vii) Safety devices
Optimum moisture for mixing shall be determined in accordance with IS:
(Part -8) after replacing the aggregate fraction retained on 22.4 mm sieve with
material of 4.75 mm to 22.4 mm size. While adding water, due allowance should be
made for evaporation losses. However, at the time of compaction, water in the wet
mix should not vary from the optimum value by more than agreed limits. The
mixed material should be uniformly wet and no segregation should be permitted.
406.3.4. Spreading of mix:
Immediately after mixing, the aggregates shall be spread uniformly and evenly
upon the prepared subgrade/sub-base/base in required quantities. In no case
should these be dumped in heaps directly on the area where these are to be laid
nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread by a paver finisher. The paver finisher shall be self-
propelled of adequate capacity with following features:
(i) Loading hoppers and suitable distribution system, so as to provide a smooth
uninterrupted material flow for different layer thicknesses from the tipper to the
(ii) Hydraulically operated telescopic screed for paving width up to to 8.5 m and fixed
screed beyond this. The screed shall have tamping and vibrating arrangement for
initial compaction of the layer.
(iii) Automatic levelling control system with electronic sensing device to maintain mat
thickness and cross slope of mat during laying procedure.
In exceptional cases where it is not possible for the paver to be utilized,
mechanical means like motor grader may be used with the prior approval of the
Engineer-in-charge. The motor grader shall be capable of spreading the material
uniformly all over the surface.
The surface of the aggregate shall be carefully checked with templates and all high
or low spots remedied by removing or adding aggregate as may be required. The
layer may be tested by depth blocks during construction. No segregation of larger
and fine particles should be allowed. The aggregates as spread should be of
uniform gradation with no pockets of fine materials.
406.3.5 Compaction:
After the mix has been laid to the required thickness, grade and cross fall/camber
the same shall be uniformly compacted, to the full depth with suitable roller. If the
thickness of single compacted layer does not exceed 100mm, a smooth wheel
roller of 80 to 100 kN weight may be used. For a compacted single layer up to
mm, the compaction shall be done with the help of vibratory roller of minimum
static weight of 80 to 100 kN with an arrangement for adjusting the frequency and
amplitude. And appropriate frequency and amplitude may be selected. The speed
of the roller shall not exceed 5km/h.
In portion having unidirectional cross fall/super elevation, rolling shall commence
from the lower edge and progress gradually towards the upper edge. Thereafter,
roller should progress parallel to the centre line of the road, uniformly over-
lapping each preceding track by at least one third width until the entire surface has
been rolled. Alternate trips of the roller shall be terminated in stops at least 1m
away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running
forward and backward until the edges have been firmly compacted. The roller
shall then progress gradually towards the centre parallel to the centre line of the
road uniformly overlapping each of the preceding track by at least one-third width
until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or
from any other cause shall be corrected at once as specified and/or removed and
Along forms, kerbs, walls or other places not accessible to the roller, the mixture
shall be thoroughly compacted with mechanical tampers or a plate compactor.
Skin patching of an area without scarifying the surface to permit proper bonding of
the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes
a wave-like motion in the sub-base/base course or sub grade. If irregularities
develop during rolling which exceed 12mm when tested with a 3 metre straight
edge, the surface should be loosened and premixed material added or removed as
required before rolling again so as to achieve a uniform surface conforming to the
desired grade and cross fall. In no case shall the use of unmixed material be
permitted to make up the depression.
Rolling shall be continued till the density achieved is at least 98 per cent of the
maximum dry density for the material as determined by the method outlined in IS:
After completion, the surface of any finished layer shall be well-closed, free from
movement under compaction equipment or any compaction planes, ridges, cracks
and loose material. All loose, segregated or otherwise defective areas shall be
made good to the full thickness of the layer and re-compacted.
406.3.6 Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to
dry for 24 hours.
406.4 Opening to Traffic
No vehicular traffic shall be allowed on the finished wet mix macadam surface.
Construction equipment may be allowed with the approval of the Engineer-in-
406.5 Surface Finish and Quality Control of Work
406.5.1 Surface evenness:
The surface finish of construction shall conform to the requirements of Clause
406.5.2 Quality Control:
Control on the quality of materials and works shall be exercised by the the
Engineer-in-charge in accordance with Section
406.6 Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the
permissible tolerances or where the course is otherwise defective due to sub grade
soil getting mixed with the aggregates, the full thickness of the layer shall be
scarified over the affected area, reshaped with added premixed material or
removed and replaced with fresh premixed material as applicable and re-
compacted in accordance with Clause 406.3. The area treated in the aforesaid
manner shall not be less than 5m long and 2 m wide. In no case shall depression be
filled up with unmixed and upgraded material or fines.
406.7 Measurement and Payment for Item No.4
Measurement for Payment:
Wet mix macadam shall be measured as finished work in position in cubic meters.
(a) Measurement for wet mix macadam
(i) Initial levels shall be taken on L/s at intervals of 30 m along the new surface of
leveling of WBM. The c/s levels shall be taken at centre and both sides of the road.
(ii) Final levels shall be taken on L/s at 30 m interval, along the complete wet mix
macadam or less as required. The c/s levels shall be taken at centre and both sides
(b) Recording of levels for the purpose of measurement and payment
(i) The levels shall be taken and recorded by the representative of Engineer-in-Charge
in the presence of the contractor or his authorize representative. At the end of the
levelling work on a particular day, the person taking the levels shall sign the field
book. The contractor or his agent shall also sign the field books in token of the
acceptance of the levels.
(ii) After taking the levels, the L/S and cross sections shall be plotted immediately.
(iii) All the initial records which form the basis for the payment shall be signed by the
Nigam officer and the contractor or his authorize representative. The record shall
be preserved in the safe custody of the Engineer-in-Charge. The agency shall be
allowed to take a certified copy of such records on request in writing by the
contractor or his authorized agent.
(iv) The Contractor shall provide all materials and labour as and when required, for
taking levels and measurements and no extra payment shall be made over and
above the tendered rate of item.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .