Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.0 Craccepted-aoc | ₹1.0 Cr | accepted-aoc |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
9 Feb 2026, 5:00 pmClosed
Superintending Engineer, RWS & S, Kakinada
Sujala Bhavan, NFCL Road, Kakinada
Providing DWF through 100% FHTCs to Addateegala Habitation of Addateegala GP in Addateegala Mandal, Est. cost Rs.149.60 Lakhs
892763
No.54/2025-26, Dt.02-01-2026
OPEN
Water Supply
ALLURI SETHARAMA RAJU
14 documents required · 14 mandatory
₹4,276
₹1.2 L
24 Feb 2026
25 Jan 2026
25 Jan 2026
Drilling of Bore well by down the hole hammer drilling to a finished dia of 165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. but excluding GST but including overheads and contractor's profit @ 13.615% .
Drilling of Bore well by down the hole hammer drilling to a finished dia of 112 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.. but excluding GST but including overheads and contractor's profit @ 13.615% .
Cost & Supply of 250 mm dia PVC pipe class - 3 (6 Kgf/Cm2) as per ISI specification IS.4985/1988 with ISI mark
Cost & Supply of 180 mm dia PVC pipe class - 3 (6 Kgf/Cm2) as per ISI specification IS.4985/1988 with ISI mark
Cost & Supply of 140 mm dia PVC pipe class - 3 (6 Kgf/Cm2) as per ISI specification IS.4985/1988 with ISI mark
Slotting Charges of PVC Casing Pipe
Geological Survey Charges excluding taxes and Seigniorge charges but including overheads and contractor's profit @ 13.615%
Supply & Fixing of 180 mm dia PVC Bore well Cap
Supply and Transportation of 2 HP, 5-10 stage 5star rated submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with waterproof winding, Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415V ± 10%, Three Phase 50 Hz AC supply etc complete for 6" Bore well. Makes: Kirloskar /Crompton /Texmo /KSB /Aryan/Varsha / Lubi. including overheads and contractor's profit @ 13.615% .
Fabrication , transportation and supply of suitable size panel board for single phase submersible motor 2 to 3HP consisting of relay, Contactor, starting and running capacitors, Voltmeter, Ammeter, indicator lamps, MCB , on/off switch including supply and fixing of DOL starter of complete., Makes: C&S/LTLK/ Seimens/ BCH/ Crompton. complete.,. . excluding GST and seigniorage charges but including overheads and contractor's profit @ 13.615%
S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete for pumping main but excluding GST etc complete.
Supply & Fixing of 40 mm dia HDPE Pipe 10 Kg/Cm2 for suction pipe and excluding GST etc complete.
Supply and fixing of 1.50 Sqmm submersible cable wire
Supply and fixing of 7/16 alluminium Service wire
Supply and fixing of 32 Amps Fuse units
Supply and fixing of 32 mm MS long clampsets
Cost and fixing of 32 mm GI union
Supply and fixing of 32 mm dia GM Ball Valve
Supply and fixing of 32 mm dia GM NR Valve
Supply and fixing of 32 mm dia GI Flanges
Supplying and fixing of hose cabinet of size 750mm X 600mm x 250mm made of No 16 gauge SWG CRCA sheet with 6mm thick glazed glass door including necessary locking arrangement suitable to accommodate 2 Nos 15 mtr long Hose pipe, 1 No branch pipe, mounted on wall OR raised brick platform and duly painted with Post office red externally and white internally with synthetic enamel paint complete in all respect, for external hydrant as required. Makes : As per list of recommended brands
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for size 0.70 x 1.00 m (Manualy/ machinery) pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes 90 mm dia HDPE - 6 KG/Cm2 - Pipe Line.The rate including cotractor profit 13.615% but excluding GST.
Construction of 60000 Lts. capacity OHSR with 12.95 Mts. staging with raft foundation including plastering with CM (1:3) two coats of whether proof emulsion painting for external surfaces and three coats of epoxy paint to inner surface of the reservoir including roof down lettering as per departmental direction, fixing of all required fixtures CI D/F pipes, Verticles, Valves, Execution as per design and drawing supplied by department including the cost and conveyance of all materials. but excluding cost of CI pipes,specials and valves for vertical connections for a wind pressure of 150 Kg. per Sqm (using M30 grade concrete) with the following Fixtures including:Contractor Profit 13.615% and A)RCC or Aluminium ladder inside 0.60 m wide. B) Spiral staircase on the outside shall be provided upto 200KL. Above 200KL capacity dog legged staircase shall be provided with staircase flight width of 1.0 mts and landing width of 1.20 mts with S.S. railing upto 1.0 height. C) Lightening arrestor, including conductor and earthing etc., D) RCC ventilators with copper or stainless steel fly proof mesh. E) D.I Menholes frame and cover 0.60x0.60m as per IS specifications (light duty)-2Nos. F) Water level indicator of good quality with ebonite / copper float approved pattern -1No. G) The ladder shall be with M.S. ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single column OHSRs only. H) Minimum staging for all ELSR/OHSR shall be 10.0mts. I) The increase in staging shall be at 1.0mt interval. J) The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of 1.20 mts. K) The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with M.S. collapsible gate upto 1st brace level from ground level to prevent unauthorized entry. L) D.I. swan neck ventilators shall be provided in top dome and slab. M) The above rates are exclusive of all inlet, outlet connection and valves. All valves near inlet, out let and for scour of ELSRs shall be D.I. valves of heavy duty confirming to the specification of SoR item No. 28
Cost and supply of CI Pipes, Specials for OHSR including contractor profit (As Per Annexure)
Cost and supply of 80mm dia Sluice Valve
Existing Cutting open C.C. road surface with concrete saw cutter and removal with Breaker including cost and conveyance of all materials and labour charges etc complete
Plain Cement concrete (1:2:4) Nominal Mix using 20mm metal using Hand mix including cost and conveyance of all materials and labour charges etc complete For CC Road cutting Gap Filling
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for size 0.70 x 1.00 m (Manualy/ machinery) pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes 63 mm dia HDPE - 6 KG/Cm2 - Pipe Line.The rate including cotractor profit 13.615% but excluding GST.
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for size 0.70 x 1.00 m (Manualy/ machinery) pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes 75 mm dia HDPE - 6 KG/Cm2 - Pipe Line.The rate including cotractor profit 13.615% but excluding GST.
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for size 0.70 x 1.00 m (Manualy/machinery) pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes 110 mm dia HDPE - 6 KG/Cm2 - Pipe Line.The rate including cotractor profit 13.615% but excluding GST.
Supply and Fixing of 50 mm GI pipe medium grade properties and weight as per IS 1239 with GI fittings such as elbows , tees, couplings,nipples, plugs including excavation for trenches complete except for GI bends, unions and Gi connectors with checkout and socket tata or zenith make or equivalent for pipeline ect., complete.
Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves)(PN-1.6 MPa) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties , completed including supply of Sluice valve ,DI Specials to suit the pressure class of pipe, fixing with all fixtures and construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc.complete for finished item of work but excluding GST - 63mm dia on HDPE Pipe
Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.
CC (1:2:4) mix Using 20mm HBG metal including cost and conveyance of all materials and all labour charges Etc., complete.
Supply and fixing of 90mm dia PVC 4kg/sqcm Pipe including cost and conveyance of all material and all labour charges etc complete.
(Rupees One Crore Twenty Lakhs Seventy Nine Thousand and Twenty Two Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Part B Vol-I (Technical).doc
TENDER_DOCUMENT • 0.18 MB
Addateegala BOQ.xlsx
TENDER_DOCUMENT • 0.05 MB
Addateegala.pdf
TENDER_DOCUMENT • 0.12 MB
Part A Volume-I (General).doc
TENDER_DOCUMENT • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .