Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L Quoted ₹25.5 L | L1 | Accepted-AOC AOC IS AWARDED DUE TO L1 |
| 2 | L2₹26.3 LRejected-Finance | ₹26.3 L | L2 | Rejected-Finance BID IS REJECTED DUE TO L2 |
| 3 | L3₹28.2 LRejected-Finance | ₹28.2 L | L3 | Rejected-Finance BID IS REJECTED DUE TO L3 |
| 4 | L4₹29.1 LRejected-Finance NOT AVAILABLE | ₹29.1 L | L4 | Rejected-Finance BID IS REJECTED DUE TO L4 |
| 5 | L5₹29.2 LRejected-Finance | ₹29.2 L | L5 | Rejected-Finance BID IS REJECTED DUE TO L5 |
| Sl No | Description | Qty | Unit | M/S VASUDEV CONSTRUCTION L5 | S S CONSTRUCTION COMPANY L4 | M/S ARYA CONSTRUCTION L1 | M/S SAVERA BUILDCON L3 | ABHISHEK ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 224.91 | Cum | 50 ₹11,245.50 | 60 ₹13,494.60 | 52 ₹11,695.32 | 50 ₹11,245.50 | 40 ₹8,996.40 |
| 2.00 | Supply and laying of Ordinary Sand up to G. L. for easilay and early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. | 56 | Cum | 500 ₹28,000 | 1,150 ₹64,400 | 1,110 ₹62,160 | 1,100 ₹61,600 | 700 ₹39,200 |
| 3.00 | Cement Concrete in (1:3:6) M10 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work | 137.01 | Cum | 5,000 ₹6.9 L | 4,800 ₹6.6 L | 4,120 ₹5.6 L | 4,500 ₹6.2 L | 4,600 ₹6.3 L |
| 4.00 | RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | 106.89 | Cum | 5,700 ₹6.1 L | 5,500 ₹5.9 L | 4,700 ₹5.0 L | 5,300 ₹5.7 L | 5,200 ₹5.6 L |
| 5.00 | Centering & shuttering for P.C.C. work of Cut off, Box etc. including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 30.63 | Cum | 400 ₹12,252 | 350 ₹10,720.50 | 337 ₹10,322.31 | 350 ₹10,720.50 | 250 ₹7,657.50 |
| 6.00 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 134.72 | Sqm | 600 ₹80,832 | 610 ₹82,179.20 | 554 ₹74,634.88 | 600 ₹80,832 | 300 ₹40,416 |
| 7.00 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 1.97 | M.T. | 65,000 ₹1.3 L | 71,000 ₹1.4 L | 59,829 ₹1.2 L | 70,000 ₹1.4 L | 61,500 ₹1.2 L |
| 8.00 | Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 16.8 | Rmtr | 250 ₹4,200 | 235 ₹3,948 | 208 ₹3,494.40 | 230 ₹3,864 | 200 ₹3,360 |
| 9.00 | P/f RCC Hume Pipe 1200 mm dia NP-3 type including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge. | 160 | Rmtr | 8,000 ₹12.8 L | 7,600 ₹12.2 L | 6,800 ₹10.9 L | 7,500 ₹12 L | 7,000 ₹11.2 L |
| 10.00 | Providing & Laying of with 20.00 to 40.00 kg boulder in including cost of all material, labour and T&Ps etc. complete required for proper complition of work | 25.11 | Cum | 2,000 ₹50,220 | 2,200 ₹55,242 | 1,880 ₹47,206.80 | 2,000 ₹50,220 | 1,400 ₹35,154 |
Tender Value
₹29.7 L
EMD Value
₹59,000
Closing Date
12 Nov 2025, 2:00 pmClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
CONSTRUCTION OF CROSS DRAINAGE ( PIPE SYPHON) AT KM. 1.150 OF BAGADPUR DY. UNDER MGC STAGE II IN DIST AMROHA
2025_UPIDC_1086514_1
05/EE/2025-26
Open Tender
Civil Works
120 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹59,000
27 Feb 2026
29 Oct 2025
12 Nov 2025
29 Oct 2025
12 Nov 2025
29 Oct 2025
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work.
Supply and laying of Ordinary Sand up to G. L. for easilay and early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work.
Cement Concrete in (1:3:6) M10 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
Centering & shuttering for P.C.C. work of Cut off, Box etc. including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge .
Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc.
Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc.
Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P/f RCC Hume Pipe 1200 mm dia NP-3 type including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge.
Providing & Laying of with 20.00 to 40.00 kg boulder in including cost of all material, labour and T&Ps etc. complete required for proper complition of work
Provide & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work.
Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work.
Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 600m distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.
ABHISHEK ASSOCIATES (BID ID -5665411)
M/S SAVERA BUILDCON (BID ID -5670087)
S S CONSTRUCTION COMPANY (BID ID -5670119)
M/S VASUDEV CONSTRUCTION (BID ID -5670609)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_1992238.xls
BOQ • 0.24 MB
01.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid