| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.1 L+₹16,294.85 (1.83%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹9.1 L
EMD Value
₹13,720
Closing Date
11 Oct 2021, 5:00 pmClosed
AE LID EW AROOKUTTY
Office of AE LID EW Arookutty GP
Arookutty GP2021-2022.Tender for Construction of Sluice cum box culvert in ward 10
2021_LSGD_442441_1
7/AE/LIDEW/AKTY2021-2022
Open Tender
Civil Works - Others
Item Rate
160 days
AROOKUTTY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,830
₹13,720
1 Nov 2021
1 Oct 2021
13 Oct 2021
1 Oct 2021
11 Oct 2021
1 Oct 2021
Amount
Box culvert cum Sluice
od1306933/2021_2022 : Ring bund type-1 - putting up ring bund as per approved shape 2.5 m bottom width 1 m top width using empty gunny bar polythene bags filled with earth placed in 2 rows at 0.6m apart and filling between with puddle clay to from bund for an average height 2m etc.comple
od1306961/2021_2022 : Bailing out of water using 5HP pump- bailing out of water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay off staff etc. complete
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
od1306972/2021_2022 : Coconut pile-supplying and stacking well matured straight coconut post driving down through various strata below bed level including cost and conveyance of labour charges etc. complete.
od1307141/2021_2022 : Coconut pile-driving down coconut pile to line and levels through various strata including all hire charges and labour for fixing, staging,platform and all other appliances necessary for pile driving down after pointing the bottom end.Details for 1 post of 6m long 15 nos per day 6*15=90m. Details for 90m
od1310076/2021_2022 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
14.8 : Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
12.5.4 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 mIV.R.C.C. grade M 25
13.1.2 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
13.1.1.1 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I.R.C.C grade M 20 (i)For nominal mix 1:2:4
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
13.3 : Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
od1400749/2021_2022 : Shutter for check dams-supplying and providing Thambagam wood, shutter planks 5cm thick including cost of materials, labour charges etc compl
12.4.3.3 : Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 III. Random rubble masonry (iii)In cement mortar (1:5)
od1398938/2021_2022 : Filling up low lying water logged area with local material/quary muck,spreading in layers leveling the top at site and consolidation by ramming etc complete for improving the CBR value of sub grade
od1400530/2021_2022 : Construction of Subgrade and Earthen Shoulders<br><br>Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
2.5.2.A : Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br>(II) By Mechanical Means <br> (A) Cement Concrete
2.5.2.B : Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete
2.7.D : Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(D)Dry Rubble Masonry
P J Constructions
32AYDPJ0423B2ZD
Bidder Name
anil kumar
P J Constructions
32AYDPJ0423B2ZD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_629674.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .