Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.7 L+₹40,353.41 (17.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹2.7 L+₹40,353.41 (17.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹2.8 L+₹53,759.75 (23.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹3,400
Closing Date
12 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer RWD, PLB
O/o the Superintending Engineer Rural Works Division, Phulbani
D type quarter of Tahasil at Phiringia_Building for the year 2026-27
2026_CERWI_145301_1
Online Tender/07/SERWD-PLB/2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Kandhamal
2 documents required · 2 mandatory
₹2,000
₹3,400
Yes
13 Nov 2026
5 Nov 2026
13 Nov 2026
5 Nov 2026
12 Nov 2026
5 Nov 2026
5 Nov 2026 - 11 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris within 50m lead including cost of all labour with T & P, Cess required for the work as per direction of Engineer-in-Charge. | 138.15 | One Sqm | 58.95 | ₹8,143.94 |
| 2 | Fixing glazed tiles on wall with 12mm thick bed of cement mortar 1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing with cost carriage royalty of all materials etc. complete. | 63.6 | One Sqm | 1,476.2 | ₹93,886.32 |
| 3 | Fixing chequered tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing with cost carriage royalty of all materials etc. complete. | 36.75 | One Sqm | 1,047.5 | ₹38,495.63 |
| 4 | Earth work in excavation of foundation in hard soil with all leads and lifts including dressing & leveling the bed and depositing the excavated earth at place 50mtr away from work site with all leads and lifts including cost of all Labour, cess, T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge. | 9 | One Cum | 282.88 | ₹2,545.92 |
| 5 | Providing supplying filling in foundation and plinth with fine course sand in required thick layers free from organic and materials, well watered and rammed including all cost conveyance, royality taxes and all Labour, cess, T&P articles required for the work etc. complete as per the specification and direction of the Engineer-in-charge | 2.2 | One Cum | 1,018.65 | ₹2,241.03 |
| 6 | Providing cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black hand broken granite stone metal of approved quality and from approved quarry including hoisting lowering and laying concrete in layers not exceeding 15cm thick to the required level ramming, watering & Curing etc. complete including cost & conveyance of all materials with all taxes & royalties and all labour with T&P required for the work with cess etc, complete including dewatering if required as per direction of Engineer In Charge. | 4 | One Cum | 6,969.4 | ₹27,877.6 |
| 7 | Cement concrete of proportion (1:2:4) using 12mm (1/2") size clean crusher broken grantie chips of approved quality from approved quarry including hoisting lowering and levelling in position to required level including frame work where necessary ramming and levelling cruing dewatering with cost conveyance taxes and royalties labour of all materials including hire and running charges of machineries T&P required for the work with cess etc, complete as per specification and direction of Engineer-in-charge. . | 4 | One Cum | 8,769.51 | ₹35,078.04 |
| 8 | Dismantling and removing doors & windows and ventilators including removal of frames, hinges fastening, stacking the same for reuse and removing the debris with in 50m lead with cost of all labour, T&P & CESS etc. complete as per direction of Engineer-in-Charge. | 7.08 | One Sqm | 465.15 | ₹3,293.26 |
| 9 | Labour for fitting,fixing of M.S.Grills for Door/ Window as per approved design including cost of screws with cost of all labour, T&P and CESS required for the work etc, complete excluding cost & conveyance of M.S.Door/Window in all respects as directed by Engineer-In-Charges. | 267.96 | One Kg | 75 | ₹20,097 |
| 10 | Dismentaling and removing 2.5 Cm thick grading concrete from roof slab cleaning the surface lowering and removing and debris with in 50mtr lead including cost of all labour with T&P,Cess required for the work etc complete as per direction of Engineer-in-Charge. | 92.91 | One Sqm | 5.18 | ₹481.27 |
stage.html
html • 0.02 MB
finance_618406.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 15.86 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_618406.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .