Loading…
Loading…
Tender ID
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
25 Feb 2026, 6:00 pmClosed
Executive Engineer, Futuristic Planning Cell Department, Vadodara Municipal Corporation
THE WORK OF RUBBER PITCHING AND CONSTRUCTION OF A STORM WATER CHANNEL AT MASIYA LAKE IN SOUTH ZONE
272888
1120/2025-26
Open
Miscellaneous Works
Works
Vadodara
3 documents required · 3 mandatory
₹10,000
Municipal Comissioner, Vadodara Municipal Corporation
₹8.0 L
4 Feb 2026
4 Feb 2026
4 Feb 2026
25 Feb 2026
4 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the
Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with Quantity Unit Rate In Amount
No brief specification and figures
reference to book of
specifications)
I/We am/are willing to carry out the work at….................... % above/below percent
(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put
to tender Deduct………% below Add .......... % Above
In Words In words
1 The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted from the bill amount as per prevailing
rules i.e. 1% of the work done.
3 Income tax TDS will be deducted from the bill amount excluding GST at a source
while making payments of bills.
(Government rules will be applicable)
4 Total value of SD i.e. 5% shall be calculated on Contract Price + GST.
FUTURISTIC PLANNING CELL
NAME: THE WORK OF RUBBER PITCHING AND CONSTRUCTION OF A STORM
WATER CHANNEL AT MASIYA LAKE IN SOUTH ZONE
Sr Item Qty Rate Rs. Per Amount
1 Conducting topographic GIS based survey of the 0.35 12250.00 Km
alignment of the proposed works using total station
equipment to capture topographic features including
manmade or natural features in a georeferenced
manner along and across the entire route of the
works, including recording the GLs and ILS of of
the existing sewers / manhole, prepare and submit
working drawings with correct levels and
contactor's preferred sewer route and indicating the
location of connecting manholes / lines to the
engineer for approval.
2 Demolition including stacking of serviceable 50.00 1073.56 CUM
materials and disposal of unserviceable materials
with all lead & lift (i) RCC Work
(R &B SOR-24-25/ P.No.147 / Ch.20, Item code:-
3 Demolition of Brick Work and Stone Masonary incl 50.00 558.57 CUM
stacking serviceable materials and disposal of
unserviceable materials with all lead & lift in
(R &B SOR-24-25 / P.No.147/ Ch.20, Item code:-
20003B, item no:-20.11)
4 Providing and supplying poly propylene steps of 50.00 50.00 NO
standard specification ,installation complete as per
direction of engineer in charge
VMC Approved Rate
5 Excavation for pipe line trenches for water supply
,sewerage line ,manhole etc all with shorting and
struting if requried as per requried gradient adn line
includin all safety provisions using site rails and
staking excavated stuff including upto requried lead
cleaning the site etc complete fro all lift and starta
a) 0.0 mt to 1.50 mt. depth 1200.00 102.35 CUM
b)1.5 mt to 3 mt. depth 400.00 112.70 CUM
(GWSSB SOR 22-23/ Labor/ Part 1 & 2B /
6 Empty boring through all sorts of strata for
providing required diameter R.C.C. bored piles to
required depth required depth( measured from
bottom of pile cap to founding level) including
providing necessary casing pipe with all plants and
equipments as required complete. 450 MM Dia Pile
(R&B SOR-2024-25, Ch27 Pg. no. 234 Item- 700.00 5375.87 Rmt.
7 Providing and cast in situ mass cement concrete M 350.00 4567.80 CUM
10 (1:3:6) using quartzite trap metal of size 12 mm
to 25 mm including consolidating etc. complete
(GWSSB SOR 22-23/Sec.1.C-RCC../ Part1
C1(RCC )/ P.NO.43 / I.NO.2
8 C.C. M-30 Control concrete for water retaining
structures : Providing and cast in situ C.C. in grade
M-30 proportions of ingredients as per mix design
by weigh batching using granite, quartzite trap
metal of size 12 mm to 20 mm and or 6 mm to
mm including scaffolding centering formwork,
needle vibrated consolidation, curing and hydraulic
testing etc. complete (excluding cost of
reinforcement) with centering and
shuttering/deshuttering etc. comp. up to 6 meter
height /depth Av. G.L.for all water retaining
8.1 For Flat Bottom Slab /Floor Slab/ Slab with 700.00 9444.95 CUM
(GWSSB SOR 22-23/Sec.1.C-RCC../
Part1C1(RCC)/P.NO.44/I.NO.7 (1)
8.2 For Above 25 CM 200.00 9295.45 CUM
(GWSSB SOR 22-23/Sec.1.C-RCC./
Part1C1(RCC)/P.NO.44/I.NO.7(9)
8.3 Beams/ring beams/girders 300.00 9758.90 CUM
(GWSSB SOR 22-23/Sec.1.C-RCC./
Part1C1(RCC)/P.NO.44/I.NO.7(5)
8.4 Columns 120.00 10714.55 CUM
(GWSSB SOR 22-23/Sec.1.C-RCC./
Part1C1(RCC)/P.NO.44/I.NO.7(10)
9 Supplying cutting, bending, binding and placing in 190.00 89129.60 MT
position steel as per plan and design and as per ISS
2502 including cost of steel and binding wire for
reservoirs/structures only including lift up to
meter height or depth below G.L. for all diameters
Do-deformed (TMT) bars confirming to relevant IS
Fe -500 grade for all diameters.
(GWSSB SOR 22-23/Sec.1.C-RCC./ Part 1(RCC
10 Refilling the Pipeline Tranches incl ramming 1600.00 25.30 CUM
,watering consolidating disposal of surplus stuff as
directed within VMC limit
(GWSSB SOR 22-23/Sec.1 (B) P.NO.40/I.NO.14
11 Dewatering by pumping set of requried capacity 16000.00 21.07 Hp/hr
incl temparary platform carting pumping at site and
fixing the same in posotion incl all accessories and
fuel and labour etc complete.
(GWSSB SOR 22-23/Sec.E P.NO.104/I.NO. 1)
Providing and filling rubbles including hand 360.00 1075.74 Cu M
12 packing and filling interstices with quarry spalls
behind abutments and between returns as directed.
(R &B SOR-24-25 / P.No.229/ Ch.27, Item code:-
Providing uncoursed rubble stone masonry in 2450.00 1075.74 Cu M
Cement Mortar 1:5 for flooring including curring
pointing in Cement Mortar 1:3 on exposed faces
(R &B SOR-24-25 / P.No.229/ Ch.27, Item code:-
14 Providing and constructing Sand Bags/cofferdam 5000.00 14.95 Per
including excavation ,filling, middle portion with Bag
B.C.soil (in empty Cement/Gunny bags) to the
entire satisfaction of EIC till completion of the
work including dismantling coffer dam after
completion of the work as directed by EIC.
(a) Bags Filled with Sand bags brought from
(GWSSB SOR 22-23/Sec.F P.NO.73/I.NO. 7.4)
15 Filling in foundation and plinth with murrum or 5751.94 215.54 Cu M
selected good soil in layers of 20cm thickness
including watering, ramming and consolidating etc.
R &B SOR-21-22 Item no. 04008A Pg.No.52)
16 Providing and fixing pre-cast Rubber Dye inter 256.78 733.18 Sqmt
locking concrete block 60mm thick with grade of
concrete M250 pnumatic compressed by
mechanically pressed and as per approved design
including 75mm Sand layer for levelling and filling
the joint with sand in proper line and level etc
(R &B SOR-21-22 Item no. 14033 Pg.No.143)
I/We am/are willing to carry out the work at… .................. % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 SBD (1).pdf
3.0 Price Bid.pdf
2.0 General Specification_02.02.2026.pdf
DWG.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .