Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
22 Jan 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
CONSIGNEE
Not Applicable
90 days
Expenditure
General
81
2 conditions · 2 needing a document upload
i) Only the manufacturers should quote and if they intend to quote through authorized agent, the authorization by the firm should be tender specific. (ii) In a tender authorized agent on behalf of the Principal/OEM or Principal/OEM itself can bid but both cannot bid simultaneously for the same item/product in the same tender. (iii) If an agent submits a bid on behalf of the Principal/OEM, the same agent shall not submit a bid on behalf of another Principal/OEM in the same tender for the same item/product. (iv) The authorised agent's/distributor's price will not exceed the price at which the manufacturer would have quoted. (v) Violation of any of the above conditions will liable the offer to be summarily rejected.
Firms to attach documentary evidence of their successful performance for tendered/similar item in Indian Railways or any Government department within last three years from the date of opening of this tender. This evidence must include: - Copies of CRN/CRAC in case of Gem/ IC and submitted along with their offer. Failure to provide this documentary evidence of successful supply will result in summary rejection of the offer. Please note that submission of only a purchase order copy will not be considered as proof of past performance.
20 conditions · 1 needing a document upload
PL check description as above
LIQUIDATED DAMAGE (LD) ON DELAYED SUPPLY: For delayed supplies, Recovery of Liquidated Damage (LD) shall be levied @1/2% (half percent) of the price of the store per week or part of the week during which delivery is accepted and the upper limit for recovery of LD in supply contracts is 10%(ten percent) of the value of contract irrespective of delays, unless otherwise provided, specifically in the contract.
Firm to note that single use plastic should not be used in packing, if material to be supplied otherwise it will be rejected. Collection of non-bio-degradables old waste after successful delivery of the product/material from consignee place will be arranged by the supplier.
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. (Denial of this condition not recommended).
Compliance of Restrictions under Rule 144 (xi) of GFR 2017:The bidders are requested to go through the land border condition uploaded with NIT. Bidders may please upload self declaration as per proforma given in clause V of Compliance of Restrictions under Rule 144 (xi) of GFR 2017
PACKING : The tendered materials are to be packed firmly secured and for safe transit to ensure the receipt on supply in good condition at destination.
Collection of Bio Waste - Collect back scheme for packing waste under SWM: Collection of non - biodegradable solid waste after successful delivery of the product / material from consignee place will be arranged by the supplier.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Gujarat · 1 Numbers total
Supply, configuration and commissioning 8 port OLT
81256241C~WR
81256241C
Open - Indigenous
Goods
Valsad, Gujarat
₹0
Exempted
22 Jan 2026
23 Dec 2025
1 item · 1 Numbers total
Supply, configuration and commissioning of 8 port OLT including Fan unit, dual power supply, basic and enhance installation kit, all type of SFPs. OLT consisting of (1) 01 OLT, 01 RU GPON OLT with 8 x GPON+2 X 10 GE (SFP+) +4x1 GE (SFP) (FTU included). - 01 No. (2) DC PSU - 02 Nos. (3) Basic installation kit for AC PSU: contains 2 AC PSU Cables, earth cable, Fasteners and NMS Cable - 01 No. (4) GPON port (OLT ) class B + SFP - 08 Nos. (5) Optical SFP+ 10 base LR/LW, STM 64, 9.95 Gbps to 11.3 Gbps, 1310 with CDR, 10 KM, duplex LC, commercial - 02 Nos. (6) 1000 base LX1310 nm, SM (10u) interfaces (10kms) - 02 Nos. ( 7) Patch Cord SC-APC to SC - APC SM - 10 Mtrs. (splitter/FDMS to ONT). (8) Patch Cord SC-SC / APC, 10 Mtrs. (PON Port to FDMS) - 08 Nos. (9) Patch Cord LC - LC single mode dia 2 mm 5 mtrs. - 08 Nos. (10) Cable ASS Y RJ - 45 to RJ - 45 shields 120 ohms clock ROHS 3 Mtrs. Make: Tejas, Syrotech, TP-Link, Genexis or VSOL. D ATA SHEET Enclosed. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SR. SECTION ENGINEER (TELE-M ) VALSAD, WR | Gujarat | 1.00 Numbers |
| Total | 1 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5635629.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .