Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.8 L
EMD Value
₹8,580
Closing Date
28 Oct 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
P.R JHA
Office of the AM (ENM), WJ Area, Moonidih
Replacement of main rope and balance rope of WEF-6 Cage Winder at Moonidih Project, WJ Area
2026_BCCL_367280_1
BCCL/WJA/AM(ENM)/26-27/RP-57
Open Tender
Miscellaneous Works
Percentage
20 days
Moonidih Colliery, WJ Area
Please Refer Tender Documents
5 documents required · 5 mandatory
₹8,580
16 Oct 2026
16 Oct 2026
30 Oct 2026
16 Oct 2026
28 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of main rope and balance rope of WEF-6 Cage Winder at Moonidih Project, WJ Area. | |||||
| 2Part A: Replacement of Main Rope of WEF-6 Cage Winder | |||||
| 2.01 | Placing of new 60mm drum on stand and coiling on which at shaft No#1 | 1 | Job | 24,169.6 | ₹24,169.6 |
| 2.02 | Resting of cage No.#3 at surface and cage No#4 at 500MH pit bottom by the help of joists | 1 | Job | 24,169.6 | ₹24,169.6 |
| 2.03 | Placing of diversion pulley in front of cage No#3 and clamping of old and new rope with the help of 8 nos. U-clamp above Cage No.#3 | 1 | Job | 24,169.6 | ₹24,169.6 |
| 2.04 | Pulling out the old rope at 500MH and passing new rope through two nos. head gear pulley and winder drum | 1 | Job | 48,339.2 | ₹48,339.2 |
| 2.05 | Fitting of CSG with new rope end on Cage No#4 at 500MH and tightening all clamp bolts of CSG | 1 | Job | 36,254.4 | ₹36,254.4 |
| 2.06 | Winder drum clamping 5 Nos. and head gear pulley clamping 2 Nos. | 1 | Job | 24,169.6 | ₹24,169.6 |
| 2.07 | Fitting of CSG on Cage No.#3 at surface and tightening all clamp bolts of CSG | 1 | Job | 36,254.4 | ₹36,254.4 |
| 2.08 | Dismantling of all clamp fitted on winder drum and head gear pulley and removing of joits from Cage No.#4 and Cage No#3 | 1 | Job | 24,169.6 | ₹24,169.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_380224.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .