Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Restoration of Thuleta bund H.R. structure at vill. Thuleta, Ta. Viramgam, Dist. Ahmedabad under Sanand Irrigation Sub Division, Sanand
281791
22 of 2025-26
Open
Civil Works - Water Works
Works
Ahmedabad
6 documents required · 5 mandatory · 1 optional
₹6,000
Yes
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹3.3 L
Yes
27 Feb 2026
27 Feb 2026
27 Feb 2026
30 Mar 2026
27 Feb 2026
BILL OF QUANTITY
Name of Restoration of Thuleta bund H.R. structure at vill. Thuleta, Ta. Viramgam, Dist.
work: Ahmedabad under Sanand Irrigation Sub Division, Sanand.
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
Dismentalling of RCC work viz. slab,beam, lintel, barrel,
staire case, etc. including removing the steel from the
dismentalled portion without damage to reinforcement
1 sorting and stacking of useful and unuseful material 32.00 Cum. 1494.00
from the dismentalled material as directed under
detailed specification etc. complete. upto lead 200 mt.
Dismentalling masonary in lime or cement &
stacking of useful and unuseful material from the
dismentalled materials as directed under detailed
specification etc. comp. (a) Brick.
Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy,
gravelly soil including soft murrum & H.M.
including sorting & stacking and depositing the
3 excavated stuff in uniform layers as and where 3871.33 Cum. 75.00
directed upto lead of 30 mt. and lift as shown
below including clearing the site etc. complete.
(Including dewatering) (Dumper capacity =
M.T) (B) For foudation trenches of C.D. work .
Providing and laying foundation concrete of
proportion as under by using cement, sand and
machine crushed course aggregate laid in situ
including necessary temping, smooth finishing,
4 watering and curing as directed with all leads and 317.63 Cum. 3559.00
lifts etc complete. (a) PCC 1:3:6 (MSA 40)
Providing and laying in position reinforce cement
concrete using crushed aggregate including
providing necessary form work, centering,
vibrating, smooth specified finishing, curring as
requiredfor specifiedleadsand all
lifts etc complete in M-25 grade. For
walls, including top and bottom slab of outlet sluice
etc complete.(20MSA)
Providing and laying in position Ready Mixed
concrete for reinforced cement concrete work,
using cement content as per approved design Mix
manufactured in fully automatic batching plant and
transported to site of work intransitmixer for a lead
upto 10 kms having contiouous agitated mixer,
manufactured as per mix design of specitied grade
for reinforced cementconcrete work including
pumping of R.M.C from transitmixer to site of
6 laying by BoomPlacer, inculding the cost of 2842.2 Cum. 8719.00
centering shuttering finishing including cost of
admixtures in recommended proportions as per
IS:9103 to accelerate / retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer-in-
charge without flyash for Retaining Wall & Other
Vertical Members as per drawing. MSA 20mm.
Cosider Cement Level : 360 kg
Providing and laying H.Y.S.D. steel bar
reinforcement for R.C.C. works and anchor bars
with providing binding wires including cutting,
7 bending, welding, binding in position, hooking, 21.04 MT 72949.00
placing in position with all leads & lifts etc.
complete. (C) For TMT Bars (fe-500 D)
Backfill with selected earth including ramming
consolidation including watering with lead as
under and all lifts etc. complete. (Dumper capacity
BILL OF QUANTITY
Name of Restoration of Thuleta bund H.R. structure at vill. Thuleta, Ta. Viramgam, Dist.
work: Ahmedabad under Sanand Irrigation Sub Division, Sanand.
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
Providing weep holes in the retaining wall with req.
9 pipe, fixtures as directed etc complete. (b)P.V.C. 239.70 Rmt. 314.00
Pipe (6kgf/sq.cm, 110mm)
Providing and laying dry rubble loose stone apron
10 including packing filling interstice with quarry spalls 864.00 Cum. 2084.00
Providing cement plaster of cement & sand to
brick masonary including racking out joint with
scaffolding finishing watering curing etc. complete.
(a) 20 mm thick C.M. 1:2
Painting two coats of synthetic enamel with one
coat of primer of approved shade on steel surface
to give an even shade including cleaning the
12 surface of all dirt, dust, corrosion and other foreign 37.50 Smt. 120.00
matter etc complete as per specification.
Oiling & greasing to gates & its components of
Barrage incl. Removing of old grease. Cleaning the
surface and embeded parts and applying new
13 grease to gates and its components as directed 37.50 Smt. 323.00
14 Engaging JCB- 2DX(0.3 cm) 24.00 Hr 894.15
Dry rolling of earth work with light rollers (upto
ton capacity) as directed with all lifts etc. complete.
Providing and fixing G.I.Pipe railing ( B-class
medium duty ) as per design of 1.0 mt
height,using 75x75x10 mm size M.S Angle at
16 mt c/c for vertical posts and 38 mm dia G.I.Pipe 176.00 Rmt. 1942.00
for 4 horizontal rows incl one coat of red oxide
primer & two coats of oil paint etc complete
Care and diversion of river including required 1.5% of
dewatering during construction of spillway and
allied works as prescribed and directed etc.
1.00 Job item no.
(In words Rupees Three crore Twenty six Lakhs sixty six Thousands Nine Hundred Forty Nine rupees
and Eighty Three Paisa only)
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book Thuleta HR 1 1.pdf
Tender notice 22 of 2025-26 -for CD and publication.pdf
sch B Thuleta Hr.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .