Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.5 LAccepted-AOC | 1 | Accepted-AOC allotted | |
| 2 | Not Admitted-Finance RASUL PUR RASUL PUR 133204 | YAMUNANAGAR | HARYANA | 133204 | - | Not Admitted-Finance Price Bid not complied | |
| 3 | Not Admitted-PreQual/Technical BHIWANI | BHIWANI | HARYANA | 127021 | - | Not Admitted-PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied | |
| 5 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied |
Tender Value
₹15.6 L
EMD Value
₹31,160
Closing Date
26 Jun 2021, 5:00 pmClosed
EE NARAINGARH
PD Naraingarh
PROVIDING INTERLOCKING PAVER BLOCK OF LINK ROAD FROM SADHAURA - BILASPUR ROAD TO BHIL CHHAPPER IN YAMUNA NAGAR DISTT (ID 972)
2021_HRY_172139_2
PROVIDING INTERLOCKING PAVER BLOCK OF LINK ROAD
Open Tender
Civil Works - Roads
Works
90 days
YAMUNA NAGAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹31,160
Yes
3 Dec 2021
14 Jun 2021
29 Jun 2021
14 Jun 2021
26 Jun 2021
14 Jun 2021
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks for safe disposal with all leads and lifts complete in all respects. Note: - The quantity of milled bituminous mix material shall be a recovery item as mention in BOQ item No.
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing, dry brick work {HSR 8.5 (i)}
Earth work excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 metres, and an average vertical lift upto 0.5 metre including breaking of clods Excavated earth may be reused on berms and deposed off surplus earth with all lead and lift including dressing complete in territorial as per direction of Engineer-in-charge will be incidental to work and nothing will be paid.(NS)
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing & laying 150 mm thick (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and laying 80mm thick interlocking paver blocks ISI marked (IS code: 15658:2006) of all shapes and colours in design mix cement M-40 as per IRC:SP:63-2004, over a bed of 30 mm thick fine sand complete in all respects. (HSR 10.159)
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position on end edging of interlocking paver blocks on both sides.
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note: - No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and side of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15cm layers with compaction including disposal of all surplus soil, as directed within a lead of 30 metres [HSR 6.6]
Cement concrete 1:4:8 with stone aggregate 40 mm nominal size in foundation and plinth (HSR.10.39)
Cement concrete 1:2:4 with stone aggregate 20 mm nominal size (HSR. 10.59 ) Toping
First class brick work laid in cement sand mortar 1:4 in foundation and plinth.(HSR.11.4)
Cement pointing 1:2 deep variety on brick & tile work (HSR 15.60)
Providing and fixing RCC village boards 1.85x0.90x0.075 mtr with CC 1:1 ½:3 including cost of steel and 6 mm thick CM Plaster 1:4, loading and unloading carriage at site of work, fixing at site in CC 1:4:8 and painting sign boards with synthetic enamel paint two coat complete in all respect as per drawing and design.
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Recovery Item The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Good Brick @ Rs. 4.50/ Each
Brick bats @ Rs. 400.00 / cum
Bituminous mix material @ Rs. 1331.00 P.Cum. Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .