Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 L+₹44,941.20 (13.1%)Rejected-Finance | ₹3.9 L+₹44,941.20 (13.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 L+₹18,879.76 (5.50%)Rejected-Finance VELLANKULAMATTATHIL HOUSE KANNARAGOD 671 | KANNARAGOD | KERALA | ₹3.6 L+₹18,879.76 (5.50%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Manoj Varkey L1 | JACOB E J L3 | Benny Jose L2 |
|---|---|---|---|---|---|---|
| 1.00Drainage | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 54.18 | cum | 199.75 ₹10,822.46 Lowest | 233.78 ₹12,666.2 | 210.73 ₹11,417.35 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.74 | cum | 6,365.76 ₹49,270.98 Lowest | 7,198.61 ₹55,717.24 | 6,715.76 ₹51,979.98 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 20.64 | cum | 6,730 ₹1,38,907.2 Lowest | 7,590.33 ₹1,56,664.41 | 7,100.03 ₹1,46,544.62 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.15 | cum | 7,411.43 ₹15,934.57 Lowest | 8,381.08 ₹18,019.32 | 7,818.93 ₹16,810.7 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.29 | cum | 8,416.74 ₹78,174.68 Lowest | 9,517.92 ₹88,402.44 | 8,879.51 ₹82,472.89 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 557.28 | kilogram | 90.21 ₹50,272.23 Lowest | 102.02 ₹56,853.71 | 95.17 ₹53,036.34 |
Tender Value
₹4.0 L
EMD Value
₹10,064
Closing Date
25 Oct 2025, 5:00 pmClosed
AssistantEngineer
Balal GP
Construction of drainage
2025_LSGD_810904_9
AE/LSGD/BGP/TEN/04/25-26
Open Tender
Civil Works - Others
Item Rate
Balal GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹890
Yes
₹10,064
Yes
17 Jul 2026
17 Oct 2025
28 Oct 2025
17 Oct 2025
25 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1354560.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
SBD.pdf
Tender Documents • 0.96 MB
BOQ_1354560.xls
BOQ • 0.30 MB
PRELINIARYAGREEMENT.pdf
Tender Documents • 0.26 MB
affidavit.pdf
Tender Documents • 0.24 MB
FORMOFTENDER.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .