| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.9 LAdmitted-Finance | ₹79.9 L | L1 | Admitted-Finance |
| 2 | L2₹99.9 L+₹20.0 L (25.0%)Admitted-Finance NO 3 WD BUILDING JP AGARWALLA ROAD BHARALUMUKH KAMRUP ASSAM 781009 UDYAM AS 03 0009483 | KAMRUP METRO | ASSAM | 781009 | ₹99.9 L+₹20.0 L (25.0%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 Cr+₹21.8 L (27.3%)Admitted-Finance | ₹1.0 Cr+₹21.8 L (27.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 Cr+₹23.4 L (29.3%)Admitted-Finance OPP BSF GATE NO 3 AZARA GUWAHATI 17 ASSAM | ₹1.0 Cr+₹23.4 L (29.3%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹26.4 L (33.0%)Admitted-Finance COLLEGE ROAD CHABUA PO CHABUA DIST DIBRUGARH ASSAM 786184 | DIBRUGARH | ASSAM | 786184 | ₹1.1 Cr+₹26.4 L (33.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PURBANCHAL BUILDERS L2 | M/s Dhani Enterprise L4 | M/s PRABIR ENTERPRISE L5 | SNEH CORPORATION L3 | M/S. SUBHAS CONSTRUCTION CO. L7 | M/s Dhruv Enterprises L6 | M/s Raj Infra L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Trenches not exc 1.50 Metre wide and not exc 1.50 Metre depth for laying of UG Cable/Pole/Stays etc getting out in Soft/Loose Soil, complete all as specified and as directed. | 367.2 | Cum | 289 ₹1,06,120.8 | 388 ₹1,42,473.6 | 190 ₹69,768 Lowest | 350 ₹1,28,520 | 300 ₹1,10,160 | 265 ₹97,308 | - |
| 2.00 | Excavating in Trenches, not exc. 1.50 Metre wide and exc. 1.50 Metre but not exc. 3.00 Metre in depth, for Foundation of Poles/ Stays, etc. and getting out in Soft/ Loose Soil, complete all as specified and as directed. | 4 | Cum | 299 ₹1,196 | 397 ₹1,588 | 182 ₹728 Lowest | 350 ₹1,400 | 300 ₹1,200 | 265 ₹1,060 | - |
| 3.00 | Returning, Filling in including Spreading, Levelling, Watering and Well Ramming in layers not exc. 25 Cm thick in Soils, complete all as specified and as directed. | 230 | Cum | 99 ₹22,770 | 133 ₹30,590 | 80 ₹18,400 Lowest | 105 ₹24,150 | 110 ₹25,300 | 125 ₹28,750 | - |
| 4.00 | Removing Surplus Soil to a distance not exc 50.00 Metre away and depositing where directed at a level not exc 1.50 Metre above the Starting Point, complete all as specified and as directed. | 141.2 | Cum | 279 ₹39,394.8 | 312 ₹44,054.4 | 105 ₹14,826 Lowest | 320 ₹45,184 | 2,500 ₹3,53,000 | 240 ₹33,888 | - |
| 5.00 | Dismantling unserviceable Steel Tubular Poles of any description and any size including demolition of Cement Concrete (as/if required) and made good disturbed Ground, complete all as specified and as directed.
NOTE : Unserviceable Poles will be dismantled at Ground Level and disturbed ground will made good as directed for which Earthwork, demolition of Cement Concrete, etc. will not be measured and paid separately. | 7 | Each | 599 ₹4,193 | 998 ₹6,986 | 455 ₹3,185 Lowest | 800 ₹5,600 | 670 ₹4,690 | 800 ₹5,600 | - |
| 6.00 | Dismantling Stay Assembly of any description and any size including Mild Steel Clamps with Bolts, Nuts and Washers etc., complete all as specified and as directed.
NOTE: Unserviceable Stay Assembly will be dismantled at Ground Level and disturbed ground will be made good as directed for which Earthwork, demolition of Cement Concrete, etc. will not be measured and paid separately. | 4 | Each Set | 219 ₹876 | 265 ₹1,060 | 320 ₹1,280 | 150 ₹600 Lowest | 210 ₹840 | 340 ₹1,360 | - |
| 7.00 | Dismantling Cross-Arms of Mild Steel Channel or Angle Sections, etc, including Mild Steel Bolts, Nuts, Washers, etc., and segregating aside for serviceable for re-use complete all as specified and as directed. | 5 | Qtl | 199 ₹995 | 144 ₹720 | 180 ₹900 | 185 ₹925 | 125 ₹625 Lowest | 200 ₹1,000 | - |
| 8.00 | Dismantling Insulators like Pin type, Shackle type from existing Electric Poles of any description and any size, segregating Serviceable Insulators and keep in safe custody for re-use, complete all as specified and as directed. | 110 | Each | 9 ₹990 Lowest | 78 ₹8,580 | 9 ₹990 Lowest | 15 ₹1,650 | 70 ₹7,700 | 15 ₹1,650 | 20 ₹2,200 |
| 9.00 | Dismantling ACSR or AAC Conductors from the Disturbed Span including Line Spacer, etc., complete all as specified and as directed. | 9 | Qtl | 599 ₹5,391 | 355 ₹3,195 | 450 ₹4,050 | 400 ₹3,600 | 320 ₹2,880 Lowest | 410 ₹3,690 | 500 ₹4,500 |
| 10.00 | Dismantling Earth Wire, Cradle Guarding, etc., complete all as specified and as directed. | 1 | Qtl | 199 ₹199 | 264 ₹264 | 275 ₹275 | 100 ₹100 Lowest | 225 ₹225 | 155 ₹155 | 310 ₹310 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
30 Jul 2026, 6:00 pmClosed
SHRI SAURABH, IDSE, CWE
HQ CWE Tenga PIN - 900194 c/o 99 APO
REPAIR/MAINTENANCE OF HT LINE, MARSHALLING YARD, MRS, DIFFERENT 11 KV SUB STATION INCL REPAIRS OF TRANSFORMER AND CONNECTED OTHER WORKS AT SOUTH OF RLY LINE UNDER GE MISSAMARI
2026_MES_774864_1
8640/E8
Open Tender
Civil Works
Item Rate
180 days
GE Missamari
B (b) (ii)
8 documents required · 8 mandatory
₹1,000
Yes
GE MISSAMARI
₹1.8 L
Yes
9 Sept 2026
26 Jun 2026
6 Aug 2026
26 Jun 2026
30 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Trenches not exc 1.50 Metre wide and not exc 1.50 Metre depth for laying of UG Cable/Pole/Stays etc getting out in Soft/Loose Soil, complete all as specified and as directed. | 367.2 | Cum | 100 | ₹36,720 |
| 2 | Excavating in Trenches, not exc. 1.50 Metre wide and exc. 1.50 Metre but not exc. 3.00 Metre in depth, for Foundation of Poles/ Stays, etc. and getting out in Soft/ Loose Soil, complete all as specified and as directed. | 4 | Cum | 100 | ₹400 |
| 3 | Returning, Filling in including Spreading, Levelling, Watering and Well Ramming in layers not exc. 25 Cm thick in Soils, complete all as specified and as directed. | 230 | Cum | 100 | ₹23,000 |
| 4 | Removing Surplus Soil to a distance not exc 50.00 Metre away and depositing where directed at a level not exc 1.50 Metre above the Starting Point, complete all as specified and as directed. | 141.2 | Cum | 100 | ₹14,120 |
| 5 | Dismantling unserviceable Steel Tubular Poles of any description and any size including demolition of Cement Concrete (as/if required) and made good disturbed Ground, complete all as specified and as directed.
NOTE : Unserviceable Poles will be dismantled at Ground Level and disturbed ground will made good as directed for which Earthwork, demolition of Cement Concrete, etc. will not be measured and paid separately. | 7 | Each | 100 | ₹700 |
| 6 | Dismantling Stay Assembly of any description and any size including Mild Steel Clamps with Bolts, Nuts and Washers etc., complete all as specified and as directed.
NOTE: Unserviceable Stay Assembly will be dismantled at Ground Level and disturbed ground will be made good as directed for which Earthwork, demolition of Cement Concrete, etc. will not be measured and paid separately. | 4 | Each Set | 100 | ₹400 |
| 7 | Dismantling Cross-Arms of Mild Steel Channel or Angle Sections, etc, including Mild Steel Bolts, Nuts, Washers, etc., and segregating aside for serviceable for re-use complete all as specified and as directed. | 5 | Qtl | 100 | ₹500 |
| 8 | Dismantling Insulators like Pin type, Shackle type from existing Electric Poles of any description and any size, segregating Serviceable Insulators and keep in safe custody for re-use, complete all as specified and as directed. | 110 | Each | 100 | ₹11,000 |
| 9 | Dismantling ACSR or AAC Conductors from the Disturbed Span including Line Spacer, etc., complete all as specified and as directed. | 9 | Qtl | 100 | ₹900 |
| 10 | Dismantling Earth Wire, Cradle Guarding, etc., complete all as specified and as directed. | 1 | Qtl | 100 | ₹100 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TENDERDOCUMENT8640.pdf
Tender Documents • 1.48 MB
BOQ_867674.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .