Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC PALAKEEZHI HOUSE MUNDUR P O PALAKKAD DISTRICT | PALAKKAD | KERALA | 678001 | 1 | Accepted-AOC Accepted | |
| 2 | 2₹18.3 L+₹16.6 L (990.0%)Rejected-AOC MARUTHADIKALAM KOOMANKADU THATHAMANGALAM PALAKKAD | PALAKKAD | KERALA | 678001 | 2 | Rejected-AOC Rejected |
Tender Value
₹2.3 L
EMD Value
₹5,707
Closing Date
3 Oct 2022, 4:00 pmClosed
Assistant Executive Engineer
Head work sub Division Malampuzha
Clearing jungle,earth work excavation
2022_Irrig_510578_1
IRR/PI/TR/3412/2022_5_1_1/2-13
Open Tender
Repair and Maintenance Works
Item Rate
240 days
Kavilppad
Please refer to Tender Docuument
7 documents required · 7 mandatory
₹555
Yes
₹5,707
Yes
31 Oct 2022
26 Sept 2022
7 Oct 2022
26 Sept 2022
3 Oct 2022
27 Sept 2022
Amount
site clearance second crop nov-
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
Excavation SILT - Second crop -Nov
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
FIRST crop -- site clearence
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>
FIRST CROP - silt
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
M.K.SARVADHAMANAN
Bidder Name
M.K.SARVADHAMANAN
VASUDEVAN P C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_731474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .