Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC work awarded | |
| 2 | L1₹10.9 LRejected-Finance | L1 | Rejected-Finance EE RECOMMEDATION | |
| 3 | L2₹9.0 L−₹2.0 L (18.0%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹13.6 L
EMD Value
₹27,300
Closing Date
8 Sept 2023, 4:00 pmClosed
EE XII WRD
Gogal Margao
Construction of Protection wall in Sy.No. 10/1 Portem Vaddem near Ganapati Visarjan Shed V.P Vaddem-Curdi in Sanguem Taluka.
2023_WRD_10833_1
WDXII/TECH/F10/8e/2023-24/sr3
Open Tender
Civil Works
Item Rate
60 days
Gogal Margao
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹27,300
31 Oct 2023
24 Aug 2023
12 Sept 2023
24 Aug 2023
8 Sept 2023
24 Aug 2023
Amount
Earthwork in excavation by mechanical/manual mean in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated or weatheres rock, fissured/ shattered, decomposed rock and such materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc.but blasting prohibited all condition such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/dewatering including setting out constructed shoring and bracing, removal of stump and other deletorious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil, rock at specified areas within 50m leads and lifts etc as per specification and drawing and as directed by the Engineer-in-charge etc.complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
b)vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge: a) 110mm dia
Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows complete with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete.
HRISHIKESH CONSTRUCTION
P K THOMAS & SON
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .