Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | -36.56% | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 LAdmitted-Finance VEENA KUNJ KARMIK NAGAR ISM DHANBAD DHANBAD 826004 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826004 | -28.40% | ₹4.5 L | L2 | Admitted-Finance |
| 3 | L3₹4.9 LAdmitted-Finance VILL BHOJUDIH P O MAHARAJGANJ DHANBAD 828109 JH | DHANBAD | JHARKHAND | 828109 | -22.30% | ₹4.9 L | L3 | Admitted-Finance |
| 4 | L4₹5.0 LAdmitted-Finance | -21.21% | ₹5.0 L | L4 | Admitted-Finance |
| 5 | L5₹5.5 LAdmitted-Finance KARMIK NAGAR SARAIDHELA DHANBAD 828127 JH | DHANBAD | DHANBAD | JHARKHAND | 828127 | -12.53% | ₹5.5 L | L5 | Admitted-Finance |
Tender Value
₹7.4 L
EMD Value
₹9,300
Closing Date
9 May 2026, 6:00 pmClosed
GM(EandM)I/C
KOYLA BHAWAN
Work of Repairing and renovation (Surging and flushing) of 03 Nos of Old Bore Hole in CMD Bunglow Karmik Nagar
2026_BCCL_358806_1
BCCL/KB/ENM/WS/OT/26-27/03
Open Tender
Electrical and Maintenance Works
20 days
DHANBAD
Please refer Tender documents.
11 documents required · 11 mandatory
₹9,300
28 May 2026
28 Apr 2026
11 May 2026
29 Apr 2026
9 May 2026
29 Apr 2026
29 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work of Repairing and renovation (Surging and flushing) of 03 Nos of Old Bore Hole in CMD Bunglow Karmik Nagar, Water Supply, E&M, Central Township, HQ. | - | - | - | - |
| 2 | Repairing and renovation (Surging & Flushing) 8" dia bore hole by DTH Machine 90 Mtr to 150 Mtr. | 450 | M | 676 | ₹3,04,200 |
| 3 | Providing Long thread GI Socket Size -100 X 50 MM | 75 | EA | 241.52 | ₹18,114 |
| 4 | Lifting the pipe with dismentaling all the fitting from the Bore Hole | 3 | NO | 3,980 | ₹11,940 |
| 5 | Lowering the pipe with pump and fitting all parts and fitting put on the operation | 3 | EA | 4,170 | ₹12,510 |
| 6 | GI pipe providing and fixing with all fitting 50 mm dia nominal bore | 240 | M | 769.2 | ₹1,84,608 |
| 7 | Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete.100 mm clamp | 6 | EA | 1,203.9 | ₹7,223.4 |
| 8 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete :50 to 80 mm nominal bore | 8 | EA | 1,257.9 | ₹10,063.2 |
| 9 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) : 50mm nominal bore | 6 | EA | 523.95 | ₹3,143.7 |
| 10 | Providing Flat Cable 1.1KV, 3 Core, 6Sqmm, copper Conductor. | 400 | M | 194.91 | ₹77,964 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_371714.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid