Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹2.2 L
Closing Date
7 Dec 2018, 3:00 pmClosed
SRI BRAMARAMBA MALLIKARJUNA SWAMY DEVASTHANAM, SRISAILAM, KURNOOL DIST
Investigation, Design & construction of Physical Infrastructure and Social Infrastructure in EWS layouts at Nuziveedu, Tiruvuru, Vuyyuru, Jaggayyapeta ULBs in Krishna, Addanki, Giddaluru, Kanigiri, Ongole ULBs in Prakasam, Tadepalligudem, Bhimavaram, Palakollu ULBs in West Godavari and Design, Supply, Construction, Installation, Testing and Commissioning of fifteen (15) Sewage Treatment Plants (STPs) of a total capacity of 14.60MLD (Jaggayyapeta-1.70MLD, Nuziveedu-2.0MLD, Tiruvuru1-0.60MLD, Tiruvuru2-0.60MLD, Vuyyuru1-0.60MLD, Vuyyuru2-0.90MLD, Vuyyuru3-0.10MLD, Tadepalligudem1-2.00MLD, Tadepalligudem2-0.50MLD, Tadepalligudem3-0.20MLD, Palakollu1-0.40MLD, Palakollu2-3.00MLD, Addanki-0.80MLD, Kanigiri-0.50MLD & Giddaluru-0.70MLD) based on any appropriate technology (Technology neutral) with post completion O&M of entire STPs for 7 (Seven) years including 2 (Two) years Defect Liability Period under PMAY-HFA(U) scheme om Lump sum contract (Percentage Tender) (With DLP of 2 years).
173687
H3/704/2018 - Development of shrubbery plantation opposite Shivaji Gopuram Mada street both sides (678Sqm) and central media opposite Vasavi satram (94Sqm)
OPEN - NCB
Works
Andhra Pradesh
22 Dec 2018
23 Feb 2018
7 Dec 2018
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .