| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC HIMACHAL PRADESH HP | ₹4.5 L Quoted ₹5.0 L | L1 | Accepted-AOC Award |
| 2 | L2₹5.4 LRejected-Finance HIMACHAL PRADESH HP | ₹5.4 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹5.4 LRejected-Finance | ₹5.4 L | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | GULZARI LAL L1 | Raj Kumar Prop R.K. Construction L2 | Tehal Dass L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations trenches etc in all kinds of soil such as pick jumper work blasting and chiselling soft / hard rock where blasting is prohibited in all leads and lifts i/c trimming & dressing of side levelling of bed stacking the excavated soil in 15 Cm layers when required in to Plinth sides of foundations etc including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting timbering & dewatering where ever required complete in all respect as per the direction & to the entire satisfaction of Engineer in Charge in all leads and lifts. | 12.82 | Cum | 400 ₹5,128 | 420 ₹5,384.40 | 450 ₹5,769 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in foundation and plinth in all leads and lifts. | 5.13 | Cum | 7,500 ₹38,475 | 7,700 ₹39,501 | 7,800 ₹40,014 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundations, footings, bases of columns, tec. For mass concrete in all leads and lifts. | 4.1 | Sqm. | 250 ₹1,025 | 280 ₹1,148 | 300 ₹1,230 |
| 4.00 | Wire crate made of GI wire filled with boulder with square cut faces against the wire (Boulder filling to be measured and paid for separately ) double twisted GI wire 5mm thick 15cmx15cm mesh)corresponding to SWG-6 as per direction and to the entire satisfaction of the Engineer-in-charge. | 515.63 | Sqm. | 430 ₹2.2 L | 470 ₹2.4 L | 490 ₹2.5 L |
| 5.00 | Wire crate made of GI wire filled with boulders with square cut faces against the wire (wire crate to be measured and paid for separately) the weight of each boulder should not less than 18 kg and as per entire satisfaction of the Engineer-in-charge)in all leads and lifts. | 128.91 | cum | 1,830 ₹2.4 L | 1,930 ₹2.5 L | 1,890 ₹2.4 L |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
11 Apr 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
Construction of wire Crate Protection around retaining wall at Bhiuli near Home Guard Ground
2026_HPIPH_133360_1
304-403
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹10,000
18 May 2026
4 Apr 2026
13 Apr 2026
4 Apr 2026
11 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in foundations trenches etc in all kinds of soil such as pick jumper work blasting and chiselling soft / hard rock where blasting is prohibited in all leads and lifts i/c trimming & dressing of side levelling of bed stacking the excavated soil in 15 Cm layers when required in to Plinth sides of foundations etc including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting timbering & dewatering where ever required complete in all respect as per the direction & to the entire satisfaction of Engineer in Charge in all leads and lifts. | - | Cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in foundation and plinth in all leads and lifts. | - | Cum | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundations, footings, bases of columns, tec. For mass concrete in all leads and lifts. | - | Sqm. | - | - | |
Wire crate made of GI wire filled with boulder with square cut faces against the wire (Boulder filling to be measured and paid for separately ) double twisted GI wire 5mm thick 15cmx15cm mesh)corresponding to SWG-6 as per direction and to the entire satisfaction of the Engineer-in-charge. | - | Sqm. | - | - | |
Wire crate made of GI wire filled with boulders with square cut faces against the wire (wire crate to be measured and paid for separately) the weight of each boulder should not less than 18 kg and as per entire satisfaction of the Engineer-in-charge)in all leads and lifts. | - | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.56 MB
Form8.pdf
Tender Documents • 1.14 MB
BOQ_197199.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid